EP2420849 - Rogowski coil assembly [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.08.2020 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 20.09.2019 | ||
Former | Grant of patent is intended Status updated on 16.09.2019 | ||
Former | Request for examination was made Status updated on 10.08.2019 | ||
Former | Grant of patent is intended Status updated on 07.04.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states General Electric Technology GmbH Brown Boveri Strasse 7 5400 Baden / CH | [2016/33] |
Former [2012/08] | For all designated states Alstom Technology Ltd Brown Boveri Strasse 7 5401 Baden / CH | Inventor(s) | 01 /
Hobelsberger, Max c/o ALSTOM Technology LTD Brown Boveri Strasse 7 5401 BADEN / CH | 02 /
Gerber, Dominic c/o ALSTOM Technology LTD Brown Boveri Strasse 7 5401 BADEN / CH | [2012/08] | Representative(s) | Freigutpartners IP Law Firm Hahnrainweg 4 5400 Baden / CH | [2019/43] |
Former [2012/08] | (deleted) | Application number, filing date | 10173535.5 | 20.08.2010 | [2012/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2420849 | Date: | 22.02.2012 | Language: | EN | [2012/08] | Type: | B1 Patent specification | No.: | EP2420849 | Date: | 23.10.2019 | Language: | EN | [2019/43] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 01.02.2011 | Classification | IPC: | G01R15/18 | [2012/08] | CPC: |
G01R15/181 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2019/43] |
Former [2012/08] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | Rogowski-Spulen-Anordnung | [2012/08] | English: | Rogowski coil assembly | [2012/08] | French: | Ensemble de bobine de Rogowski | [2012/08] | Examination procedure | 21.08.2012 | Examination requested [2012/41] | 22.08.2012 | Amendment by applicant (claims and/or description) | 08.04.2019 | Communication of intention to grant the patent | 08.08.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 08.08.2019 | Fee for grant paid | 08.08.2019 | Fee for publishing/printing paid | 16.09.2019 | Information about intention to grant a patent | 16.09.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 08.04.2019 | Opposition(s) | 24.07.2020 | No opposition filed within time limit [2020/40] | Fees paid | Renewal fee | 08.08.2012 | Renewal fee patent year 03 | 07.08.2013 | Renewal fee patent year 04 | 07.08.2014 | Renewal fee patent year 05 | 20.08.2015 | Renewal fee patent year 06 | 31.08.2016 | Renewal fee patent year 07 | 31.08.2017 | Renewal fee patent year 08 | 31.08.2018 | Renewal fee patent year 09 | 20.08.2019 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.08.2010 | AL | 23.10.2019 | AT | 23.10.2019 | CY | 23.10.2019 | CZ | 23.10.2019 | DK | 23.10.2019 | EE | 23.10.2019 | ES | 23.10.2019 | FI | 23.10.2019 | HR | 23.10.2019 | LT | 23.10.2019 | LV | 23.10.2019 | MC | 23.10.2019 | MK | 23.10.2019 | MT | 23.10.2019 | NL | 23.10.2019 | PL | 23.10.2019 | RO | 23.10.2019 | SE | 23.10.2019 | SI | 23.10.2019 | SK | 23.10.2019 | SM | 23.10.2019 | TR | 23.10.2019 | BG | 23.01.2020 | NO | 23.01.2020 | GR | 24.01.2020 | IS | 23.02.2020 | PT | 24.02.2020 | [2022/32] |
Former [2022/27] | HU | 20.08.2010 | |
AL | 23.10.2019 | ||
AT | 23.10.2019 | ||
CY | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
MT | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
TR | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2022/26] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
TR | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2021/18] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
MC | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/51] | AL | 23.10.2019 | |
AT | 23.10.2019 | ||
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
SE | 23.10.2019 | ||
SI | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/37] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
SE | 23.10.2019 | ||
SK | 23.10.2019 | ||
SM | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/36] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
DK | 23.10.2019 | ||
EE | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 23.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/35] | AL | 23.10.2019 | |
CZ | 23.10.2019 | ||
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
RO | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/32] | AL | 23.10.2019 | |
ES | 23.10.2019 | ||
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/25] | ES | 23.10.2019 | |
FI | 23.10.2019 | ||
HR | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/24] | ES | 23.10.2019 | |
FI | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
IS | 24.02.2020 | ||
PT | 24.02.2020 | ||
Former [2020/23] | ES | 23.10.2019 | |
FI | 23.10.2019 | ||
LT | 23.10.2019 | ||
LV | 23.10.2019 | ||
NL | 23.10.2019 | ||
PL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
GR | 24.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/22] | FI | 23.10.2019 | |
LT | 23.10.2019 | ||
NL | 23.10.2019 | ||
SE | 23.10.2019 | ||
BG | 23.01.2020 | ||
NO | 23.01.2020 | ||
PT | 24.02.2020 | ||
Former [2020/21] | NL | 23.10.2019 | |
NO | 23.01.2020 | ||
Former [2020/20] | NL | 23.10.2019 | Documents cited: | Search | [A]US3146417 (PEARSON PAUL A) [A] 1,2,6,7,14,15 * figure 11 * * column 4, line 63 - column 5, line 44 *; | [XY]GB2259150 (RAY WILLIAM FREDERICK [GB], et al) [X] 1,2,5-7,9-15 * figures 2,3,5,6,7 * * page 1, paragraph 1 - paragraph 2 * * page 2, paragraph 2 - page 10, paragraph 1 * [Y] 3,4; | [X]WO9954740 (POWER ELECTRONIC MEASUREMENTS [GB], et al) [X] 1,2,5-7,9-15 * figures 1-7 * * page 1, line 4 - line 9 * * page 2, line 9 - line 16 * * page 3, line 12 - page 10, line 6 * * page 10, line 26 - page 11, line 7 * * page 12, line 17 - page 13, line 26 *; | [XD]WO0072027 (ARBEITSGEMEINSCHAFT PROF HUGEL [CH], et al) [XD] 1,2,6,7,10,14,15 * figures 1,6,8,9 * * page 1, paragraph 1 * * page 7, paragraph l - page 8, paragraph 2 * * page 13, paragraph l - page 14, paragraph 2 *; | [Y]US2006091896 (SCHROM GERHARD [US], et al) [Y] 3,4 * paragraph [0023] - paragraph [0025] *; | [A]WO2006123320 (SUPARULES LTD [IE], et al) [A] 1,2,6,7,14,15 * figures 6,7 ** page 18, line 10 - line 23 *; | [A]WO2007000062 (ABB RESEARCH LTD [CH], et al) [A] 1-7,14,15 * figures 1,2, * * page 8, line 7 - page 9, line 17 *; | [X] - RAY W F ET AL, "High performance rogowski current transducers", INDUSTRY APPLICATIONS CONFERENCE, 2000. CONFERENCE RECORD OF THE 2000 IEEE 8-12 OCTOBER 2000, PISCATAWAY, NJ, USA,IEEE, (20001008), vol. 5, ISBN 978-0-7803-6401-1, pages 3083 - 3090, XP010521726 [X] 1,2,5-7,9-15 * the whole document * | [A] - WEI LI ET AL, "The Study of Transient Performance of Current Sensor Based on Rogowski Coil and Its Application in Dynamic Simulation Experiment", POWER SYSTEM TECHNOLOGY, 2006. POWERCON 2006. INTERNATIONAL CONFERENCE ON, IEEE, PI, (20061001), ISBN 978-1-4244-0110-9, pages 1 - 6, XP031053661 [A] 1-7,14,15 * figure 8 * * paragraph [00IV] * | by applicant | WO9848287 | WO0072027 | US7102379 |