blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2224559

EP2224559 - Nitride semiconductor laser device [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.02.2020
Database last updated on 18.10.2024
FormerThe patent has been granted
Status updated on  22.03.2019
FormerGrant of patent is intended
Status updated on  18.11.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Nichia Corporation
491-100, Oka
Kaminaka-cho
Anan-shi Tokushima 774-8601 / JP
[2019/17]
Former [2010/35]For all designated states
Nichia Corporation
491-100, Oka, Kaminaka-cho
Anan-shi, Tokushima 774-8601 / JP
Inventor(s)01 / Miyoshi, Takashi
c/o NICHIA CORPORATION
491-100, Oka, Kaminaka-cho
Anan-shi, Tokushima 774-8601 / JP
02 / Okada, Takeshi
c/o NICHIA CORPORATION
491-100, Oka, Kaminaka-cho
Anan-shi, Tokushima 774-8601 / JP
 [2019/17]
Former [2010/35]01 / Miyoshi, Takashi
c/o NICHIA CORPORATION 491-100, Oka, Kaminaka-cho
Anan-shi, Tokushima 774-8601 / JP
02 / Okada, Takeshi
c/o NICHIA CORPORATION 491-100, Oka, Kaminaka-cho
Anan-shi, Tokushima 774-8601 / JP
Representative(s)Haseltine Lake Kempner LLP
Cheapside House
138 Cheapside
London EC2V 6BJ / GB
[N/P]
Former [2019/17]Haseltine Lake LLP
Lincoln House, 5th Floor
300 High Holborn
London WC1V 7JH / GB
Former [2010/35]Fenlon, Christine Lesley
Haseltine Lake LLP Lincoln House, 5th Floor 300 High Holborn
London WC1V 7JH / GB
Application number, filing date10155067.101.03.2010
[2010/35]
Priority number, dateJP2009004539827.02.2009         Original published format: JP 2009045398
JP2010002300304.02.2010         Original published format: JP 2010023003
[2010/35]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2224559
Date:01.09.2010
Language:EN
[2010/35]
Type: A3 Search report 
No.:EP2224559
Date:19.12.2012
Language:EN
[2012/51]
Type: B1 Patent specification 
No.:EP2224559
Date:24.04.2019
Language:EN
[2019/17]
Search report(s)(Supplementary) European search report - dispatched on:EP15.11.2012
ClassificationIPC:H01S5/22, // H01S5/065, H01S5/343
[2018/49]
CPC:
H01S5/22 (EP,US); B82Y20/00 (EP,US); H01S5/34333 (EP,US);
H01S2301/176 (EP,US); H01S5/0655 (EP,US); H01S5/222 (EP,US)
Former IPC [2010/35]H01S5/22, // H01S5/34, H01S5/323
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2019/17]
Former [2010/35]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Nitrid-Halbleiterlaserbauelement[2010/35]
English:Nitride semiconductor laser device[2010/35]
French:Dispositif laser à semi-conducteur de nitrure[2010/35]
Examination procedure31.05.2013Examination requested  [2013/28]
10.06.2013Amendment by applicant (claims and/or description)
09.11.2015Despatch of a communication from the examining division (Time limit: M04)
17.03.2016Reply to a communication from the examining division
19.11.2018Communication of intention to grant the patent
12.03.2019Fee for grant paid
12.03.2019Fee for publishing/printing paid
12.03.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  09.11.2015
Opposition(s)27.01.2020No opposition filed within time limit [2020/14]
Fees paidRenewal fee
30.03.2012Renewal fee patent year 03
27.03.2013Renewal fee patent year 04
31.03.2014Renewal fee patent year 05
10.03.2015Renewal fee patent year 06
10.03.2016Renewal fee patent year 07
10.03.2017Renewal fee patent year 08
13.03.2018Renewal fee patent year 09
13.03.2019Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.03.2010
AT24.04.2019
CY24.04.2019
CZ24.04.2019
DK24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
IT24.04.2019
LT24.04.2019
LV24.04.2019
MC24.04.2019
MK24.04.2019
MT24.04.2019
NL24.04.2019
PL24.04.2019
RO24.04.2019
SE24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
[2022/32]
Former [2022/27]HU01.03.2010
AT24.04.2019
CY24.04.2019
CZ24.04.2019
DK24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
IT24.04.2019
LT24.04.2019
LV24.04.2019
MC24.04.2019
MT24.04.2019
NL24.04.2019
PL24.04.2019
RO24.04.2019
SE24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/49]AT24.04.2019
CZ24.04.2019
DK24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
IT24.04.2019
LT24.04.2019
LV24.04.2019
MC24.04.2019
NL24.04.2019
PL24.04.2019
RO24.04.2019
SE24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/26]AT24.04.2019
CZ24.04.2019
DK24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
IT24.04.2019
LT24.04.2019
LV24.04.2019
NL24.04.2019
PL24.04.2019
RO24.04.2019
SE24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/17]AT24.04.2019
CZ24.04.2019
DK24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
IT24.04.2019
LT24.04.2019
LV24.04.2019
NL24.04.2019
PL24.04.2019
RO24.04.2019
SE24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/14]AT24.04.2019
CZ24.04.2019
DK24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
IT24.04.2019
LT24.04.2019
LV24.04.2019
NL24.04.2019
PL24.04.2019
RO24.04.2019
SE24.04.2019
SK24.04.2019
SM24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/12]AT24.04.2019
CZ24.04.2019
DK24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
IT24.04.2019
LT24.04.2019
LV24.04.2019
NL24.04.2019
PL24.04.2019
RO24.04.2019
SE24.04.2019
SK24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/11]AT24.04.2019
CZ24.04.2019
DK24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
NL24.04.2019
PL24.04.2019
RO24.04.2019
SE24.04.2019
SK24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/10]AT24.04.2019
CZ24.04.2019
DK24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
NL24.04.2019
PL24.04.2019
RO24.04.2019
SE24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/09]CZ24.04.2019
DK24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
NL24.04.2019
PL24.04.2019
SE24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/04]ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
NL24.04.2019
PL24.04.2019
SE24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2019/52]ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
NL24.04.2019
PL24.04.2019
SE24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
PT24.08.2019
Former [2019/51]ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
NL24.04.2019
SE24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
PT24.08.2019
Former [2019/50]ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
NL24.04.2019
SE24.04.2019
NO24.07.2019
GR25.07.2019
PT24.08.2019
Former [2019/49]ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
NL24.04.2019
SE24.04.2019
NO24.07.2019
PT24.08.2019
Former [2019/48]ES24.04.2019
FI24.04.2019
LT24.04.2019
NL24.04.2019
SE24.04.2019
NO24.07.2019
PT24.08.2019
Former [2019/47]ES24.04.2019
FI24.04.2019
LT24.04.2019
NL24.04.2019
NO24.07.2019
Former [2019/44]NL24.04.2019
Documents cited:Search[A]US3457633  (MARINACE JOHN C, et al) [A] 1,2 * abstract *;
 [A]US3518574  (RUTZ RICHARD F) [A] 1,2 * column 4; figure 4 *;
 [A]US5316967  (KANENO NOBUAKI [JP], et al) [A] 1* abstract *;
 [I]US5966397  (HIRATA SHOJI [JP]) [I] 1,2,4 * figures 2A, 4A * * column 3, line 55 - column 4, line 33 * * column 7, line 53 - column 8, line 38 * * column 9, lines 47-50 *;
 [X]EP1094529  (SANYO ELECTRIC CO [JP]) [X] 1-4 * paragraphs [0042] - [0055]; figures 4-7 *;
 [I]US2005116243  (MOCHIDA ATSUNORI [JP]) [I] 1,2 * paragraphs [0062] - [0069]; figure 4 *;
 [X]US2006043409  (OHMI SUSUMU [JP]) [X] 1,2 * paragraphs [0030] - [0045]; figure 1 *;
 [X]US2006109881  (KWAK JOON-SEOP [KR], et al) [X] 1,2,6,7 * paragraphs [0028] - [0035]; figure 2 *
by applicantJPH09283845
 JPH10270792
 JP2000012970
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.