blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2441485

EP2441485 - Pump module, pump base module and pump system [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  08.03.2013
Database last updated on 13.11.2024
Most recent event   Tooltip08.03.2013Application deemed to be withdrawnpublished on 10.04.2013  [2013/15]
Applicant(s)For all designated states
Fresenius Kabi Deutschland GmbH
Else-Kröner-Strasse 1
61352 Bad Homburg / DE
[2012/16]
Inventor(s)01 / Becker, Michael
Fresenius Kabi Deutschland GmbH
Am Mühlkanal 40
75438 Knittlingen / DE
 [2012/16]
Representative(s)(deleted)
[2013/14]
Former [2012/16]Richly, Erik, et al
Fresenius Kabi Deutschland GmbH
Patent Department
Else-Kröner-Strasse 1
61352 Bad Homburg / DE
Application number, filing date10187381.813.10.2010
[2012/16]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2441485
Date:18.04.2012
Language:DE
[2012/16]
Search report(s)(Supplementary) European search report - dispatched on:EP01.04.2011
ClassificationIPC:A61M5/142, A61M5/14, F04B43/14, F04B43/12, // A61M5/168, A61M39/24, A61M39/26
[2012/16]
CPC:
A61M5/1413 (EP,US); A61M5/14 (KR); F04B43/12 (KR,US);
A61M39/24 (EP,KR,US); A61M5/142 (KR); A61M5/14232 (EP,US);
F01C9/005 (US); F04B43/082 (US); F04B43/1207 (EP,US);
F04B43/123 (US); F04B43/1238 (US); F04B43/1253 (US);
F04B43/14 (EP,US); F04C9/005 (US); F16K31/126 (US);
A61M2005/16868 (EP,US); A61M2005/16872 (EP,US); A61M2205/128 (EP,US);
A61M2205/3351 (EP,US); A61M2205/3355 (EP,US); A61M2205/6045 (EP,US);
A61M39/26 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2012/16]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:Pumpenmodul, Pumpenbasismodul und Pumpenssystem[2012/16]
English:Pump module, pump base module and pump system[2012/16]
French:Module de pompe, module à base de pompe et système de pompe[2012/16]
Examination procedure19.10.2012Application deemed to be withdrawn, date of legal effect  [2013/15]
22.11.2012Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2013/15]
Fees paidPenalty fee
Additional fee for renewal fee
31.10.201203   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]DE1528971  (BECK KG WALTER) [X] 1-5 * the whole document *;
 [A]NL7509443  (VIAL SARL) [A] 1-5 * the whole document *;
 [A]EP0604740  (KNF NEUBERGER GMBH [DE]) [A] 1-5 * the whole document *
by applicantUS5466133
 DE3227051
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.