blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2309100

EP2309100 - Method of forming a pressure measurement hole in a gas turbine engine component [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.10.2018
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  27.10.2017
FormerGrant of patent is intended
Status updated on  17.09.2017
Most recent event   Tooltip10.07.2020Lapse of the patent in a contracting state
New state(s): AL, IS
published on 12.08.2020  [2020/33]
Applicant(s)For all designated states
Rolls-Royce plc
62 Buckingham Gate
London SW1E 6AT / GB
[2015/31]
Former [2011/15]For all designated states
Rolls-Royce plc
65 Buckingham Gate
London SW1E 6AT / GB
Inventor(s)01 / Dimelow, Stephen
5 Oak Tree Gardens
Uttoxeter, Staffordshire ST14 7QB / GB
 [2017/48]
Former [2011/15]01 / Dimelow, Stephen
5 Oak Tree Gardens
Uttoxeter, Staffordshire ST14 7QB / GB
Representative(s)Rolls-Royce plc
Moor Lane (ML-9)
PO Box 31
Derby DE24 8BJ / GB
[N/P]
Former [2017/48]Rolls-Royce plc
Intellectual Property Dept SinA-48
PO Box 31
Derby DE24 8BJ / GB
Former [2011/15]Gee, Philip David, et al
Rolls-Royce plc Patents Department (ML-9) P.O. Box 31
Derby DE24 8BJ / GB
Application number, filing date10174259.127.08.2010
[2011/15]
Priority number, dateGB2009001741006.10.2009         Original published format: GB 0917410
[2011/15]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2309100
Date:13.04.2011
Language:EN
[2011/15]
Type: A3 Search report 
No.:EP2309100
Date:01.01.2014
Language:EN
[2014/01]
Type: B1 Patent specification 
No.:EP2309100
Date:29.11.2017
Language:EN
[2017/48]
Search report(s)(Supplementary) European search report - dispatched on:EP02.12.2013
ClassificationIPC:F01D21/00, F01D17/08
[2011/15]
CPC:
F01D21/003 (EP,US); B64D15/12 (EP,US); B64D15/20 (EP,US);
F01D17/08 (EP,US); F05D2230/20 (EP,US); F05D2230/50 (EP,US);
F05D2240/14 (EP,US); F05D2250/19 (EP,US); F05D2250/62 (EP,US);
Y10T29/49 (US); Y10T408/03 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2017/48]
Former [2011/15]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verfahren zur Bildung eines Druckmessloches in einem Bauteil eines Flugtriebwerks[2011/15]
English:Method of forming a pressure measurement hole in a gas turbine engine component[2011/15]
French:Procédé de formation d'un trou de mesure de la pression dans un composant d'une turbine à gaz[2011/15]
Examination procedure27.06.2014Amendment by applicant (claims and/or description)
27.06.2014Examination requested  [2014/32]
18.09.2017Communication of intention to grant the patent
12.10.2017Fee for grant paid
12.10.2017Fee for publishing/printing paid
12.10.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  18.09.2017
Opposition(s)30.08.2018No opposition filed within time limit [2018/45]
Fees paidRenewal fee
23.08.2012Renewal fee patent year 03
27.08.2013Renewal fee patent year 04
27.08.2014Renewal fee patent year 05
27.08.2015Renewal fee patent year 06
29.08.2016Renewal fee patent year 07
28.08.2017Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.08.2010
AL29.11.2017
AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
MK29.11.2017
NL29.11.2017
PL29.11.2017
PT29.11.2017
RO29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
IS29.03.2018
IE27.08.2018
LU27.08.2018
MT27.08.2018
[2020/33]
Former [2020/31]HU27.08.2010
AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
MK29.11.2017
NL29.11.2017
PL29.11.2017
PT29.11.2017
RO29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
IE27.08.2018
LU27.08.2018
MT27.08.2018
Former [2020/30]HU27.08.2010
AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
PT29.11.2017
RO29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
IE27.08.2018
LU27.08.2018
MT27.08.2018
Former [2020/27]HU27.08.2010
AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
PT29.11.2017
RO29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
LU27.08.2018
MT27.08.2018
Former [2020/16]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
TR29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
LU27.08.2018
MT27.08.2018
Former [2020/08]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
LU27.08.2018
MT27.08.2018
Former [2019/21]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
LU27.08.2018
Former [2019/15]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
MC29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/52]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
SE29.11.2017
SI29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/40]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
PL29.11.2017
RO29.11.2017
SE29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/39]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
IT29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
PL29.11.2017
SE29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/37]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
PL29.11.2017
SE29.11.2017
SK29.11.2017
SM29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/35]AT29.11.2017
CY29.11.2017
CZ29.11.2017
DK29.11.2017
EE29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
SE29.11.2017
SK29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/34]AT29.11.2017
DK29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
NL29.11.2017
SE29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/24]AT29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
LV29.11.2017
SE29.11.2017
BG28.02.2018
NO28.02.2018
GR01.03.2018
Former [2018/23]AT29.11.2017
ES29.11.2017
FI29.11.2017
HR29.11.2017
LT29.11.2017
SE29.11.2017
NO28.02.2018
GR01.03.2018
Former [2018/22]ES29.11.2017
FI29.11.2017
LT29.11.2017
NO28.02.2018
Former [2018/21]FI29.11.2017
LT29.11.2017
NO28.02.2018
Documents cited:Search[XAYI]WO2005085065  (AEROCONTROLEX GROUP [US], et al) [X] 8,9,12 * paragraphs [0002] , [0018] , [0019] , [0021] , [0022] , [0032] , [0034]; figures 1,2,4 * [A] 1-7 [Y] 14,15 [I] 10,11,13;
 [Y]US4872807  (THOMPSON FRANK B [US]) [Y] 14,15 * column 2, line 60 - column 3, line 2; figure 2 *;
 [A]EP1145952  (EADS AIRBUS SA [FR]) [A] 1-15 * paragraphs [0007] , [0026] , [0030]; figures 3,5 *;
 [A]EP1405986  (GEN ELECTRIC [US]) [A] 8,12 * abstract *;
 [A]WO0063070  (BAE SYSTEMS PLC [GB], et al) [A] 1-7 * page 4, line 15 - page 5, line 29; figure 2 *;
 [A]DE19645164  (MTU MUENCHEN GMBH [DE]) [A] 1-15 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.