| EP2284751 - METHOD FOR TRACEABILITY AND ACCOUNTABILITY OF DYNAMIC EXCHANGE IN AN INTERNET ENVIRONMENT [Right-click to bookmark this link] | |||
| Former [2011/07] | Method for traceability and accountability of dynamic exchange in an internet environment | ||
| [2021/01] | Status | No opposition filed within time limit Status updated on 22.04.2022 Database last updated on 18.03.2026 | |
| Former | The patent has been granted Status updated on 14.05.2021 | ||
| Former | Grant of patent is intended Status updated on 14.01.2021 | ||
| Former | Examination is in progress Status updated on 25.11.2016 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states SOCIETE FRANCAISE DU RADIOTELEPHONE-SFR 1 Square Bela Bartok 75015 Paris / FR | [2021/04] |
| Former [2016/50] | For all designated states SOCIETE FRANCAISE DU RADIO TELEPHONE (SFR) 1 Square Bela Bartok 75015 Paris / FR | ||
| Former [2011/07] | For all designated states Societé Française du Radiotéléphone 42, Avenue de Friedland 75008 Paris / FR | Inventor(s) | 01 /
BOUVIER, Christian 2 Allée de Clairbois 78120 Rambouillet / FR | 02 /
MANENTE, Cyrille 8 rue des Hirondelles 91420 Morangis / FR | 03 /
PETIT, Ludovic 8 Allée des Lilas 95610 Eragny sur Oise / FR | 04 /
TEIMOORZADEH, Kourosh 59 Domaine du Grand Gland 28130 Bouglainval / FR | [2021/24] |
| Former [2011/07] | 01 /
Bouvier, Christian 2 Allée de Clairbois 78120 RAMBOUILLET / FR | ||
| 02 /
Manente, Cyrille 8 rue des Hirondelles 91420 MORANGIS / FR | |||
| 03 /
Petit, Ludovic 8 Allée des Lilas 95610 ERAGNY SUR OISE / FR | |||
| 04 /
Teimoorzadeh, Kourosh 59 Domaine du Grand Gland 28130 BOUGLAINVAL / FR | Representative(s) | Debay, Damien, et al Debay IP 126 Résidence Elysée 2 18, avenue de la Jonchère 78170 La Celle-Saint-Cloud / FR | [2021/24] |
| Former [2011/07] | Debay, Yves Cabinet Debay 126 Elysée 2 78170 La Celle Saint Cloud / FR | Application number, filing date | 10168563.4 | 06.07.2010 | [2011/07] | Priority number, date | FR20090003371 | 08.07.2009 Original published format: FR 0903371 | [2011/07] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP2284751 | Date: | 16.02.2011 | Language: | FR | [2011/07] | Type: | B1 Patent specification | No.: | EP2284751 | Date: | 16.06.2021 | Language: | FR | [2021/24] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.01.2011 | Classification | IPC: | G06F21/16, G06F21/31, H04L29/06 | [2021/01] | CPC: |
H04L63/12 (EP);
G06F21/16 (EP);
G06F21/31 (EP);
H04L63/0876 (EP);
G06F2221/2101 (EP);
G06F2221/2129 (EP)
|
| Former IPC [2011/07] | G06F21/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2021/24] |
| Former [2011/07] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR RÜCKVERFOLGBARKEIT UND RECHENSCHAFT VON DYNAMISCHEM AUSTAUSCH IN EINER INTERNET UMGEBUNG | [2021/04] | English: | METHOD FOR TRACEABILITY AND ACCOUNTABILITY OF DYNAMIC EXCHANGE IN AN INTERNET ENVIRONMENT | [2021/01] | French: | PROCÉDÉ DE TRAÇABILITÉ ET D'IMPUTABILITÉ DYNAMIQUES DES ÉCHANGES DANS UN ENVIRONNEMENT OUVERT DE TYPE INTERNET | [2021/04] |
| Former [2011/07] | Verfahren zur Rückverfolgbarkeit und Rechenschaft von dynamischem Austausch in einer Internet Umgebung | ||
| Former [2011/07] | Method for traceability and accountability of dynamic exchange in an internet environment | ||
| Former [2011/07] | Procédé de traçabilité et d'imputabilité dynamiques des échanges dans un environnement ouvert de type Internet | Examination procedure | 12.05.2011 | Amendment by applicant (claims and/or description) | 13.07.2011 | Examination requested [2011/34] | 23.11.2016 | Despatch of a communication from the examining division (Time limit: M06) | 05.04.2017 | Reply to a communication from the examining division | 27.05.2019 | Despatch of a communication from the examining division (Time limit: M06) | 26.11.2019 | Reply to a communication from the examining division | 12.12.2019 | Despatch of a communication from the examining division (Time limit: M06) | 29.04.2020 | Reply to a communication from the examining division | 16.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 12.10.2020 | Reply to a communication from the examining division | 15.01.2021 | Communication of intention to grant the patent | 27.04.2021 | Receipt of the translation of the claim(s) | 10.05.2021 | Fee for grant paid | 10.05.2021 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.11.2016 | Opposition(s) | 17.03.2022 | No opposition filed within time limit [2022/21] | Fees paid | Renewal fee | 24.07.2012 | Renewal fee patent year 03 | 24.07.2013 | Renewal fee patent year 04 | 23.07.2014 | Renewal fee patent year 05 | 24.07.2015 | Renewal fee patent year 06 | 22.07.2016 | Renewal fee patent year 07 | 21.07.2017 | Renewal fee patent year 08 | 24.07.2018 | Renewal fee patent year 09 | 22.07.2019 | Renewal fee patent year 10 | 22.07.2020 | Renewal fee patent year 11 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Rights in Rem or Legal Means of Execution | ID: | 01 | For: | AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR | Date: | 27.08.2015 | ID: | 02 | For: | AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR | Date: | 23.09.2016 | [2016/47] |
| Former [2015/45] | ID: | 01 | |
| For: | AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR | ||
| Date: | 27.08.2015 | ||
| [2016/47] | Lapses during opposition Tooltip | HU | 06.07.2010 | AL | 16.06.2021 | AT | 16.06.2021 | CY | 16.06.2021 | CZ | 16.06.2021 | DK | 16.06.2021 | EE | 16.06.2021 | ES | 16.06.2021 | FI | 16.06.2021 | HR | 16.06.2021 | IT | 16.06.2021 | LT | 16.06.2021 | LV | 16.06.2021 | MC | 16.06.2021 | MK | 16.06.2021 | MT | 16.06.2021 | NL | 16.06.2021 | PL | 16.06.2021 | RO | 16.06.2021 | SE | 16.06.2021 | SI | 16.06.2021 | SK | 16.06.2021 | SM | 16.06.2021 | TR | 16.06.2021 | IE | 06.07.2021 | LU | 06.07.2021 | BE | 31.07.2021 | CH | 31.07.2021 | LI | 31.07.2021 | FR | 16.08.2021 | BG | 16.09.2021 | GB | 16.09.2021 | NO | 16.09.2021 | GR | 17.09.2021 | IS | 16.10.2021 | PT | 18.10.2021 | DE | 01.02.2022 | [2026/04] |
| Former [2024/41] | HU | 06.07.2010 | |
| AL | 16.06.2021 | ||
| AT | 16.06.2021 | ||
| CY | 16.06.2021 | ||
| CZ | 16.06.2021 | ||
| DK | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| IT | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| MC | 16.06.2021 | ||
| MK | 16.06.2021 | ||
| MT | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SI | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| IE | 06.07.2021 | ||
| LU | 06.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| FR | 16.08.2021 | ||
| BG | 16.09.2021 | ||
| GB | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| DE | 01.02.2022 | ||
| Former [2024/22] | HU | 06.07.2010 | |
| AL | 16.06.2021 | ||
| AT | 16.06.2021 | ||
| CY | 16.06.2021 | ||
| CZ | 16.06.2021 | ||
| DK | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| IT | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| MC | 16.06.2021 | ||
| MK | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SI | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| IE | 06.07.2021 | ||
| LU | 06.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| FR | 16.08.2021 | ||
| BG | 16.09.2021 | ||
| GB | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| DE | 01.02.2022 | ||
| Former [2023/29] | HU | 06.07.2010 | |
| AL | 16.06.2021 | ||
| AT | 16.06.2021 | ||
| CY | 16.06.2021 | ||
| CZ | 16.06.2021 | ||
| DK | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| IT | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| MC | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SI | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| IE | 06.07.2021 | ||
| LU | 06.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| FR | 16.08.2021 | ||
| BG | 16.09.2021 | ||
| GB | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| DE | 01.02.2022 | ||
| Former [2023/24] | AL | 16.06.2021 | |
| AT | 16.06.2021 | ||
| CY | 16.06.2021 | ||
| CZ | 16.06.2021 | ||
| DK | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| IT | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| MC | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SI | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| IE | 06.07.2021 | ||
| LU | 06.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| FR | 16.08.2021 | ||
| BG | 16.09.2021 | ||
| GB | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| DE | 01.02.2022 | ||
| Former [2022/36] | AL | 16.06.2021 | |
| AT | 16.06.2021 | ||
| CZ | 16.06.2021 | ||
| DK | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| IT | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| MC | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SI | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| IE | 06.07.2021 | ||
| LU | 06.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| FR | 16.08.2021 | ||
| BG | 16.09.2021 | ||
| GB | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| DE | 01.02.2022 | ||
| Former [2022/35] | AL | 16.06.2021 | |
| AT | 16.06.2021 | ||
| CZ | 16.06.2021 | ||
| DK | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| MC | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SI | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| IE | 06.07.2021 | ||
| LU | 06.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| FR | 16.08.2021 | ||
| BG | 16.09.2021 | ||
| GB | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| DE | 01.02.2022 | ||
| Former [2022/34] | AL | 16.06.2021 | |
| AT | 16.06.2021 | ||
| CZ | 16.06.2021 | ||
| DK | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| MC | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SI | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| LU | 06.07.2021 | ||
| BE | 31.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| FR | 16.08.2021 | ||
| BG | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| DE | 01.02.2022 | ||
| Former [2022/29] | AL | 16.06.2021 | |
| AT | 16.06.2021 | ||
| CZ | 16.06.2021 | ||
| DK | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| MC | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SI | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| LU | 06.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| BG | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| DE | 01.02.2022 | ||
| Former [2022/26] | AL | 16.06.2021 | |
| AT | 16.06.2021 | ||
| CZ | 16.06.2021 | ||
| DK | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| MC | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| LU | 06.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| BG | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| DE | 01.02.2022 | ||
| Former [2022/24] | AT | 16.06.2021 | |
| CZ | 16.06.2021 | ||
| DK | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| MC | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| LU | 06.07.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| BG | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| DE | 01.02.2022 | ||
| Former [2022/21] | AT | 16.06.2021 | |
| CZ | 16.06.2021 | ||
| DK | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| MC | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| CH | 31.07.2021 | ||
| LI | 31.07.2021 | ||
| BG | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| DE | 01.02.2022 | ||
| Former [2022/18] | AT | 16.06.2021 | |
| CZ | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| MC | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| BG | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| Former [2022/10] | AT | 16.06.2021 | |
| CZ | 16.06.2021 | ||
| EE | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| PL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| BG | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| IS | 16.10.2021 | ||
| PT | 18.10.2021 | ||
| Former [2022/09] | AT | 16.06.2021 | |
| CZ | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| RO | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SK | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| BG | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| PT | 18.10.2021 | ||
| Former [2022/08] | AT | 16.06.2021 | |
| CZ | 16.06.2021 | ||
| ES | 16.06.2021 | ||
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| BG | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| Former [2022/07] | AT | 16.06.2021 | |
| FI | 16.06.2021 | ||
| HR | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| NL | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| SM | 16.06.2021 | ||
| BG | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| Former [2021/49] | FI | 16.06.2021 | |
| HR | 16.06.2021 | ||
| LT | 16.06.2021 | ||
| LV | 16.06.2021 | ||
| SE | 16.06.2021 | ||
| BG | 16.09.2021 | ||
| NO | 16.09.2021 | ||
| GR | 17.09.2021 | ||
| Former [2021/47] | FI | 16.06.2021 | |
| LT | 16.06.2021 | ||
| BG | 16.09.2021 | ||
| Former [2021/46] | FI | 16.06.2021 | |
| LT | 16.06.2021 | Documents cited: | Search | [X] WO9845768 (NORTHERN TELECOM LTD et al.) [X] 1-15 * page 4 - page 5; figures 1, 2,3, 4, 6, 8 * * page 8 - page 10 * * page 16, line 20 - line 33 * * page 24, line 19 - line 23 * | [A] US2001051928 (BRODY MOSHE et al.) [A] 1-15 * abstract * | [A] US2003070164 (BERSTIS VIKTORS et al.) [A] 1-15 * abstract * | [A] WO2008034900 (BOESGAARD SOERENSEN HANS MARTI et al.) [A] 1-15 * abstract * | [A] US2008028474 (HORNE WILLIAM G et al.) [A] 1-15 * abstract * | [A] WO2006051456 (KONINKL PHILIPS ELECTRONICS NV et al.) [A] 1-15 * abstract * | [A] US2007233604 (LARSON TIMOTHY et al.) [A] 1-15 * abstract * |