| EP2405362 - A connection arrangement [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.11.2013 Database last updated on 28.03.2026 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states STMicroelectronics (Grenoble 2) SAS 12, rue Jules Horowitz 38000 Grenoble / FR | For all designated states STMicroelectronics Srl Via Olivetti 2 20864 Agrate Brianza / IT | [N/P] |
| Former [2012/19] | For all designated states STMicroelectronics (Grenoble 2) SAS 12, Rue Jules Horowitz 38000 Grenoble / FR | ||
| For all designated states STMicroelectronics Srl Via Olivetti 2 20864 Agrate Brianza / IT | |||
| Former [2012/02] | For all designated states STMicroelectronics (Grenoble 2) SAS 12, Rue Jules Horowitz 38000 Grenoble / FR | ||
| For all designated states STMicroelectronics S.r.l. Stradale Primosole, 50 95100 Catania / IT | Inventor(s) | 01 /
Urzi, Ignazio Antonino c/o STMicroelectronics (Grenoble 2) SAS 12, Rue Jules Horowitz 38000, Grenoble / FR | 02 /
Mangano, Daniele c/o STMicroelectronics Srl Stradale Primosole 50 95100, Catania / IT | 03 /
Bonnet, Claire c/o STMicroelectronics (Grenoble 2) SAS 12, Rue Jules Horowitz 38000, Grenoble / FR | [2012/02] | Representative(s) | Style, Kelda Camilla Karen Page White & Farrer Limited Bedford House 21A John Street London WC1N 2BF / GB | [N/P] |
| Former [2012/02] | Style, Kelda Camilla Karen Page White & Farrer Bedford House John Street London, WC1N 2BF / GB | Application number, filing date | 10305762.6 | 08.07.2010 | [2012/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2405362 | Date: | 11.01.2012 | Language: | EN | [2012/02] | Type: | B1 Patent specification | No.: | EP2405362 | Date: | 16.01.2013 | Language: | EN | [2013/03] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 07.10.2010 | Classification | IPC: | G06F13/40 | [2012/02] | CPC: |
G06F15/7825 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/02] | Title | German: | Verbindungsanordnung | [2012/02] | English: | A connection arrangement | [2012/02] | French: | Agencement de connexion | [2012/02] | Examination procedure | 02.07.2012 | Examination requested [2012/32] | 13.08.2012 | Communication of intention to grant the patent | 04.12.2012 | Fee for grant paid | 04.12.2012 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.08.2012 | Opposition(s) | 17.10.2013 | No opposition filed within time limit [2013/52] | Fees paid | Renewal fee | 24.07.2012 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.07.2010 | AL | 16.01.2013 | AT | 16.01.2013 | BE | 16.01.2013 | CY | 16.01.2013 | CZ | 16.01.2013 | DK | 16.01.2013 | EE | 16.01.2013 | FI | 16.01.2013 | HR | 16.01.2013 | IT | 16.01.2013 | LT | 16.01.2013 | LV | 16.01.2013 | MC | 16.01.2013 | MK | 16.01.2013 | MT | 16.01.2013 | NL | 16.01.2013 | PL | 16.01.2013 | RO | 16.01.2013 | SE | 16.01.2013 | SI | 16.01.2013 | SK | 16.01.2013 | SM | 16.01.2013 | TR | 16.01.2013 | BG | 16.04.2013 | NO | 16.04.2013 | GR | 17.04.2013 | ES | 27.04.2013 | IS | 16.05.2013 | PT | 16.05.2013 | IE | 08.07.2013 | LU | 08.07.2013 | [2018/46] |
| Former [2015/34] | HU | 08.07.2010 | |
| AT | 16.01.2013 | ||
| BE | 16.01.2013 | ||
| CY | 16.01.2013 | ||
| CZ | 16.01.2013 | ||
| DK | 16.01.2013 | ||
| EE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| HR | 16.01.2013 | ||
| IT | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| LV | 16.01.2013 | ||
| MC | 16.01.2013 | ||
| MK | 16.01.2013 | ||
| MT | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| RO | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| SK | 16.01.2013 | ||
| SM | 16.01.2013 | ||
| TR | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| PT | 16.05.2013 | ||
| IE | 08.07.2013 | ||
| LU | 08.07.2013 | ||
| Former [2015/32] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| CY | 16.01.2013 | ||
| CZ | 16.01.2013 | ||
| DK | 16.01.2013 | ||
| EE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| HR | 16.01.2013 | ||
| IT | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| LV | 16.01.2013 | ||
| MC | 16.01.2013 | ||
| MK | 16.01.2013 | ||
| MT | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| RO | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| SK | 16.01.2013 | ||
| SM | 16.01.2013 | ||
| TR | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| PT | 16.05.2013 | ||
| IE | 08.07.2013 | ||
| Former [2015/24] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| CY | 16.01.2013 | ||
| CZ | 16.01.2013 | ||
| DK | 16.01.2013 | ||
| EE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| HR | 16.01.2013 | ||
| IT | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| LV | 16.01.2013 | ||
| MC | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| RO | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| SK | 16.01.2013 | ||
| SM | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| PT | 16.05.2013 | ||
| IE | 08.07.2013 | ||
| Former [2014/33] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| CY | 16.01.2013 | ||
| CZ | 16.01.2013 | ||
| DK | 16.01.2013 | ||
| EE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| HR | 16.01.2013 | ||
| IT | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| LV | 16.01.2013 | ||
| MC | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| RO | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| SK | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| PT | 16.05.2013 | ||
| IE | 08.07.2013 | ||
| Former [2014/14] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| CY | 16.01.2013 | ||
| CZ | 16.01.2013 | ||
| DK | 16.01.2013 | ||
| EE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| HR | 16.01.2013 | ||
| IT | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| LV | 16.01.2013 | ||
| MC | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| RO | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| SK | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| PT | 16.05.2013 | ||
| Former [2014/03] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| CY | 16.01.2013 | ||
| CZ | 16.01.2013 | ||
| DK | 16.01.2013 | ||
| EE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| HR | 16.01.2013 | ||
| IT | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| LV | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| RO | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| SK | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| PT | 16.05.2013 | ||
| Former [2013/52] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| CY | 16.01.2013 | ||
| CZ | 16.01.2013 | ||
| DK | 16.01.2013 | ||
| EE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| HR | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| LV | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| RO | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| SK | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| PT | 16.05.2013 | ||
| Former [2013/49] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| CZ | 16.01.2013 | ||
| DK | 16.01.2013 | ||
| EE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| HR | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| LV | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| RO | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| SK | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| PT | 16.05.2013 | ||
| Former [2013/48] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| DK | 16.01.2013 | ||
| EE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| HR | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| LV | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| PT | 16.05.2013 | ||
| Former [2013/41] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| HR | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| LV | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| PT | 16.05.2013 | ||
| Former [2013/40] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| LV | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| PT | 16.05.2013 | ||
| Former [2013/38] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| LV | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| Former [2013/37] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| FI | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| NL | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| SI | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| GR | 17.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| Former [2013/36] | AT | 16.01.2013 | |
| BE | 16.01.2013 | ||
| LT | 16.01.2013 | ||
| PL | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| ES | 27.04.2013 | ||
| IS | 16.05.2013 | ||
| Former [2013/35] | BE | 16.01.2013 | |
| LT | 16.01.2013 | ||
| SE | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| IS | 16.05.2013 | ||
| Former [2013/34] | LT | 16.01.2013 | |
| SE | 16.01.2013 | ||
| BG | 16.04.2013 | ||
| NO | 16.04.2013 | ||
| IS | 16.05.2013 | ||
| Former [2013/33] | LT | 16.01.2013 | |
| NO | 16.04.2013 | Documents cited: | Search | [A] US2004218586 (KHOURY DAVID J et al.) [A] 1-15 * paragraph [0011] - paragraph [0017] * * paragraph [0036] - paragraph [0040] * | [A] LEE J W ET AL: "Globally-Synchronized Frames for Guaranteed Quality-of-Service in On-Chip Networks", COMPUTER ARCHITECTURE, 2008. ISCA '08. 35TH INTERNATIONAL SYMPOSIUM ON, IEEE, PISCATAWAY, NJ, USA, 21 June 2008 (2008-06-21), pages 89 - 100, XP031281670, ISBN: 978-0-7695-3174-8 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1109/ISCA.2008.31 | [A] TOBIAS BJERREGAARD AND JENS SPARS: "A Router Architecture for Connection-Oriented Service Guarantees in the MANGO Clockless Network-on-Chip", ACM, 2 PENN PLAZA, SUITE 701 - NEW YORK USA ORD, 11 March 2005 (2005-03-11), XP040015727 [A] 1-15 * the whole document * | [A] HOLLSTEIN ET AL: "Advanced hardware/software co-design on reconfigurable network-on-chip based hyper-platforms", COMPUTERS & ELECTRICAL ENGINEERING, XX, XX LNKD- DOI:10.1016/J.COMPELECENG.2007.02.006, vol. 33, no. 4, 16 May 2007 (2007-05-16), pages 310 - 319, XP022080320, ISSN: 0045-7906 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1016/j.compeleceng.2007.02.006 |