EP2435592 - METHOD AND DEVICE FOR THE LIQUID METAL COATING OF FIBERS MADE OF A CERAMIC MATERIAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.08.2018 Database last updated on 17.07.2024 | |
Former | The patent has been granted Status updated on 22.09.2017 | ||
Former | Grant of patent is intended Status updated on 25.05.2017 | ||
Former | Examination is in progress Status updated on 02.12.2016 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): MK | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states Safran Aircraft Engines 2 boulevard du Général Martial Valin 75015 Paris / FR | [2018/28] |
Former [2017/43] | For all designated states Snecma 2 Bld du Général Martial Valin 75015 Paris / FR | ||
Former [2012/14] | For all designated states Snecma 2 Bld du General Martial Valin 75015 Paris / FR | Inventor(s) | 01 /
FRANCHET, Jean-Michel, Patrick, Maurice 49 rue Pajol F-75018 Paris / FR | 02 /
KLEIN, Gilles, Charles, Casimir 42 avenue Vincent Van Gogh F-95540 Mery Sur Oise / FR | 03 /
SANCHEZ, Gérald 1065 Route du Fier Moulin du Collet 74230 Dingy St. Clair / FR | [2012/14] | Representative(s) | Boura, Olivier, et al Cabinet Beau de Loménie Tour Méditerrannée 65 avenue Jules Cantini 13006 Marseille / FR | [N/P] |
Former [2017/43] | Boura, Olivier, et al Cabinet Beau de Loménie 232, avenue du Prado 13008 Marseille / FR | ||
Former [2012/14] | Boura, Olivier, et al Cabinet Beau de Loménie 158, rue de l'Université 75340 Paris Cedex 07 / FR | Application number, filing date | 10723705.9 | 20.04.2010 | [2017/43] | WO2010FR50753 | Priority number, date | FR20090053415 | 25.05.2009 Original published format: FR 0953415 | [2012/14] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2010136687 | Date: | 02.12.2010 | Language: | FR | [2010/48] | Type: | A1 Application with search report | No.: | EP2435592 | Date: | 04.04.2012 | Language: | FR | The application published by WIPO in one of the EPO official languages on 02.12.2010 takes the place of the publication of the European patent application. | [2012/14] | Type: | B1 Patent specification | No.: | EP2435592 | Date: | 25.10.2017 | Language: | FR | [2017/43] | Search report(s) | International search report - published on: | EP | 02.12.2010 | Classification | IPC: | C22C47/04, C04B41/88, C23C2/00 | [2012/14] | CPC: |
C04B41/4584 (EP,US);
C04B41/009 (EP,US);
C04B41/88 (EP,US);
C22C47/04 (EP,US);
C23C2/0035 (EP,US);
C23C2/24 (EP,US);
C23C2/38 (EP,US);
C23C2/524 (EP,US);
B05D2203/30 (US);
B05D2256/00 (US);
B22F2999/00 (EP,US);
C04B2111/00931 (EP,US);
C04B2111/00982 (EP,US)
(-)
| C-Set: |
C04B41/009, C04B14/46 (US,EP);
C04B41/009, C04B14/4693 (US,EP);
C04B41/4584, C04B41/4523, C04B41/5133 (EP,US);
B22F2999/00, C22C47/04, C22B9/221 (US,EP) | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/14] | Extension states | AL | Not yet paid | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR FLÜSSIGMETALLBESCHICHTUNG VON FASERN AUS EINEM KERAMIKMATERIAL | [2012/14] | English: | METHOD AND DEVICE FOR THE LIQUID METAL COATING OF FIBERS MADE OF A CERAMIC MATERIAL | [2012/14] | French: | PROCEDE ET DISPOSITIF D'ENDUCTION METALLIQUE PAR VOIE LIQUIDE DE FIBRES EN MATERIAU CERAMIQUE | [2012/14] | Entry into regional phase | 05.12.2011 | National basic fee paid | 05.12.2011 | Designation fee(s) paid | 05.12.2011 | Examination fee paid | Examination procedure | 05.12.2011 | Amendment by applicant (claims and/or description) | 05.12.2011 | Examination requested [2012/14] | 01.12.2016 | Despatch of a communication from the examining division (Time limit: M04) | 27.03.2017 | Reply to a communication from the examining division | 26.05.2017 | Communication of intention to grant the patent | 18.09.2017 | Fee for grant paid | 18.09.2017 | Fee for publishing/printing paid | 18.09.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 01.12.2016 | Opposition(s) | 26.07.2018 | No opposition filed within time limit [2018/40] | Fees paid | Renewal fee | 26.03.2012 | Renewal fee patent year 03 | 24.04.2013 | Renewal fee patent year 04 | 24.04.2014 | Renewal fee patent year 05 | 27.04.2015 | Renewal fee patent year 06 | 21.03.2016 | Renewal fee patent year 07 | 25.04.2017 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.04.2010 | AT | 25.10.2017 | CY | 25.10.2017 | CZ | 25.10.2017 | DK | 25.10.2017 | EE | 25.10.2017 | ES | 25.10.2017 | FI | 25.10.2017 | HR | 25.10.2017 | LT | 25.10.2017 | LV | 25.10.2017 | MC | 25.10.2017 | MK | 25.10.2017 | MT | 25.10.2017 | NL | 25.10.2017 | PL | 25.10.2017 | PT | 25.10.2017 | RO | 25.10.2017 | SI | 25.10.2017 | SK | 25.10.2017 | SM | 25.10.2017 | TR | 25.10.2017 | BG | 25.01.2018 | NO | 25.01.2018 | GR | 26.01.2018 | IS | 25.02.2018 | IE | 20.04.2018 | LU | 20.04.2018 | BE | 30.04.2018 | CH | 30.04.2018 | LI | 30.04.2018 | [2020/31] |
Former [2020/27] | HU | 20.04.2010 | |
AT | 25.10.2017 | ||
CY | 25.10.2017 | ||
CZ | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
ES | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
MC | 25.10.2017 | ||
MT | 25.10.2017 | ||
NL | 25.10.2017 | ||
PL | 25.10.2017 | ||
PT | 25.10.2017 | ||
RO | 25.10.2017 | ||
SI | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
TR | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
IE | 20.04.2018 | ||
LU | 20.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2020/16] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
CZ | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
ES | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
MC | 25.10.2017 | ||
MT | 25.10.2017 | ||
NL | 25.10.2017 | ||
PL | 25.10.2017 | ||
RO | 25.10.2017 | ||
SI | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
TR | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
IE | 20.04.2018 | ||
LU | 20.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2019/19] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
CZ | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
ES | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
MC | 25.10.2017 | ||
MT | 25.10.2017 | ||
NL | 25.10.2017 | ||
PL | 25.10.2017 | ||
RO | 25.10.2017 | ||
SI | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
IE | 20.04.2018 | ||
LU | 20.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2019/12] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
CZ | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
ES | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
MC | 25.10.2017 | ||
MT | 25.10.2017 | ||
NL | 25.10.2017 | ||
PL | 25.10.2017 | ||
RO | 25.10.2017 | ||
SI | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
LU | 20.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2019/08] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
CZ | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
ES | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
MC | 25.10.2017 | ||
MT | 25.10.2017 | ||
NL | 25.10.2017 | ||
PL | 25.10.2017 | ||
RO | 25.10.2017 | ||
SI | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
LU | 20.04.2018 | ||
Former [2018/52] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
CZ | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
ES | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
MC | 25.10.2017 | ||
MT | 25.10.2017 | ||
NL | 25.10.2017 | ||
PL | 25.10.2017 | ||
RO | 25.10.2017 | ||
SI | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2018/43] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
CZ | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
ES | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
MT | 25.10.2017 | ||
NL | 25.10.2017 | ||
PL | 25.10.2017 | ||
RO | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2018/40] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
CZ | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
ES | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
NL | 25.10.2017 | ||
PL | 25.10.2017 | ||
RO | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2018/37] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
CZ | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
ES | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
NL | 25.10.2017 | ||
PL | 25.10.2017 | ||
SK | 25.10.2017 | ||
SM | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2018/35] | AT | 25.10.2017 | |
CY | 25.10.2017 | ||
CZ | 25.10.2017 | ||
DK | 25.10.2017 | ||
EE | 25.10.2017 | ||
ES | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
NL | 25.10.2017 | ||
SK | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2018/24] | AT | 25.10.2017 | |
ES | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
LV | 25.10.2017 | ||
NL | 25.10.2017 | ||
BG | 25.01.2018 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2018/23] | AT | 25.10.2017 | |
ES | 25.10.2017 | ||
FI | 25.10.2017 | ||
HR | 25.10.2017 | ||
LT | 25.10.2017 | ||
NL | 25.10.2017 | ||
NO | 25.01.2018 | ||
GR | 26.01.2018 | ||
IS | 25.02.2018 | ||
Former [2018/22] | ES | 25.10.2017 | |
FI | 25.10.2017 | ||
LT | 25.10.2017 | ||
NL | 25.10.2017 | ||
NO | 25.01.2018 | ||
Former [2018/17] | NL | 25.10.2017 | Cited in | International search | [XDA]EP0931846 (SNECMA [FR]) [XD] 7,8 * abstract * * paragraphs [0039] - [0042] - [0044] * * figures 1-3 * [A] 1-6; | [A]EP1995342 (SNECMA [FR]) [A] 1-8 * claim 1 ** paragraphs [0006] , [0013] * |