blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2251550

EP2251550 - mobile construction machine with a hydraulic system [Right-click to bookmark this link]
Former [2010/46]Hydraulic system and mobile construction machine
[2018/13]
StatusNo opposition filed within time limit
Status updated on  19.07.2019
Database last updated on 31.08.2024
FormerThe patent has been granted
Status updated on  10.08.2018
FormerGrant of patent is intended
Status updated on  10.04.2018
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Liebherr-France SAS
2, Avenue Joseph Rey
68005 Colmar Cedex / FR
[2018/37]
Former [2010/46]For all designated states
Liebherr-France SAS
2, Avenue Joseph Rey
68005 Colmar Cedex / FR
Inventor(s)01 / Helbling, Frank
Weinstrasse 19
79361 Sasbach / DE
02 / Graebling, Cyril
22a, Chemin Hirzensteg
68000 Colmar / FR
 [2010/46]
Representative(s)Laufhütte, Dieter, et al
Lorenz Seidler Gossel
Rechtsanwälte Patentanwälte
Partnerschaft mbB
Widenmayerstraße 23
80538 München / DE
[2018/37]
Former [2010/46]Laufhütte, Dieter, et al
Lorenz-Seidler-Gossel Widenmayerstrasse 23
80538 München / DE
Application number, filing date10004221.721.04.2010
[2010/46]
Priority number, dateDE20092006299U29.04.2009         Original published format: DE 202009006299 U
[2010/46]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP2251550
Date:17.11.2010
Language:DE
[2010/46]
Type: A3 Search report 
No.:EP2251550
Date:06.11.2013
Language:DE
[2013/45]
Type: B1 Patent specification 
No.:EP2251550
Date:12.09.2018
Language:DE
[2018/37]
Search report(s)(Supplementary) European search report - dispatched on:EP07.10.2013
ClassificationIPC:E02F3/42, F15B11/22, F15B20/00
[2018/13]
CPC:
F15B11/22 (EP,US); E02F9/2203 (EP,US); F15B20/005 (EP,US);
F15B2211/40553 (EP,US); F15B2211/40584 (EP,US); F15B2211/465 (EP,US);
F15B2211/7128 (EP,US) (-)
Former IPC [2010/46]F15B11/22, F15B20/00, E02F3/42
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2018/37]
Former [2010/46]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Mobile Baumaschine mit einem Hydrauliksystem[2018/13]
English:mobile construction machine with a hydraulic system[2018/13]
French:Engin de construction mobile avec un système hydraulique[2018/13]
Former [2010/46]Hydrauliksystem sowie mobile Baumaschine
Former [2010/46]Hydraulic system and mobile construction machine
Former [2010/46]Système hydraulique et engin de construction mobile
Examination procedure02.05.2014Amendment by applicant (claims and/or description)
02.05.2014Examination requested  [2014/25]
11.04.2018Communication of intention to grant the patent
06.08.2018Fee for grant paid
06.08.2018Fee for publishing/printing paid
06.08.2018Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  11.04.2018
Opposition(s)13.06.2019No opposition filed within time limit [2019/34]
Fees paidRenewal fee
24.04.2012Renewal fee patent year 03
25.04.2013Renewal fee patent year 04
24.04.2014Renewal fee patent year 05
23.04.2015Renewal fee patent year 06
10.03.2016Renewal fee patent year 07
24.04.2017Renewal fee patent year 08
27.04.2018Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.04.2010
CY12.09.2018
CZ12.09.2018
DK12.09.2018
EE12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
MC12.09.2018
MK12.09.2018
MT12.09.2018
PL12.09.2018
RO12.09.2018
SI12.09.2018
SK12.09.2018
SM12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
PT12.01.2019
IE21.04.2019
LU21.04.2019
BE30.04.2019
[2022/31]
Former [2021/34]HU21.04.2010
CY12.09.2018
CZ12.09.2018
DK12.09.2018
EE12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
MC12.09.2018
MT12.09.2018
PL12.09.2018
RO12.09.2018
SI12.09.2018
SK12.09.2018
SM12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
PT12.01.2019
IE21.04.2019
LU21.04.2019
BE30.04.2019
Former [2021/32]HU21.04.2010
CY12.09.2018
CZ12.09.2018
DK12.09.2018
EE12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
MC12.09.2018
PL12.09.2018
RO12.09.2018
SI12.09.2018
SK12.09.2018
SM12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
PT12.01.2019
IE21.04.2019
LU21.04.2019
BE30.04.2019
Former [2021/26]CY12.09.2018
CZ12.09.2018
DK12.09.2018
EE12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
MC12.09.2018
PL12.09.2018
RO12.09.2018
SI12.09.2018
SK12.09.2018
SM12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
PT12.01.2019
IE21.04.2019
LU21.04.2019
BE30.04.2019
Former [2020/21]CZ12.09.2018
DK12.09.2018
EE12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
MC12.09.2018
PL12.09.2018
RO12.09.2018
SI12.09.2018
SK12.09.2018
SM12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
PT12.01.2019
IE21.04.2019
LU21.04.2019
BE30.04.2019
Former [2020/12]CZ12.09.2018
DK12.09.2018
EE12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
MC12.09.2018
PL12.09.2018
RO12.09.2018
SI12.09.2018
SK12.09.2018
SM12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
PT12.01.2019
LU21.04.2019
BE30.04.2019
Former [2020/04]CZ12.09.2018
DK12.09.2018
EE12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
MC12.09.2018
PL12.09.2018
RO12.09.2018
SI12.09.2018
SK12.09.2018
SM12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
PT12.01.2019
LU21.04.2019
Former [2020/02]CZ12.09.2018
DK12.09.2018
EE12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
MC12.09.2018
PL12.09.2018
RO12.09.2018
SI12.09.2018
SK12.09.2018
SM12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
PT12.01.2019
Former [2019/37]CZ12.09.2018
DK12.09.2018
EE12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
PL12.09.2018
RO12.09.2018
SI12.09.2018
SK12.09.2018
SM12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
PT12.01.2019
Former [2019/34]CZ12.09.2018
DK12.09.2018
EE12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
PL12.09.2018
RO12.09.2018
SK12.09.2018
SM12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
PT12.01.2019
Former [2019/26]CZ12.09.2018
EE12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
PL12.09.2018
RO12.09.2018
SK12.09.2018
SM12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
PT12.01.2019
Former [2019/24]CZ12.09.2018
EE12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
PL12.09.2018
RO12.09.2018
SK12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
Former [2019/22]CZ12.09.2018
FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
PL12.09.2018
RO12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
Former [2019/21]FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
IS12.01.2019
Former [2019/12]FI12.09.2018
HR12.09.2018
LT12.09.2018
LV12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
Former [2019/11]FI12.09.2018
HR12.09.2018
LT12.09.2018
BG12.12.2018
NO12.12.2018
GR13.12.2018
Former [2019/08]FI12.09.2018
LT12.09.2018
NO12.12.2018
Former [2019/07]LT12.09.2018
Documents cited:Search[X]DE1948293  (REXROTH GMBH G L) [X] 1-11 * the whole document *;
 [A]GB2055977  (FIAT ALLIS CONSTRUCT MACHINE) [A] 1* page 4; figures 2,3 *;
 [A]US6357549  (BRENNAN DONALD D [US], et al) [A] 1 * column 12, line 55 - column 16; figure 14 *;
 [A]WO2007019712  (BUCHER HYDRAULICS AG [CH], et al) [A] 1 * paragraphs [0038] - [0040]; figure 6 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.