blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2320283

EP2320283 - Integrated optimization and control for production plants [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  28.08.2015
Database last updated on 16.09.2024
Most recent event   Tooltip28.08.2015Application deemed to be withdrawnpublished on 30.09.2015  [2015/40]
Applicant(s)For all designated states
Rockwell Automation Technologies, Inc.
1 Allen-Bradley Drive
Mayfield Heights, OH 44124 / US
[2011/19]
Inventor(s)01 / Sayyar-Rodsari, Bijan
6800 Rustling Oaks Trail
Austin, TX 78759 / US
02 / Schweiger, Carl Anthony
9003 Frazell Cove
Round Rock, TX 78681 / US
 [2011/19]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstrasse 4
80802 München / DE
[N/P]
Former [2011/19]Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät
Leopoldstrasse 4
80802 München / DE
Application number, filing date10189335.229.10.2010
[2011/19]
Priority number, dateUS2009060978530.10.2009         Original published format: US 609785
[2011/19]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2320283
Date:11.05.2011
Language:EN
[2011/19]
Search report(s)(Supplementary) European search report - dispatched on:EP11.02.2011
ClassificationIPC:G05B13/04
[2011/19]
CPC:
G05B13/04 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2011/19]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:Integrierte Optimierung und Steuerung für Fertigungsanlagen[2011/19]
English:Integrated optimization and control for production plants[2011/19]
French:Optimisation intégrée et contrôle d'usines de production[2011/19]
Examination procedure11.11.2011Amendment by applicant (claims and/or description)
11.11.2011Examination requested  [2011/51]
08.08.2012Despatch of a communication from the examining division (Time limit: M06)
18.02.2013Reply to a communication from the examining division
01.05.2015Application deemed to be withdrawn, date of legal effect  [2015/40]
28.05.2015Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2015/40]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  08.08.2012
Fees paidRenewal fee
25.10.2012Renewal fee patent year 03
28.10.2013Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
31.10.201405   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[I]US6434435  (TUBEL PAULO S [US], et al) [I] 1-15 * column 1, line 15 - column 2, line 67 * * column 4, line 5 - line 44 * * column 6, line 41 - column 10, line 43 * * column 12, line 45 - column 13, line 6 * * column 17, line 1 - column 18, line 42 * * figures 1,11,13,15 *;
 [XI]US2007156288  (WROBLEWSKI DAVID J [US], et al) [X] 1-6,9-11,13,15 * paragraph [0021] - paragraph [0024] * * paragraph [0056] - paragraph [0083] * * paragraph [0110] - paragraph [0136] * * figures 3-8 * [I] 7,8,12,14;
 [A]US2008108048  (BARTEE JAMES F [US], et al) [A] 1,8,9,14,15 * paragraph [0032] - paragraph [0046] * * paragraph [0125] - paragraph [0147] ** figures 7,8 *
ExaminationUS2005187643
by applicantUS2005187643
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.