EP2278277 - Error calculation method for angle detection device [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.11.2020 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 05.12.2019 | ||
Former | Grant of patent is intended Status updated on 14.07.2019 | ||
Former | Examination is in progress Status updated on 25.05.2018 | ||
Former | Request for examination was made Status updated on 07.07.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Mitutoyo Corporation 20-1, Sakado 1-chome Takatsu-ku Kawasaki-shi, Kanagawa 213-8533 / JP | [2020/01] |
Former [2011/04] | For all designated states Mitutoyo Corporation 20-1, Sakado 1-chome, Takatsuku Kawasaki-shi Kanagawa 213-8533 / JP | Inventor(s) | 01 /
Kiyotani, Shingo c/o MITUTOYO CORPORATION 430-1, Kamiyokoba, Tsukuba-shi Ibaraki 305-0854 / JP | [2020/01] |
Former [2011/04] | 01 /
Kiyotani, Shingo c/o MITUTOYO CORPORATION 430-1, Kamiyokoba, Tsukuba-shi Ibaraki 305-0854 / JP | Representative(s) | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Strasse 29 80336 München / DE | [2020/01] |
Former [2011/04] | MERH-IP Matias Erny Reichl Hoffmann Paul-Heyse-Strasse 29 80336 München / DE | Application number, filing date | 10169027.9 | 09.07.2010 | [2011/04] | Priority number, date | JP20090163326 | 10.07.2009 Original published format: JP 2009163326 | [2011/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2278277 | Date: | 26.01.2011 | Language: | EN | [2011/04] | Type: | A3 Search report | No.: | EP2278277 | Date: | 28.12.2016 | Language: | EN | [2016/52] | Type: | B1 Patent specification | No.: | EP2278277 | Date: | 01.01.2020 | Language: | EN | [2020/01] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 30.11.2016 | Classification | IPC: | G01D5/244 | [2011/04] | CPC: |
G01D5/2448 (EP,US);
G01D5/24476 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2017/32] |
Former [2011/04] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | Fehlerberechnungsverfahren für Winkelerkennungsvorrichtungen | [2011/04] | English: | Error calculation method for angle detection device | [2011/04] | French: | Procédé de calcul des erreurs d'un dispositif de détection d'angle | [2011/04] | Examination procedure | 09.07.2010 | Date on which the examining division has become responsible | 28.06.2017 | Amendment by applicant (claims and/or description) | 28.06.2017 | Examination requested [2017/32] | 28.05.2018 | Despatch of a communication from the examining division (Time limit: M04) | 05.10.2018 | Reply to a communication from the examining division | 13.06.2019 | Date of oral proceedings | 02.07.2019 | Minutes of oral proceedings despatched | 15.07.2019 | Communication of intention to grant the patent | 21.11.2019 | Fee for grant paid | 21.11.2019 | Fee for publishing/printing paid | 21.11.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.05.2018 | Opposition(s) | 02.10.2020 | No opposition filed within time limit [2020/50] | Fees paid | Renewal fee | 23.07.2012 | Renewal fee patent year 03 | 22.07.2013 | Renewal fee patent year 04 | 23.07.2014 | Renewal fee patent year 05 | 23.07.2015 | Renewal fee patent year 06 | 22.07.2016 | Renewal fee patent year 07 | 24.07.2017 | Renewal fee patent year 08 | 27.07.2018 | Renewal fee patent year 09 | 25.07.2019 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.07.2010 | AL | 01.01.2020 | AT | 01.01.2020 | CY | 01.01.2020 | CZ | 01.01.2020 | DK | 01.01.2020 | EE | 01.01.2020 | ES | 01.01.2020 | FI | 01.01.2020 | HR | 01.01.2020 | IT | 01.01.2020 | LT | 01.01.2020 | LV | 01.01.2020 | MC | 01.01.2020 | MK | 01.01.2020 | MT | 01.01.2020 | NL | 01.01.2020 | PL | 01.01.2020 | RO | 01.01.2020 | SE | 01.01.2020 | SI | 01.01.2020 | SK | 01.01.2020 | SM | 01.01.2020 | TR | 01.01.2020 | BG | 01.04.2020 | NO | 01.04.2020 | GR | 02.04.2020 | IS | 01.05.2020 | PT | 27.05.2020 | GB | 09.07.2020 | IE | 09.07.2020 | LU | 09.07.2020 | BE | 31.07.2020 | CH | 31.07.2020 | FR | 31.07.2020 | LI | 31.07.2020 | [2022/31] |
Former [2022/30] | HU | 09.07.2010 | |
AL | 01.01.2020 | ||
AT | 01.01.2020 | ||
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MT | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
GB | 09.07.2020 | ||
IE | 09.07.2020 | ||
LU | 09.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2022/27] | HU | 09.07.2010 | |
AT | 01.01.2020 | ||
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MT | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
GB | 09.07.2020 | ||
IE | 09.07.2020 | ||
LU | 09.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2022/26] | AT | 01.01.2020 | |
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
GB | 09.07.2020 | ||
IE | 09.07.2020 | ||
LU | 09.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/37] | AT | 01.01.2020 | |
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
GB | 09.07.2020 | ||
IE | 09.07.2020 | ||
LU | 09.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/23] | AT | 01.01.2020 | |
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
GB | 09.07.2020 | ||
LU | 09.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/22] | AT | 01.01.2020 | |
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
GB | 09.07.2020 | ||
LU | 09.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/20] | AT | 01.01.2020 | |
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
LU | 09.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/13] | AT | 01.01.2020 | |
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2021/10] | AT | 01.01.2020 | |
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/50] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/49] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/48] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
SE | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/47] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/40] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/39] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/38] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
SE | 01.01.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/37] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
SE | 01.01.2020 | ||
NO | 01.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/36] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
LT | 01.01.2020 | ||
NL | 01.01.2020 | ||
NO | 01.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/35] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
LT | 01.01.2020 | ||
NL | 01.01.2020 | ||
NO | 01.04.2020 | ||
Former [2020/33] | NL | 01.01.2020 | Documents cited: | Search | [XI]JP2007024636 (SONY CORP) [X] 1 * abstract * [I] 1-4; | [XI]JP2007178320 (SOKKIA CO LTD) [X] 1 * abstract * [I] 1-4; | [I]DE19920596 (MAERZHAEUSER SENSO TECH GMBH [DE]) [I] 1-4 * column 3 - column 5; figure 1 *; | [I]EP0395936 (HEIDENHAIN GMBH DR JOHANNES [DE]) [I] 1-4 * column 4 - column 6; figures 1-2 *; | [I]EP0302194 (HEIDENHAIN GMBH DR JOHANNES [DE]) [I] 1-4 * column 4; figure 1 * | Examination | DE9422281U | by applicant | JPH07140844 | JP3826207B |