blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2270919

EP2270919 - Broadband high-frequency slip ring system [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  14.06.2019
Database last updated on 15.11.2024
FormerThe patent has been granted
Status updated on  06.07.2018
FormerGrant of patent is intended
Status updated on  04.03.2018
FormerExamination is in progress
Status updated on  29.03.2017
Most recent event   Tooltip09.07.2021Lapse of the patent in a contracting state
New state(s): HU
published on 11.08.2021  [2021/32]
Applicant(s)For all designated states
Moog Inc.
Jamison Road and Seneca Street
East Aurora, NY 14052 / US
[2011/01]
Inventor(s)01 / Coleman, Donnie S.
6235 Highland Road
Dublin, VA240-5884 / US
 [2011/01]
Representative(s)Miller, James Lionel Woolverton, et al
Kilburn & Strode LLP
Lacon London
84 Theobalds Road
London WC1X 8NL / GB
[2018/32]
Former [2011/01]Miller, James Lionel Woolverton, et al
Kilburn & Strode LLP 20 Red Lion Street
London WC1R 4PJ / GB
Application number, filing date10011353.917.02.2004
[2011/01]
Priority number, dateUS20030448292P19.02.2003         Original published format: US 448292 P
US2004077850116.02.2004         Original published format: US 778501
[2011/01]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2270919
Date:05.01.2011
Language:EN
[2011/01]
Type: A3 Search report 
No.:EP2270919
Date:06.04.2011
[2011/14]
Type: B1 Patent specification 
No.:EP2270919
Date:08.08.2018
Language:EN
[2018/32]
Search report(s)(Supplementary) European search report - dispatched on:EP09.03.2011
ClassificationIPC:H01P1/00
[2011/01]
CPC:
H01P1/06 (EP,US); H01R39/24 (EP,US); H01R12/523 (EP,US);
H01R35/025 (EP,US); H01R39/08 (EP,US); H01R39/64 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   RO,   SE,   SI,   SK,   TR [2018/32]
Former [2011/01]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Breitband-Hochfrequenzgleitringsystem[2011/01]
English:Broadband high-frequency slip ring system[2011/01]
French:Système de bague glissante haute fréquence à large bande[2011/01]
Examination procedure06.10.2011Examination requested  [2011/46]
14.11.2011Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time
13.01.2012Amendment by applicant (claims and/or description)
16.10.2012Despatch of a communication from the examining division (Time limit: M04)
13.02.2013Reply to a communication from the examining division
20.03.2017Despatch of a communication from the examining division (Time limit: M01)
21.04.2017Reply to a communication from the examining division
05.03.2018Communication of intention to grant the patent
22.06.2018Fee for grant paid
22.06.2018Fee for publishing/printing paid
22.06.2018Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP04711897.1  / EP1597791
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20040711897) is  11.03.2008
Opposition(s)09.05.2019No opposition filed within time limit [2019/29]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
13.01.2012Request for further processing filed
13.01.2012Full payment received (date of receipt of payment)
Request granted
23.01.2012Decision despatched
Fees paidRenewal fee
18.01.2011Renewal fee patent year 03
18.01.2011Renewal fee patent year 04
18.01.2011Renewal fee patent year 05
18.01.2011Renewal fee patent year 06
18.01.2011Renewal fee patent year 07
23.02.2011Renewal fee patent year 08
24.02.2012Renewal fee patent year 09
27.02.2013Renewal fee patent year 10
27.02.2014Renewal fee patent year 11
26.02.2015Renewal fee patent year 12
26.02.2016Renewal fee patent year 13
27.02.2017Renewal fee patent year 14
27.02.2018Renewal fee patent year 15
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.02.2004
CY08.08.2018
CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
TR08.08.2018
BG08.11.2018
GR09.11.2018
PT08.12.2018
AT17.02.2019
GB17.02.2019
IE17.02.2019
IT17.02.2019
LU17.02.2019
ES18.02.2019
SE18.02.2019
BE28.02.2019
CH28.02.2019
DK28.02.2019
FR28.02.2019
LI28.02.2019
NL01.03.2019
[2021/32]
Former [2021/26]CY08.08.2018
CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
TR08.08.2018
BG08.11.2018
GR09.11.2018
PT08.12.2018
AT17.02.2019
GB17.02.2019
IE17.02.2019
IT17.02.2019
LU17.02.2019
ES18.02.2019
SE18.02.2019
BE28.02.2019
CH28.02.2019
DK28.02.2019
FR28.02.2019
LI28.02.2019
NL01.03.2019
Former [2020/29]CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
TR08.08.2018
BG08.11.2018
GR09.11.2018
PT08.12.2018
AT17.02.2019
GB17.02.2019
IE17.02.2019
IT17.02.2019
LU17.02.2019
ES18.02.2019
SE18.02.2019
BE28.02.2019
CH28.02.2019
DK28.02.2019
FR28.02.2019
LI28.02.2019
NL01.03.2019
Former [2020/23]CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
TR08.08.2018
BG08.11.2018
GR09.11.2018
AT17.02.2019
GB17.02.2019
IE17.02.2019
IT17.02.2019
LU17.02.2019
ES18.02.2019
SE18.02.2019
BE28.02.2019
CH28.02.2019
DK28.02.2019
FR28.02.2019
LI28.02.2019
NL01.03.2019
Former [2020/16]CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
TR08.08.2018
BG08.11.2018
GR09.11.2018
GB17.02.2019
IE17.02.2019
IT17.02.2019
LU17.02.2019
SE18.02.2019
BE28.02.2019
CH28.02.2019
DK28.02.2019
FR28.02.2019
LI28.02.2019
NL01.03.2019
Former [2020/12]CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
GR09.11.2018
GB17.02.2019
IE17.02.2019
IT17.02.2019
LU17.02.2019
SE18.02.2019
BE28.02.2019
CH28.02.2019
DK28.02.2019
FR28.02.2019
LI28.02.2019
NL01.03.2019
Former [2020/11]CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
GR09.11.2018
GB17.02.2019
IE17.02.2019
LU17.02.2019
SE18.02.2019
BE28.02.2019
CH28.02.2019
DK28.02.2019
FR28.02.2019
LI28.02.2019
NL01.03.2019
Former [2020/09]CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
GR09.11.2018
IE17.02.2019
LU17.02.2019
SE18.02.2019
CH28.02.2019
DK28.02.2019
LI28.02.2019
NL01.03.2019
Former [2020/07]CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
GR09.11.2018
LU17.02.2019
SE18.02.2019
CH28.02.2019
LI28.02.2019
NL01.03.2019
Former [2020/04]CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
GR09.11.2018
LU17.02.2019
SE18.02.2019
CH28.02.2019
LI28.02.2019
Former [2019/48]CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
GR09.11.2018
LU17.02.2019
SE18.02.2019
Former [2019/47]CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
GR09.11.2018
LU17.02.2019
Former [2019/45]CZ08.08.2018
EE08.08.2018
FI08.08.2018
MC08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
GR09.11.2018
Former [2019/37]CZ08.08.2018
EE08.08.2018
FI08.08.2018
RO08.08.2018
SI08.08.2018
SK08.08.2018
BG08.11.2018
GR09.11.2018
Former [2019/24]CZ08.08.2018
EE08.08.2018
FI08.08.2018
RO08.08.2018
SK08.08.2018
BG08.11.2018
GR09.11.2018
Former [2019/22]CZ08.08.2018
FI08.08.2018
RO08.08.2018
BG08.11.2018
GR09.11.2018
Former [2019/11]FI08.08.2018
BG08.11.2018
GR09.11.2018
Former [2019/08]FI08.08.2018
Documents cited:Search[A]US3042998  (CHARLES SWEETT HENRY, et al) [A] 6,7* column 1, line 55 - column 2, line 43; figures 1,2 *;
 [A]US3785049  (TATSUMI H, et al) [A] 6,7 * column 2, line 55 - column 3, line 27; figures 1,2 *;
 [A]US5668514  (HOSHINO MASARU [JP], et al) [A] 6,7 * column 11, line 25 - line 54; figures 17-20 *;
 [Y]US5805115  (PELLERIN ANDREW [US], et al) [Y] 1,2 * column 5, line 54 - column 6, line 29; figures 3,4 * * column 7, line 15 - column 8, line 40; figures 5-7 *;
 [Y]JPH10335910  (KYOCERA CORP) [Y] 1,2 * abstract *;
 [A]EP0967696  (JASUN ENGINEERING LIMITED [GB]) [A] 1-7 * paragraph [0009] - paragraph [0018]; figures 1-4 *;
 [A]US6437656  (GUYNN PRESTON L [US], et al) [A] 1-5 * column 3, line 16 - line 65; figures 2A-2D * * column 4, line 24 - column 5, line 39; figures 3A,4A-4B *;
 [A]FR2828592  (SCHLEIFRING UND APPBAU GMBH [DE]) [A] 1-5 * page 6, line 17 - page 7, line 10; figures 1-4 *
ExaminationGB2217114
by applicantUS20030448292
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.