EP2385637 - Methods and devices for modulating a signal [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.10.2014 Database last updated on 19.10.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [N/P] |
Former [2013/45] | For all designated states Telefonaktiebolaget LM Ericsson (Publ) 164 83 Stockholm / SE | ||
Former [2011/45] | For all designated states Telefonaktiebolaget L M Ericsson AB (Publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
Djupsjöbacka, Anders Virebergsvägen 20 169 30, Solna / SE | [2011/45] | Representative(s) | Kühn, Friedrich Heinrich Ericsson AB Patent Unit Kista RAN 1 164 80 Stockholm / SE | [2013/45] |
Former [2011/45] | VALEA AB Box 7086 103 87 Stockholm / SE | Application number, filing date | 10162304.9 | 07.05.2010 | [2011/45] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2385637 | Date: | 09.11.2011 | Language: | EN | [2011/45] | Type: | B1 Patent specification | No.: | EP2385637 | Date: | 25.12.2013 | Language: | EN | [2013/52] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.11.2010 | Classification | IPC: | H04B10/532, H04B10/54, H04B10/556, H04B10/67, H04J14/06 | [2013/31] | CPC: |
H04B10/541 (EP,US);
H04B10/5051 (EP,US);
H04B10/5053 (EP,US);
H04B10/532 (EP,US);
H04B10/5561 (EP,US);
H04B10/67 (EP,US);
H04J14/06 (EP,US)
(-)
|
Former IPC [2011/45] | H04B10/155, H04B10/158 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2011/45] | Title | German: | Verfahren und Vorrichtungen zur Modulierung eines Signals | [2011/45] | English: | Methods and devices for modulating a signal | [2011/45] | French: | Procédés et dispositifs pour moduler un signal | [2011/45] | Examination procedure | 08.05.2012 | Amendment by applicant (claims and/or description) | 08.05.2012 | Examination requested [2012/24] | 09.08.2012 | Despatch of a communication from the examining division (Time limit: M04) | 31.10.2012 | Reply to a communication from the examining division | 31.07.2013 | Communication of intention to grant the patent | 12.11.2013 | Fee for grant paid | 12.11.2013 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.08.2012 | Opposition(s) | 26.09.2014 | No opposition filed within time limit [2014/49] | Fees paid | Renewal fee | 28.03.2012 | Renewal fee patent year 03 | 28.05.2013 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.05.2010 | AL | 25.12.2013 | AT | 25.12.2013 | BE | 25.12.2013 | BG | 25.12.2013 | CY | 25.12.2013 | CZ | 25.12.2013 | DK | 25.12.2013 | EE | 25.12.2013 | ES | 25.12.2013 | FI | 25.12.2013 | HR | 25.12.2013 | IT | 25.12.2013 | LT | 25.12.2013 | LV | 25.12.2013 | MC | 25.12.2013 | MK | 25.12.2013 | MT | 25.12.2013 | NL | 25.12.2013 | PL | 25.12.2013 | RO | 25.12.2013 | SE | 25.12.2013 | SI | 25.12.2013 | SK | 25.12.2013 | SM | 25.12.2013 | TR | 25.12.2013 | NO | 25.03.2014 | GR | 26.03.2014 | IS | 25.04.2014 | PT | 28.04.2014 | IE | 07.05.2014 | LU | 07.05.2014 | CH | 31.05.2014 | LI | 31.05.2014 | FR | 02.06.2014 | [2018/46] |
Former [2018/30] | HU | 07.05.2010 | |
AT | 25.12.2013 | ||
BE | 25.12.2013 | ||
BG | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
IT | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
MK | 25.12.2013 | ||
MT | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
SM | 25.12.2013 | ||
TR | 25.12.2013 | ||
NO | 25.03.2014 | ||
GR | 26.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
IE | 07.05.2014 | ||
LU | 07.05.2014 | ||
CH | 31.05.2014 | ||
LI | 31.05.2014 | ||
FR | 02.06.2014 | ||
Former [2016/33] | HU | 07.05.2010 | |
AT | 25.12.2013 | ||
BE | 25.12.2013 | ||
BG | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
IT | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
MT | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
SM | 25.12.2013 | ||
TR | 25.12.2013 | ||
NO | 25.03.2014 | ||
GR | 26.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
IE | 07.05.2014 | ||
LU | 07.05.2014 | ||
CH | 31.05.2014 | ||
LI | 31.05.2014 | ||
FR | 02.06.2014 | ||
Former [2016/32] | HU | 07.05.2010 | |
AT | 25.12.2013 | ||
BE | 25.12.2013 | ||
BG | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
IT | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
MT | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
SM | 25.12.2013 | ||
NO | 25.03.2014 | ||
GR | 26.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
IE | 07.05.2014 | ||
LU | 07.05.2014 | ||
CH | 31.05.2014 | ||
LI | 31.05.2014 | ||
FR | 02.06.2014 | ||
Former [2016/29] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
BG | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
IT | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
MT | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
SM | 25.12.2013 | ||
NO | 25.03.2014 | ||
GR | 26.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
IE | 07.05.2014 | ||
LU | 07.05.2014 | ||
CH | 31.05.2014 | ||
LI | 31.05.2014 | ||
FR | 02.06.2014 | ||
Former [2016/28] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
BG | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
MT | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
SM | 25.12.2013 | ||
NO | 25.03.2014 | ||
GR | 26.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
IE | 07.05.2014 | ||
LU | 07.05.2014 | ||
CH | 31.05.2014 | ||
LI | 31.05.2014 | ||
FR | 02.06.2014 | ||
Former [2016/22] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
MT | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
SM | 25.12.2013 | ||
NO | 25.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
IE | 07.05.2014 | ||
LU | 07.05.2014 | ||
CH | 31.05.2014 | ||
LI | 31.05.2014 | ||
FR | 02.06.2014 | ||
Former [2016/16] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
MT | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
NO | 25.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
IE | 07.05.2014 | ||
LU | 07.05.2014 | ||
CH | 31.05.2014 | ||
LI | 31.05.2014 | ||
FR | 02.06.2014 | ||
Former [2015/24] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SI | 25.12.2013 | ||
SK | 25.12.2013 | ||
NO | 25.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
IE | 07.05.2014 | ||
LU | 07.05.2014 | ||
CH | 31.05.2014 | ||
LI | 31.05.2014 | ||
FR | 02.06.2014 | ||
Former [2015/21] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SK | 25.12.2013 | ||
NO | 25.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
IE | 07.05.2014 | ||
LU | 07.05.2014 | ||
CH | 31.05.2014 | ||
LI | 31.05.2014 | ||
Former [2015/09] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
MC | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SK | 25.12.2013 | ||
NO | 25.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
LU | 07.05.2014 | ||
CH | 31.05.2014 | ||
LI | 31.05.2014 | ||
Former [2015/08] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SK | 25.12.2013 | ||
NO | 25.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
LU | 07.05.2014 | ||
CH | 31.05.2014 | ||
LI | 31.05.2014 | ||
Former [2015/04] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SK | 25.12.2013 | ||
NO | 25.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
LU | 07.05.2014 | ||
Former [2014/50] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
NL | 25.12.2013 | ||
PL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SK | 25.12.2013 | ||
NO | 25.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2014/48] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
DK | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
NL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SK | 25.12.2013 | ||
NO | 25.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2014/39] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
NL | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SK | 25.12.2013 | ||
NO | 25.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2014/37] | AT | 25.12.2013 | |
BE | 25.12.2013 | ||
CY | 25.12.2013 | ||
CZ | 25.12.2013 | ||
EE | 25.12.2013 | ||
ES | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
RO | 25.12.2013 | ||
SE | 25.12.2013 | ||
SK | 25.12.2013 | ||
NO | 25.03.2014 | ||
IS | 25.04.2014 | ||
PT | 28.04.2014 | ||
Former [2014/36] | BE | 25.12.2013 | |
EE | 25.12.2013 | ||
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
SE | 25.12.2013 | ||
NO | 25.03.2014 | ||
IS | 25.04.2014 | ||
Former [2014/34] | BE | 25.12.2013 | |
FI | 25.12.2013 | ||
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
SE | 25.12.2013 | ||
NO | 25.03.2014 | ||
Former [2014/25] | FI | 25.12.2013 | |
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
LV | 25.12.2013 | ||
SE | 25.12.2013 | ||
NO | 25.03.2014 | ||
Former [2014/23] | FI | 25.12.2013 | |
HR | 25.12.2013 | ||
LT | 25.12.2013 | ||
SE | 25.12.2013 | ||
NO | 25.03.2014 | ||
Former [2014/22] | FI | 25.12.2013 | |
LT | 25.12.2013 | ||
SE | 25.12.2013 | ||
NO | 25.03.2014 | ||
Former [2014/20] | LT | 25.12.2013 | |
NO | 25.03.2014 | Documents cited: | Search | [XA]WO2009035513 (LUCENT TECHNOLOGIES INC [US], et al) [X] 8,9,12 * page 3, lines 20-25 * * page 4, lines 19-23 * * figure 2 *[A] 1-7,10,11; | [A]US2009324253 (WINZER PETER J [US]) [A] 1-12 * figures 1,2,6,7,8 * * paragraphs [0021] - [0022] * * paragraphs [0028] , [0029] * * paragraphs [0047] , [0048] , [0052] * * paragraph [0054] *; | [A]EP2164199 (FUJITSU LTD [JP]) [A] 1-12 * paragraphs [0056] - [0062] * * figures 14, 15, 16, 17, 19A, 22 * | by applicant | WO2009124861 |