EP2291033 - TELECOMMUNICATIONS NETWORK AND METHOD FOR TIME-BASED NETWORK ACCESS [Right-click to bookmark this link] | |||
Former [2011/09] | Telecommunications network and method for time-based network access | ||
[2020/01] | Status | Patent maintained as amended Status updated on 26.08.2022 Database last updated on 20.11.2024 | |
Former | The patent has been granted Status updated on 05.06.2020 | ||
Former | Grant of patent is intended Status updated on 05.12.2019 | ||
Former | Examination is in progress Status updated on 23.01.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Koninklijke KPN N.V. Wilhelminakade 123 3072 AP Rotterdam / NL | [2018/24] |
Former [2015/28] | For all designated states Koninklijke KPN N.V. Maanplein 55 2516 CK The Hague / NL | ||
Former [2011/09] | For all designated states Koninklijke KPN N.V. Maanplein 55 2516 CK The Hague / NL | ||
For all designated states Nederlandse Organisatie voor Toegepast -Natuurwetenschappelijk Onderzoek TNO Schoemakerstraat 97 2628 VK Delft / NL | Inventor(s) | 01 /
Schenk, Michael Kleine Nobelstraat 28 2513 BZ, The Hague / NL | 02 /
van Loon, Johannes Maria Makorehout 31 2719 JE, Zoetermeer / NL | [2020/28] |
Former [2011/09] | 01 /
Schenk, Michael Kleine Nobelstraat 28 2513 BZ, The Hague / NL | ||
02 /
van Loon, Johannes Maria Makorehout 31 2719 JE, Zoetermeer / NL | Representative(s) | Wuyts, Koenraad Maria Koninklijke KPN N.V. Intellectual Property Group P.O. Box 25110 3001 HC Rotterdam / NL | [2020/28] | Application number, filing date | 10174609.7 | 19.02.2009 | [2011/09] | Priority number, date | EP20080003753 | 29.02.2008 Original published format: EP 08003753 | [2011/09] | Previously filed application, date | EP20090714031 | 19.02.2009 | [2011/09] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2291033 | Date: | 02.03.2011 | Language: | EN | [2011/09] | Type: | A3 Search report | No.: | EP2291033 | Date: | 09.03.2011 | [2011/10] | Type: | B1 Patent specification | No.: | EP2291033 | Date: | 08.07.2020 | Language: | EN | [2020/28] | Type: | B2 New European patent specification | No.: | EP2291033 | Date: | 28.09.2022 | Language: | EN | [2022/39] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.02.2011 | Classification | IPC: | H04W4/70, H04M3/38, H04W76/11, // H04W8/26, H04W74/00, H04W12/06, H04W12/00 | [2019/50] | CPC: |
H04M3/38 (EP,KR,US);
H04W48/02 (KR);
H04W74/04 (KR,US);
H04W28/0247 (KR,US);
H04W4/50 (KR,US);
H04W4/70 (EP,KR,US);
H04W48/08 (KR,US);
H04W74/002 (KR,US);
H04W76/11 (EP,KR,US);
H04W12/06 (EP,US);
H04W12/61 (EP,US);
H04W12/72 (EP,US);
|
Former IPC [2011/09] | H04W48/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2020/28] |
Former [2011/09] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | TELEKOMMUNIKATIONSNETZWERK UND VERFAHREN FÜR DEN ZEITBASIERTEN NETZWERKZUGANG | [2020/01] | English: | TELECOMMUNICATIONS NETWORK AND METHOD FOR TIME-BASED NETWORK ACCESS | [2020/01] | French: | RÉSEAU DE TÉLÉCOMMUNICATION ET PROCÉDÉ D'ACCÈS DE RÉSEAU EN FONCTION DU TEMPS | [2020/01] |
Former [2011/09] | Telekommunikationsnetzwerk und Verfahren für den zeitbasierten Netzwerkzugang | ||
Former [2011/09] | Telecommunications network and method for time-based network access | ||
Former [2011/09] | Réseau de télécommunication et procédé d'accès de réseau en fonction du temps | Examination procedure | 09.09.2011 | Amendment by applicant (claims and/or description) | 09.09.2011 | Examination requested [2011/42] | 08.02.2012 | Despatch of a communication from the examining division (Time limit: M06) | 17.08.2012 | Reply to a communication from the examining division | 20.09.2016 | Despatch of a communication from the examining division (Time limit: M06) | 10.03.2017 | Reply to a communication from the examining division | 15.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 10.07.2018 | Reply to a communication from the examining division | 14.12.2018 | Despatch of a communication from the examining division (Time limit: M06) | 21.05.2019 | Reply to a communication from the examining division | 06.12.2019 | Communication of intention to grant the patent | 13.02.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 28.02.2020 | Communication of intention to grant the patent | 28.05.2020 | Fee for grant paid | 28.05.2020 | Fee for publishing/printing paid | 28.05.2020 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP09714031.3 / EP2250835 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20090714031) is 04.02.2011 | Opposition(s) | Opponent(s) | 01
08.04.2021
23.07.2021
WITHDRAWN Guangdong OPPO Mobile Telecommunications Corp., Ltd. No. 18 Haibin Road Wusha Chang'an Dongguan Guangdong 523860 / CN Opponent's representative Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2021/35] |
Former [2021/20] | |||
Opponent(s) | 01
08.04.2021
08.04.2021
ADMISSIBLE Guangdong OPPO Mobile Telecommunications Corp., Ltd. No. 18 Haibin Road Wusha Chang'an Dongguan Guangdong 523860 / CN Opponent's representative Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | 22.04.2021 | Invitation to proprietor to file observations on the notice of opposition | 02.09.2021 | Reply of patent proprietor to notice(s) of opposition | 10.02.2022 | Cancellation of oral proceeding that was planned for 17.05.2022 | 31.03.2022 | Despatch of interlocutory decision in opposition | 10.04.2022 | Legal effect of interlocutory decision in opposition | 17.05.2022 | Date of oral proceedings | 18.07.2022 | Despatch of communication that the patent will be maintained as amended | 19.08.2022 | Fee for printing new specification paid | Fees paid | Renewal fee | 28.02.2011 | Renewal fee patent year 03 | 29.02.2012 | Renewal fee patent year 04 | 28.02.2013 | Renewal fee patent year 05 | 28.02.2014 | Renewal fee patent year 06 | 02.03.2015 | Renewal fee patent year 07 | 29.02.2016 | Renewal fee patent year 08 | 28.02.2017 | Renewal fee patent year 09 | 28.02.2018 | Renewal fee patent year 10 | 28.02.2019 | Renewal fee patent year 11 | 02.03.2020 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.02.2009 | CY | 08.07.2020 | CZ | 08.07.2020 | EE | 08.07.2020 | HR | 08.07.2020 | LT | 08.07.2020 | LV | 08.07.2020 | MC | 08.07.2020 | MK | 08.07.2020 | MT | 08.07.2020 | RO | 08.07.2020 | SI | 08.07.2020 | SK | 08.07.2020 | TR | 08.07.2020 | BG | 08.10.2020 | NO | 08.10.2020 | GR | 09.10.2020 | PT | 09.11.2020 | LU | 19.02.2021 | [2024/41] |
Former [2024/29] | HU | 19.02.2009 | |
CY | 08.07.2020 | ||
CZ | 08.07.2020 | ||
EE | 08.07.2020 | ||
HR | 08.07.2020 | ||
LT | 08.07.2020 | ||
LV | 08.07.2020 | ||
MC | 08.07.2020 | ||
MK | 08.07.2020 | ||
RO | 08.07.2020 | ||
SI | 08.07.2020 | ||
SK | 08.07.2020 | ||
TR | 08.07.2020 | ||
BG | 08.10.2020 | ||
NO | 08.10.2020 | ||
GR | 09.10.2020 | ||
PT | 09.11.2020 | ||
LU | 19.02.2021 | ||
Former [2024/22] | HU | 19.02.2009 | |
CY | 08.07.2020 | ||
CZ | 08.07.2020 | ||
EE | 08.07.2020 | ||
HR | 08.07.2020 | ||
LT | 08.07.2020 | ||
LV | 08.07.2020 | ||
MC | 08.07.2020 | ||
MK | 08.07.2020 | ||
RO | 08.07.2020 | ||
SI | 08.07.2020 | ||
SK | 08.07.2020 | ||
BG | 08.10.2020 | ||
NO | 08.10.2020 | ||
GR | 09.10.2020 | ||
PT | 09.11.2020 | ||
LU | 19.02.2021 | ||
Former [2023/27] | HU | 19.02.2009 | |
CY | 08.07.2020 | ||
CZ | 08.07.2020 | ||
EE | 08.07.2020 | ||
HR | 08.07.2020 | ||
LT | 08.07.2020 | ||
LV | 08.07.2020 | ||
MC | 08.07.2020 | ||
RO | 08.07.2020 | ||
SI | 08.07.2020 | ||
SK | 08.07.2020 | ||
BG | 08.10.2020 | ||
NO | 08.10.2020 | ||
GR | 09.10.2020 | ||
PT | 09.11.2020 | ||
LU | 19.02.2021 | ||
Former [2023/24] | CY | 08.07.2020 | |
CZ | 08.07.2020 | ||
EE | 08.07.2020 | ||
HR | 08.07.2020 | ||
LT | 08.07.2020 | ||
LV | 08.07.2020 | ||
MC | 08.07.2020 | ||
RO | 08.07.2020 | ||
SI | 08.07.2020 | ||
SK | 08.07.2020 | ||
BG | 08.10.2020 | ||
NO | 08.10.2020 | ||
GR | 09.10.2020 | ||
PT | 09.11.2020 | ||
LU | 19.02.2021 | ||
Former [2021/47] | CZ | 08.07.2020 | |
EE | 08.07.2020 | ||
HR | 08.07.2020 | ||
LT | 08.07.2020 | ||
LV | 08.07.2020 | ||
MC | 08.07.2020 | ||
RO | 08.07.2020 | ||
SI | 08.07.2020 | ||
SK | 08.07.2020 | ||
BG | 08.10.2020 | ||
NO | 08.10.2020 | ||
GR | 09.10.2020 | ||
PT | 09.11.2020 | ||
LU | 19.02.2021 | ||
Former [2021/41] | CZ | 08.07.2020 | |
EE | 08.07.2020 | ||
HR | 08.07.2020 | ||
LT | 08.07.2020 | ||
LV | 08.07.2020 | ||
MC | 08.07.2020 | ||
RO | 08.07.2020 | ||
SI | 08.07.2020 | ||
SK | 08.07.2020 | ||
BG | 08.10.2020 | ||
NO | 08.10.2020 | ||
GR | 09.10.2020 | ||
PT | 09.11.2020 | ||
Former [2021/36] | CZ | 08.07.2020 | |
EE | 08.07.2020 | ||
HR | 08.07.2020 | ||
LT | 08.07.2020 | ||
LV | 08.07.2020 | ||
RO | 08.07.2020 | ||
SI | 08.07.2020 | ||
SK | 08.07.2020 | ||
BG | 08.10.2020 | ||
NO | 08.10.2020 | ||
GR | 09.10.2020 | ||
PT | 09.11.2020 | ||
Former [2021/28] | CZ | 08.07.2020 | |
EE | 08.07.2020 | ||
HR | 08.07.2020 | ||
LT | 08.07.2020 | ||
LV | 08.07.2020 | ||
RO | 08.07.2020 | ||
SK | 08.07.2020 | ||
BG | 08.10.2020 | ||
NO | 08.10.2020 | ||
GR | 09.10.2020 | ||
PT | 09.11.2020 | ||
Former [2021/22] | CZ | 08.07.2020 | |
EE | 08.07.2020 | ||
HR | 08.07.2020 | ||
LT | 08.07.2020 | ||
LV | 08.07.2020 | ||
RO | 08.07.2020 | ||
BG | 08.10.2020 | ||
NO | 08.10.2020 | ||
GR | 09.10.2020 | ||
PT | 09.11.2020 | ||
Former [2021/10] | HR | 08.07.2020 | |
LT | 08.07.2020 | ||
LV | 08.07.2020 | ||
BG | 08.10.2020 | ||
NO | 08.10.2020 | ||
GR | 09.10.2020 | ||
PT | 09.11.2020 | ||
Former [2021/09] | LT | 08.07.2020 | |
BG | 08.10.2020 | ||
NO | 08.10.2020 | ||
GR | 09.10.2020 | ||
PT | 09.11.2020 | ||
Former [2021/07] | LT | 08.07.2020 | |
NO | 08.10.2020 | Documents cited: | Search | [XA]WO0155861 (HILL VINCENT [US]) [X] 1,2,4-13,15-23 * abstract * * page 1, lines 10-14 * * page 2, lines 16,17 * * page 3, line 15 - page 4, line 13 * * page 7, line 14 - page 8, line 13 * * page 11, lines 20,21 * * page 14, lines 6-22 * * claims 1-35 * [A] 3,14; | [A]US2003156700 (BROWN MICHAEL WAYNE [US], et al) [A] 1-23 * the whole document *; | [A]US2007271598 (CHEN LEE [US], et al) [A] 1-23 * the whole document *; | [AD] - "Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); Technical realization of Operator Determined Barring (ODB) (3GPP TS 23.015 version 7.0.0 Release 7); ETSI TS 123 015", ETSI STANDARDS, LIS, SOPHIA ANTIPOLIS CEDEX, FRANCE, (20070301), vol. 3-CN2;3-CN4, no. V7.0.0, ISSN 0000-0001, XP014037698 [AD] 1-23 * the whole document * | Examination | EP1681815 | by applicant | WO0155861 | Opposition | US2002162008 | US2004147266 | EP1681815 | US2008013489 | WO2008107306 | - "3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Interworking between the Public Land Mobile Network (PLMN) supporting packet based services and Packet Data Networks (PDN) (Release 5)", 3GPP Standard; 29061-591, (20050623), XP050908694 | - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS); Service description; Stage 2 (Release 7)", 3GPP TS 23.060, (20071200), XP055797106 | - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on Facilitating Machine to Machine Communication in 3GPP Systems; (Release 8)", 3GPP Standard; 22868, (20070323), XP050910660 | - JUNG-WOO JIN et al., "A Deterministic Back-off Algorithm for Wireless Networks", Department of Computer Engineering, Korea, pages 310 - 312 | - Docomo Ntt, "Consideration on PDP context activation establishment failure for UTRAN/GERAN Capable UE", 3GPP S-2075262, (20070000), XP055797161 |