| EP2242189 - Apparatus and method for controlling power in distributed multiple input multiple output wireless communication system [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.07.2016 Database last updated on 14.03.2026 | Most recent event Tooltip | 17.08.2018 | Lapse of the patent in a contracting state New state(s): BG | published on 19.09.2018 [2018/38] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do, 443-742 / KR | For all designated states Industry-University Cooperation Foundation Sogang University Sogang University, 1-1 Sinsu-dong Mapo-gu, Seoul / KR | [2012/39] |
| Former [2010/42] | For all designated states Samsung Electronics Co., Ltd. 416 Maetan-dong, Yeongtong-gu Suwon-si, Gyeonggi-do / KR | ||
| For all designated states Industry-University Cooperation Foundation Sogang University Sogang University, 1-1 Sinsu-dong Mapo-gu, Seoul / KR | Inventor(s) | 01 /
Ko, Jae-Yun No 301-1106, Mokryun APT Hogye-dong 1052-3 Dongan-gu Anyang-si Gyeonggi-do / KR | 02 /
Hwang, Keun-Chul No 521-902 Ggotme Maeul Hyundaehometown APT Jukjeon-dong Suji-gu Yongin-si Gyeonggi-do / KR | 03 /
Kang, Seung-Won No 301 Maetan-dong 414-15 Yeongtong-gu Suwon-si Gyeonggi-do / KR | 04 /
Yoon, Soon-Young No 9-106 Asia Seonsuchon APT Jamsil 7-dong Songpa-gu Seoul / KR | 05 /
Sung, Won-Jin No 101-505 Nokwon Hanshin APT Jamwon-dong 60-7 Seocho-gu Seoul / KR | 06 /
Lee, Byung-Seok 390-27 Yeonnam-dong Mapo-gu Seoul / KR | 07 /
Lee, Ji-Won 81-136 Sinsu-dong Mapo-gu Seoul / KR | [2015/38] |
| Former [2010/42] | 01 /
Ko, Jae-Yun No 301-1106, Mokryun APT Hogye-dong 1052-3 Dongan-gu, Anyang-si Gyeonggi-do / KR | ||
| 02 /
Hwang, Keun-Chul No 521-902 Ggotme Maeul Hyundaehometown APT Jukjeon-dong, Suji-gu, Yongin-si Gyeonggi-do / KR | |||
| 03 /
Kang, Seung-Won No 301 Maetan-dong 414-15 Yeongtong-gu Suwon-si Gyeonggi-do / KR | |||
| 04 /
Yoon, Soon-Young No 9-106 Asia Seonsuchon APT Jamsil 7-dong Songpa-gu Seoul / KR | |||
| 05 /
Sung, Won-Jin No 101-505 Nokwon Hanshin APT Jamwon-dong 60-7 Seocho-gu Seoul / KR | |||
| 06 /
Lee, Byung-Seok 390-27 Yeonnam-dong Mapo-gu Seoul / KR | |||
| 07 /
Lee, Ji-Won 81-136 Sinsu-dong Mapo-gu Seoul / KR | Representative(s) | Birchenough, Lewis, et al HGF Limited Saviour House 9 St Saviourgate York YO1 8NQ / GB | [2015/38] |
| Former [2013/32] | Birchenough, Lewis, et al Harrison Goddard Foote LLP Saviour House 9 St Saviourgate York YO1 8NQ / GB | ||
| Former [2010/42] | Jenkins, Richard Gavin Harrison Goddard Foote 106 Micklegate York YO1 6JX / GB | Application number, filing date | 10156960.6 | 18.03.2010 | [2010/42] | Priority number, date | KR20090031743 | 13.04.2009 Original published format: KR 20090031743 | [2010/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2242189 | Date: | 20.10.2010 | Language: | EN | [2010/42] | Type: | B1 Patent specification | No.: | EP2242189 | Date: | 16.09.2015 | Language: | EN | [2015/38] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.08.2010 | Classification | IPC: | H04B7/06, // H04B7/04, H04W52/40 | [2015/22] | CPC: |
H04B7/0617 (EP,KR,US);
H04B7/0417 (EP,KR,US);
H04B7/043 (KR);
H04W52/40 (EP,KR,US)
|
| Former IPC [2010/42] | H04B7/06 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2015/38] |
| Former [2010/42] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | Vorrichtung und Verfahren zur Steuerung der Leistung in verteilten drahtlosen Mehrfacheingabe-Mehrfachausgabe-Kommunikationssystem | [2010/42] | English: | Apparatus and method for controlling power in distributed multiple input multiple output wireless communication system | [2010/42] | French: | Appareil et procédé de contrôle de l'alimentation dans un système de communication sans fil à entrées/sorties multiple distribuées | [2010/42] | Examination procedure | 15.04.2011 | Amendment by applicant (claims and/or description) | 15.04.2011 | Examination requested [2011/21] | 13.05.2015 | Communication of intention to grant the patent | 23.07.2015 | Fee for grant paid | 23.07.2015 | Fee for publishing/printing paid | 23.07.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.05.2015 | Opposition(s) | 17.06.2016 | No opposition filed within time limit [2016/34] | Fees paid | Renewal fee | 03.01.2012 | Renewal fee patent year 03 | 23.01.2013 | Renewal fee patent year 04 | 05.02.2014 | Renewal fee patent year 05 | 06.02.2015 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.03.2010 | AT | 16.09.2015 | BE | 16.09.2015 | BG | 16.09.2015 | CY | 16.09.2015 | CZ | 16.09.2015 | DK | 16.09.2015 | EE | 16.09.2015 | ES | 16.09.2015 | FI | 16.09.2015 | HR | 16.09.2015 | IT | 16.09.2015 | LT | 16.09.2015 | LV | 16.09.2015 | MC | 16.09.2015 | MK | 16.09.2015 | NL | 16.09.2015 | PL | 16.09.2015 | RO | 16.09.2015 | SE | 16.09.2015 | SI | 16.09.2015 | SK | 16.09.2015 | SM | 16.09.2015 | TR | 16.09.2015 | NO | 16.12.2015 | GR | 17.12.2015 | IS | 16.01.2016 | PT | 18.01.2016 | GB | 18.03.2016 | IE | 18.03.2016 | LU | 18.03.2016 | CH | 31.03.2016 | FR | 31.03.2016 | LI | 31.03.2016 | MT | 31.03.2016 | [2018/38] |
| Former [2018/31] | HU | 18.03.2010 | |
| AT | 16.09.2015 | ||
| BE | 16.09.2015 | ||
| CY | 16.09.2015 | ||
| CZ | 16.09.2015 | ||
| DK | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| MC | 16.09.2015 | ||
| MK | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SI | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| SM | 16.09.2015 | ||
| TR | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| GB | 18.03.2016 | ||
| IE | 18.03.2016 | ||
| LU | 18.03.2016 | ||
| CH | 31.03.2016 | ||
| FR | 31.03.2016 | ||
| LI | 31.03.2016 | ||
| MT | 31.03.2016 | ||
| Former [2018/29] | HU | 18.03.2010 | |
| AT | 16.09.2015 | ||
| BE | 16.09.2015 | ||
| CY | 16.09.2015 | ||
| CZ | 16.09.2015 | ||
| DK | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| MC | 16.09.2015 | ||
| MK | 16.09.2015 | ||
| MT | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SI | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| SM | 16.09.2015 | ||
| TR | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| GB | 18.03.2016 | ||
| IE | 18.03.2016 | ||
| LU | 18.03.2016 | ||
| CH | 31.03.2016 | ||
| FR | 31.03.2016 | ||
| LI | 31.03.2016 | ||
| Former [2018/28] | HU | 18.03.2010 | |
| AT | 16.09.2015 | ||
| BE | 16.09.2015 | ||
| CY | 16.09.2015 | ||
| CZ | 16.09.2015 | ||
| DK | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| MC | 16.09.2015 | ||
| MK | 16.09.2015 | ||
| MT | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SI | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| SM | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| GB | 18.03.2016 | ||
| IE | 18.03.2016 | ||
| LU | 18.03.2016 | ||
| CH | 31.03.2016 | ||
| FR | 31.03.2016 | ||
| LI | 31.03.2016 | ||
| Former [2017/47] | AT | 16.09.2015 | |
| BE | 16.09.2015 | ||
| CZ | 16.09.2015 | ||
| DK | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| MC | 16.09.2015 | ||
| MT | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SI | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| GB | 18.03.2016 | ||
| IE | 18.03.2016 | ||
| LU | 18.03.2016 | ||
| CH | 31.03.2016 | ||
| FR | 31.03.2016 | ||
| LI | 31.03.2016 | ||
| Former [2017/10] | AT | 16.09.2015 | |
| BE | 16.09.2015 | ||
| CZ | 16.09.2015 | ||
| DK | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| MC | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SI | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| GB | 18.03.2016 | ||
| IE | 18.03.2016 | ||
| LU | 18.03.2016 | ||
| CH | 31.03.2016 | ||
| FR | 31.03.2016 | ||
| LI | 31.03.2016 | ||
| Former [2017/08] | AT | 16.09.2015 | |
| BE | 16.09.2015 | ||
| CZ | 16.09.2015 | ||
| DK | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| MC | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SI | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| GB | 18.03.2016 | ||
| IE | 18.03.2016 | ||
| LU | 18.03.2016 | ||
| CH | 31.03.2016 | ||
| LI | 31.03.2016 | ||
| Former [2017/07] | AT | 16.09.2015 | |
| BE | 16.09.2015 | ||
| CZ | 16.09.2015 | ||
| DK | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| MC | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SI | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| IE | 18.03.2016 | ||
| LU | 18.03.2016 | ||
| CH | 31.03.2016 | ||
| LI | 31.03.2016 | ||
| Former [2017/03] | AT | 16.09.2015 | |
| BE | 16.09.2015 | ||
| CZ | 16.09.2015 | ||
| DK | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| MC | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SI | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| LU | 18.03.2016 | ||
| Former [2016/49] | AT | 16.09.2015 | |
| CZ | 16.09.2015 | ||
| DK | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| MC | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SI | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| LU | 18.03.2016 | ||
| BE | 31.03.2016 | ||
| Former [2016/47] | AT | 16.09.2015 | |
| CZ | 16.09.2015 | ||
| DK | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| LU | 18.03.2016 | ||
| BE | 31.03.2016 | ||
| Former [2016/39] | AT | 16.09.2015 | |
| CZ | 16.09.2015 | ||
| DK | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| BE | 31.03.2016 | ||
| Former [2016/37] | AT | 16.09.2015 | |
| CZ | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| BE | 31.03.2016 | ||
| Former [2016/24] | AT | 16.09.2015 | |
| CZ | 16.09.2015 | ||
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| PL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| PT | 18.01.2016 | ||
| Former [2016/23] | CZ | 16.09.2015 | |
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| RO | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| SK | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| Former [2016/22] | CZ | 16.09.2015 | |
| EE | 16.09.2015 | ||
| ES | 16.09.2015 | ||
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| IS | 16.01.2016 | ||
| Former [2016/21] | ES | 16.09.2015 | |
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| IT | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| Former [2016/20] | ES | 16.09.2015 | |
| FI | 16.09.2015 | ||
| HR | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| Former [2016/14] | FI | 16.09.2015 | |
| HR | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| NL | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| Former [2016/11] | FI | 16.09.2015 | |
| HR | 16.09.2015 | ||
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| SE | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| Former [2016/09] | FI | 16.09.2015 | |
| LT | 16.09.2015 | ||
| LV | 16.09.2015 | ||
| NO | 16.12.2015 | ||
| GR | 17.12.2015 | ||
| Former [2016/08] | LT | 16.09.2015 | |
| NO | 16.12.2015 | ||
| Former [2016/07] | LT | 16.09.2015 | Documents cited: | Search | [A] PINERO G ET AL: "An efficient algorithm for downlink cooperative transmission using joint power control and beamforming", SENSOR ARRAY AND MULTICHANNEL SIGNAL PROCESSING WORKSHOP PROCEEDINGS, 2004 BARCELONA, SPAIN 18-21 JULY 2004, PISCATAWAY, NJ, USA,IEEE LNKD- DOI:10.1109/SAM.2004.1503001, 18 July 2004 (2004-07-18), pages 513 - 517, XP010832545, ISBN: 978-0-7803-8545-0 [A] 1-14 * page 513, column l, line 13 - column r, line 6 * * page 514, column l, line 15 - line 25 * * page 515 - column r, paragraph last * * page 516, column l, paragraph 2.2 * * figure 1 * DOI: http://dx.doi.org/10.1109/SAM.2004.1503001 | [A] CHAN P W C ET AL: "Reduced-complexity power allocation in zeroforcing MIMO-OFDM downlink system with multiuser diversity", INFORMATION THEORY, 2005. ISIT 2005. PROCEEDINGS. INTERNATIONAL SYMPOS IUM ON ADELAIDE, AUSTRALIA 4-9 SEPT. 2005, PISCATAWAY, NJ, USA,IEEE, 4 September 2005 (2005-09-04), pages 2320 - 2324, XP010845968, ISBN: 978-0-7803-9151-2 [A] 1-14 * the whole document * |