EP2443086 - METHOD FOR THE PRODUCTION OF NITRILE COMPOUNDS FROM ETHYLENICALLY-UNSATURATED COMPOUNDS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.11.2014 Database last updated on 06.07.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states Invista Technologies S.à.r.l. Zweigniederlassung St. Gallen Kreuzackerstrasse 9 9000 St. Gallen / CH | [2014/32] |
Former [2012/17] | For all designated states Rhodia Opérations 40, rue de La Haie-Coq 93306 Aubervilliers / FR | Inventor(s) | 01 /
MASTROIANNI, Sergio 39 rue Félix Jacquier F-69006 Lyon / FR | 02 /
PRINGLE, Paul 18 Vyvyan Terrace Clifton Bristol, Wiltshire BS8 3DG / GB | 03 /
GARLAND, Michael 39 Palairet Close Bradford-On-Avon, Wiltshire BA15 1UT / GB | 04 /
HOPEWELL, Jonathan Boyne Hill House Chapelthorpe Wakefield, Yorkshire WF4 3JH / GB | [2013/37] |
Former [2012/17] | 01 /
MASTROIANNI, Sergio 39 rue Félix Jacquier F-69006 Lyon / FR | ||
02 /
PRINGLE, Paul 18 Vyvyan Terrace Clifton Bristol Wiltshire BS8 3DG / GB | |||
03 /
GARLAND, Michael 39 Palairet Close Bradford-On-Avon Wiltshire BA15 1UT / GB | |||
04 /
HOPEWELL, Jonathan Boyne Hill House Chapelthorpe Wakefield Yorkshire WF4 3JH / GB | Representative(s) | Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | [2014/32] |
Former [2012/17] | Chatelan, Florence Anne, et al Rhodia Services Direction Propriété Industrielle -C.R.T.L.- 85, av. des Frères Perret 69192 Saint-Fons Cedex / FR | Application number, filing date | 10724794.2 | 07.06.2010 | WO2010EP57922 | Priority number, date | FR20090054015 | 16.06.2009 Original published format: FR 0954015 | [2012/17] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2010145960 | Date: | 23.12.2010 | Language: | FR | [2010/51] | Type: | A1 Application with search report | No.: | EP2443086 | Date: | 25.04.2012 | Language: | FR | The application published by WIPO in one of the EPO official languages on 23.12.2010 takes the place of the publication of the European patent application. | [2012/17] | Type: | B1 Patent specification | No.: | EP2443086 | Date: | 22.01.2014 | Language: | FR | [2014/04] | Search report(s) | International search report - published on: | EP | 23.12.2010 | Classification | IPC: | C07C253/10, C07C255/01 | [2012/17] | CPC: |
C07C253/10 (EP,KR,US);
B01J31/12 (KR);
C07B61/00 (KR);
C07C255/01 (KR)
| C-Set: |
C07C253/10, C07C255/04 (EP,US);
C07C253/10, C07C255/07 (US,EP) | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/17] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON NITRILVERBINDUNGEN AUS ETHYLENISCH UNGESÄTTIGTEN VERBINDUNGEN | [2012/17] | English: | METHOD FOR THE PRODUCTION OF NITRILE COMPOUNDS FROM ETHYLENICALLY-UNSATURATED COMPOUNDS | [2012/17] | French: | PROCEDE DE FABRICATION DE COMPOSES NITRILES A PARTIR DE COMPOSES A INSATURATION ETHYLENIQUE | [2012/17] | Entry into regional phase | 09.12.2011 | National basic fee paid | 09.12.2011 | Designation fee(s) paid | 09.12.2011 | Examination fee paid | Examination procedure | 09.12.2011 | Examination requested [2012/17] | 17.07.2012 | Amendment by applicant (claims and/or description) | 06.11.2012 | Despatch of a communication from the examining division (Time limit: M06) | 03.05.2013 | Reply to a communication from the examining division | 15.08.2013 | Communication of intention to grant the patent | 06.12.2013 | Fee for grant paid | 06.12.2013 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.11.2012 | Opposition(s) | 23.10.2014 | No opposition filed within time limit [2015/01] | Fees paid | Renewal fee | 14.06.2012 | Renewal fee patent year 03 | 10.06.2013 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.06.2010 | AL | 22.01.2014 | AT | 22.01.2014 | BG | 22.01.2014 | CY | 22.01.2014 | CZ | 22.01.2014 | DK | 22.01.2014 | EE | 22.01.2014 | ES | 22.01.2014 | FI | 22.01.2014 | HR | 22.01.2014 | IT | 22.01.2014 | LT | 22.01.2014 | LV | 22.01.2014 | MC | 22.01.2014 | MK | 22.01.2014 | MT | 22.01.2014 | PL | 22.01.2014 | RO | 22.01.2014 | SE | 22.01.2014 | SI | 22.01.2014 | SK | 22.01.2014 | SM | 22.01.2014 | TR | 22.01.2014 | NO | 22.04.2014 | GR | 23.04.2014 | IS | 22.05.2014 | PT | 22.05.2014 | IE | 07.06.2014 | LU | 07.06.2014 | CH | 30.06.2014 | LI | 30.06.2014 | [2018/46] |
Former [2018/30] | HU | 07.06.2010 | |
AT | 22.01.2014 | ||
BG | 22.01.2014 | ||
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
IT | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
MC | 22.01.2014 | ||
MK | 22.01.2014 | ||
MT | 22.01.2014 | ||
PL | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
SI | 22.01.2014 | ||
SK | 22.01.2014 | ||
SM | 22.01.2014 | ||
TR | 22.01.2014 | ||
NO | 22.04.2014 | ||
GR | 23.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
IE | 07.06.2014 | ||
LU | 07.06.2014 | ||
CH | 30.06.2014 | ||
LI | 30.06.2014 | ||
Former [2016/33] | HU | 07.06.2010 | |
AT | 22.01.2014 | ||
BG | 22.01.2014 | ||
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
IT | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
MC | 22.01.2014 | ||
MT | 22.01.2014 | ||
PL | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
SI | 22.01.2014 | ||
SK | 22.01.2014 | ||
SM | 22.01.2014 | ||
TR | 22.01.2014 | ||
NO | 22.04.2014 | ||
GR | 23.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
IE | 07.06.2014 | ||
LU | 07.06.2014 | ||
CH | 30.06.2014 | ||
LI | 30.06.2014 | ||
Former [2016/32] | HU | 07.06.2010 | |
AT | 22.01.2014 | ||
BG | 22.01.2014 | ||
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
IT | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
MC | 22.01.2014 | ||
MT | 22.01.2014 | ||
PL | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
SI | 22.01.2014 | ||
SK | 22.01.2014 | ||
SM | 22.01.2014 | ||
NO | 22.04.2014 | ||
GR | 23.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
IE | 07.06.2014 | ||
LU | 07.06.2014 | ||
CH | 30.06.2014 | ||
LI | 30.06.2014 | ||
Former [2016/29] | AT | 22.01.2014 | |
BG | 22.01.2014 | ||
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
IT | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
MC | 22.01.2014 | ||
MT | 22.01.2014 | ||
PL | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
SI | 22.01.2014 | ||
SK | 22.01.2014 | ||
SM | 22.01.2014 | ||
NO | 22.04.2014 | ||
GR | 23.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
IE | 07.06.2014 | ||
LU | 07.06.2014 | ||
CH | 30.06.2014 | ||
LI | 30.06.2014 | ||
Former [2016/28] | AT | 22.01.2014 | |
BG | 22.01.2014 | ||
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
MC | 22.01.2014 | ||
MT | 22.01.2014 | ||
PL | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
SI | 22.01.2014 | ||
SK | 22.01.2014 | ||
SM | 22.01.2014 | ||
NO | 22.04.2014 | ||
GR | 23.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
IE | 07.06.2014 | ||
LU | 07.06.2014 | ||
CH | 30.06.2014 | ||
LI | 30.06.2014 | ||
Former [2016/22] | AT | 22.01.2014 | |
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
MC | 22.01.2014 | ||
MT | 22.01.2014 | ||
PL | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
SI | 22.01.2014 | ||
SK | 22.01.2014 | ||
SM | 22.01.2014 | ||
NO | 22.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
IE | 07.06.2014 | ||
LU | 07.06.2014 | ||
CH | 30.06.2014 | ||
LI | 30.06.2014 | ||
Former [2016/16] | AT | 22.01.2014 | |
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
MC | 22.01.2014 | ||
MT | 22.01.2014 | ||
PL | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
SI | 22.01.2014 | ||
SK | 22.01.2014 | ||
NO | 22.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
IE | 07.06.2014 | ||
LU | 07.06.2014 | ||
CH | 30.06.2014 | ||
LI | 30.06.2014 | ||
Former [2015/24] | AT | 22.01.2014 | |
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
MC | 22.01.2014 | ||
PL | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
SI | 22.01.2014 | ||
SK | 22.01.2014 | ||
NO | 22.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
IE | 07.06.2014 | ||
LU | 07.06.2014 | ||
CH | 30.06.2014 | ||
LI | 30.06.2014 | ||
Former [2015/21] | AT | 22.01.2014 | |
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
MC | 22.01.2014 | ||
PL | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
SK | 22.01.2014 | ||
NO | 22.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
IE | 07.06.2014 | ||
LU | 07.06.2014 | ||
CH | 30.06.2014 | ||
LI | 30.06.2014 | ||
Former [2015/20] | AT | 22.01.2014 | |
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
MC | 22.01.2014 | ||
PL | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
SK | 22.01.2014 | ||
NO | 22.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
LU | 07.06.2014 | ||
CH | 30.06.2014 | ||
LI | 30.06.2014 | ||
Former [2015/09] | AT | 22.01.2014 | |
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
MC | 22.01.2014 | ||
PL | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
SK | 22.01.2014 | ||
NO | 22.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
LU | 07.06.2014 | ||
Former [2014/50] | AT | 22.01.2014 | |
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
PL | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
SK | 22.01.2014 | ||
NO | 22.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
Former [2014/49] | AT | 22.01.2014 | |
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
RO | 22.01.2014 | ||
SE | 22.01.2014 | ||
NO | 22.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
Former [2014/48] | AT | 22.01.2014 | |
CY | 22.01.2014 | ||
CZ | 22.01.2014 | ||
DK | 22.01.2014 | ||
EE | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
SE | 22.01.2014 | ||
NO | 22.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
Former [2014/41] | AT | 22.01.2014 | |
CY | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
HR | 22.01.2014 | ||
LT | 22.01.2014 | ||
LV | 22.01.2014 | ||
SE | 22.01.2014 | ||
NO | 22.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
Former [2014/37] | AT | 22.01.2014 | |
CY | 22.01.2014 | ||
ES | 22.01.2014 | ||
FI | 22.01.2014 | ||
LT | 22.01.2014 | ||
SE | 22.01.2014 | ||
NO | 22.04.2014 | ||
IS | 22.05.2014 | ||
PT | 22.05.2014 | ||
Former [2014/36] | LT | 22.01.2014 | |
NO | 22.04.2014 | ||
IS | 22.05.2014 | Cited in | International search | [XY]US5840647 (PUCKETTE THOMAS ALLEN [US], et al) [X] 1,2,6,7,16 * column 2, line 11 - line 23; claims 1-7 * [Y] 12; | [X]US2004054211 (TOLLESON GINETTE STRUCK [US], et al) [X] 1,2,6,7,16 * paragraphs [0002] , [0003] , [0007] , [0008]; claims 1,2 *; | [A]DE19740180 (BASF AG [DE]) [A] 1-16 * the whole document *; | [YA]GB1178950 (DU PONT [US]) [Y] 12 * the whole document * [A] 1-11,13-16; | [AD] - DOWNING ET AL, "General Routes to Alkyl Phosphatrioxaadamante Ligands", ORGANOMETALLICS, (20080611), vol. 27, pages 3216 - 3224, XP002561941 [AD] 1-16 * the whole document * DOI: http://dx.doi.org/10.1021/om800141y | [AD] - M. CARREIRA ET AL., "Anatomy of Phobanes. Diastereoselective Synthesis of the Three Isomers of n-Butylphobane and a Comparison of their Donor Properties", JOURNAL OF THE AMERICAN CHEMICAL SOCIETY., (20090130), vol. 131, no. 8, ISSN 0002-7863, pages 3078 - 3092, XP002601663 [AD] 1,3,5-16 * scheme 8; page 3083, column r, paragraph l - page 3084, column l, paragraph 1 * * page 3089, column r, paragraph l - page 3090, column l, paragraph 2 * DOI: http://dx.doi.org/10.1021/JA808807S | by applicant | FR1599764 | GB1178950 | US2571099 | US2008081759 | FR2926816 | FR2937321 | FR2941455 | - DOWNING ET AL., ORGANOMETALLICS, (2008), vol. 27, no. 13, pages 3216 - 3224 | - G.A. OLAH, Friedel-Crafts and related Reactions, pages 191 - 197 | - M. CARREIRA; M. CHARERNSUK; M. EBERHARD; N. FEY; R. VAN GINKEL; A. HAMILTON; W. P. MUL; A. G. ORPEN; H. PHETMUNG; P. G. PRINGLE, J. AM. CHEM. SOC, (2009), vol. 131, pages 3078 - 3092 |