EP2462273 - WATER-BEARING HOUSEHOLD APPLIANCE HAVING A SHELL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.01.2021 Database last updated on 03.08.2024 | |
Former | The patent has been granted Status updated on 24.01.2020 | ||
Former | Grant of patent is intended Status updated on 26.09.2019 | ||
Former | Examination is in progress Status updated on 25.08.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states BSH Hausgeräte GmbH Carl-Wery-Strasse 34 81739 München / DE | [2015/13] |
Former [2012/24] | For all designated states BSH Bosch und Siemens Hausgeräte GmbH Carl-Wery-Strasse 34 81739 München / DE | Inventor(s) | 01 /
FÖRSTERLING, Klaus Heilmaierstrasse 22 83123 Amerang / DE | 02 /
GEYER, Johannes Bürkelweg 44 85540 Haar / DE | 03 /
GREGER, Thoralf Gaißacherstr. 25 81371 München / DE | 04 /
SABALAT, Andre Rathenower Str. 7 10559 Berlin / DE | 05 /
SCHULZE, Ingo Ulmenallee 7 16341 Panketal / DE | [2012/26] |
Former [2012/24] | 01 /
FÖRSTERLING, Klaus Chiemgaustraße 40 83552 Evenhausen / DE | ||
02 /
GEYER, Johannes Bürkelweg 44 85540 Haar / DE | |||
03 /
GREGER, Thoralf Gaißacherstr. 25 81371 München / DE | |||
04 /
SABALAT, Andre Rathenower Str. 7 10559 Berlin / DE | |||
05 /
SCHULZE, Ingo Ulmenallee 7 16341 Panketal / DE | Representative(s) | (deleted) | [2012/24] | Application number, filing date | 10736736.9 | 29.07.2010 | [2020/09] | WO2010EP60992 | Priority number, date | DE20091028185 | 03.08.2009 Original published format: DE102009028185 | [2012/24] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2011015507 | Date: | 10.02.2011 | Language: | DE | [2011/06] | Type: | A1 Application with search report | No.: | EP2462273 | Date: | 13.06.2012 | Language: | DE | The application published by WIPO in one of the EPO official languages on 10.02.2011 takes the place of the publication of the European patent application. | [2012/24] | Type: | B1 Patent specification | No.: | EP2462273 | Date: | 26.02.2020 | Language: | DE | [2020/09] | Search report(s) | International search report - published on: | EP | 10.02.2011 | Classification | IPC: | D06F39/02, A47L15/44 | [2012/24] | CPC: |
D06F39/022 (EP,US);
A47L15/4418 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/24] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | WASSERFÜHRENDES HAUSGERÄT MIT EINER SCHALE | [2012/24] | English: | WATER-BEARING HOUSEHOLD APPLIANCE HAVING A SHELL | [2012/24] | French: | APPAREIL MÉNAGER VÉHICULANT DE L'EAU DOTÉ D'UNE COQUE | [2012/24] | Entry into regional phase | 05.03.2012 | National basic fee paid | 05.03.2012 | Designation fee(s) paid | 05.03.2012 | Examination fee paid | Examination procedure | 01.06.2011 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 05.03.2012 | Examination requested [2012/24] | 14.09.2012 | Amendment by applicant (claims and/or description) | 29.08.2017 | Despatch of a communication from the examining division (Time limit: M04) | 21.12.2017 | Reply to a communication from the examining division | 28.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 15.07.2019 | Reply to a communication from the examining division | 27.09.2019 | Communication of intention to grant the patent | 14.01.2020 | Fee for grant paid | 14.01.2020 | Fee for publishing/printing paid | 14.01.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.08.2017 | Opposition(s) | 27.11.2020 | No opposition filed within time limit [2021/05] | Fees paid | Renewal fee | 31.07.2012 | Renewal fee patent year 03 | 31.07.2013 | Renewal fee patent year 04 | 31.07.2014 | Renewal fee patent year 05 | 31.07.2015 | Renewal fee patent year 06 | 01.08.2016 | Renewal fee patent year 07 | 31.07.2017 | Renewal fee patent year 08 | 31.07.2018 | Renewal fee patent year 09 | 31.07.2019 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.07.2010 | AL | 26.02.2020 | CY | 26.02.2020 | CZ | 26.02.2020 | DK | 26.02.2020 | EE | 26.02.2020 | ES | 26.02.2020 | FI | 26.02.2020 | HR | 26.02.2020 | IT | 26.02.2020 | LT | 26.02.2020 | LV | 26.02.2020 | MC | 26.02.2020 | MK | 26.02.2020 | MT | 26.02.2020 | NL | 26.02.2020 | PL | 26.02.2020 | RO | 26.02.2020 | SE | 26.02.2020 | SI | 26.02.2020 | SK | 26.02.2020 | SM | 26.02.2020 | TR | 26.02.2020 | BG | 26.05.2020 | NO | 26.05.2020 | GR | 27.05.2020 | IS | 26.06.2020 | PT | 19.07.2020 | AT | 29.07.2020 | GB | 29.07.2020 | IE | 29.07.2020 | LU | 29.07.2020 | BE | 31.07.2020 | CH | 31.07.2020 | FR | 31.07.2020 | LI | 31.07.2020 | [2022/31] |
Former [2022/30] | HU | 29.07.2010 | |
AL | 26.02.2020 | ||
CY | 26.02.2020 | ||
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
MT | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
TR | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
AT | 29.07.2020 | ||
GB | 29.07.2020 | ||
IE | 29.07.2020 | ||
LU | 29.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2022/27] | HU | 29.07.2010 | |
CY | 26.02.2020 | ||
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
MT | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
TR | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
AT | 29.07.2020 | ||
GB | 29.07.2020 | ||
IE | 29.07.2020 | ||
LU | 29.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2022/26] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
TR | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
AT | 29.07.2020 | ||
GB | 29.07.2020 | ||
IE | 29.07.2020 | ||
LU | 29.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/47] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
AT | 29.07.2020 | ||
GB | 29.07.2020 | ||
IE | 29.07.2020 | ||
LU | 29.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/37] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
GB | 29.07.2020 | ||
IE | 29.07.2020 | ||
LU | 29.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/23] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
GB | 29.07.2020 | ||
LU | 29.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
FR | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/22] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
GB | 29.07.2020 | ||
LU | 29.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/20] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
LU | 29.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/13] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2021/10] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/50] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/49] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/48] | DK | 26.02.2020 | |
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
SE | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/47] | DK | 26.02.2020 | |
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
SE | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/45] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
SE | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/40] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
SE | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/39] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
SE | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
Former [2020/38] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
SE | 26.02.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
Former [2020/37] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
SE | 26.02.2020 | ||
NO | 26.05.2020 | ||
Former [2020/35] | FI | 26.02.2020 | |
NO | 26.05.2020 | Cited in | International search | [XAYI]US2009095750 (VITAN CRAIG ROBERT [US], et al) [X] 1,10 * paragraphs [0012] - [0017] * * figures 27-30 * * figures 1-3 * [A] 2-4 [Y] 11 [I] 8,9,12-15; | [YA]EP0379950 (MIELE & CIE [DE]) [Y] 11 * page 2, line 43 - page 3, line 20 * * page 5, line 26 - page 5, line 49 * * figures 1-4 * [A] 1,5-10,12-15; | [AD]EP1884584 (INDESIT CO SPA [IT]) [AD] 1 * paragraph [0035]; figures 1-6; claim 1 *; | [A]DE102007023065 (BSH BOSCH SIEMENS HAUSGERAETE [DE]) [A] 1 * paragraphs [0016] , [0019]; figures 1,2 *; | [A]US5675994 (GWEON TAE SOUNG [KR]) [A] 1 * column 2, line 57 - column 3, line 31 * * figures 1-3 *; | [XP]DE102009030330 (WHIRLPOOL CO [US]) [XP] 1,5,6 * paragraphs [0024] , [0044] - [0045]; figures 1,4,5 *; | [AP]WO2010040674 (BSH BOSCH SIEMENS HAUSGERAETE [DE], et al) [AP] 1 * page 7, line 18 - page 9, line 40 * * figures 1-3 * | Examination | DE102006002400 | EP2048276 | by applicant | EP1884584 |