blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2437188

EP2437188 - LOOSE COUPLING METHOD BETWEEN A STRESS ANALYSIS SYSTEM AND A CONVENTIONAL RESERVOIR SIMULATOR [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  01.12.2017
Database last updated on 03.09.2024
FormerRequest for examination was made
Status updated on  08.08.2017
Most recent event   Tooltip01.12.2017Application deemed to be withdrawnpublished on 03.01.2018  [2018/01]
Applicant(s)For all designated states
Faculdades Católicas, Sociedade Civil Mantenedora da PUC Rio
Rua Marquês de são Vicente 225
Gávea Cep: 22453-900 Rio de Janeiro - RJ / BR
[2012/14]
Inventor(s)01 / BARRETO DA FONTURA, Sergio Augusto
Rua Vice-Governador Rubens Berardo 125
ap. 301, bloco 2
Gávea
Rio de Janeiro, RJ / BR
02 / INOUE, Nelson
Rua das Dálias 66
ap. 203
Vila Valqueire
Rio de Janeiro, RJ / BR
 [2012/14]
Representative(s)Pulieri, Gianluca Antonio, et al
Jacobacci & Partners S.p.A.
Piazza della Vittoria, 11
25122 Brescia / IT
[N/P]
Former [2012/14]Pulieri, Gianluca Antonio, et al
Jacobacci & Partners S.p.A. Piazza della Vittoria, 11
I-25122 Brescia / IT
Application number, filing date10757954.231.03.2010
WO2010BR00096
Priority number, dateBR2009PI0090831.03.2009         Original published format: BR PI0900908
[2012/14]
Filing languagePT
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2010111758
Date:07.10.2010
Language:PT
[2010/40]
Type: A1 Application with search report 
No.:EP2437188
Date:04.04.2012
Language:EN
[2012/14]
Search report(s)International search report - published on:BR07.10.2010
(Supplementary) European search report - dispatched on:EP28.11.2016
ClassificationIPC:G06F19/00, G06F17/13, G01V99/00
[2016/52]
CPC:
G01V20/00 (EP,US); G01V11/00 (US); G06F30/23 (EP,US);
G01V2210/66 (EP,US); G06F2111/10 (EP,US)
Former IPC [2012/14]G06F19/00, G06F17/13
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2012/14]
TitleGerman:LOSES KOPPLUNGSVERFAHREN ZWISCHEN EINEM BELASTUNGSANALYSESYSTEM UND EINEM HERKÖMMLICHEN RESERVOIRSIMULATOR[2012/14]
English:LOOSE COUPLING METHOD BETWEEN A STRESS ANALYSIS SYSTEM AND A CONVENTIONAL RESERVOIR SIMULATOR[2012/14]
French:PROCÉDÉ D'ACCOUPLEMENT PARTIEL ENTRE UN SYSTÈME D'ANALYSE DE TENSIONS ET UN SIMULATEUR CLASSIQUE DE RÉSERVOIRS[2012/14]
Entry into regional phase28.10.2011Translation filed 
04.10.2011National basic fee paid 
04.10.2011Search fee paid 
04.10.2011Designation fee(s) paid 
04.10.2011Examination fee paid 
Examination procedure04.10.2011Examination requested  [2012/14]
27.06.2017Application deemed to be withdrawn, date of legal effect  [2018/01]
09.08.2017Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time  [2018/01]
Fees paidRenewal fee
23.01.2012Renewal fee patent year 03
11.03.2013Renewal fee patent year 04
28.03.2014Renewal fee patent year 05
25.03.2015Renewal fee patent year 06
04.03.2016Renewal fee patent year 07
24.01.2017Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XI]  - Nelson Inoue, "EXPLICITCOUPLINGBETWEENFLOWANDGEOMECHANICAL SIMULATORS", (20090101), URL: https://www.researchgate.net/profile/Sergio_Fontoura/publication/235794061_EXPLICIT_COUPLING_BETWEEN_FLOW_AND_GEOMECHANICAL_SIMULATORS/links/09e415139179170034000000.pdf, (20161121), XP055321307 [X] 1,4,5 * page 2 * * page 4 * [I] 2,3
 [I]  - MAINGUY M ET AL, "Coupling Fluid Flow and Rock Mechanics: Formulations of the Partial Coupling between Reservoir and Geomechanical Simulators", OIL & GAS SCIENCE & TECHNOLOGY: REVUE DE L'INSTITUT FRANCAIS DU PETROLE, EDITIONS TECHNIP. PARIS, FR, (20020101), vol. 57, no. 4, ISSN 1294-4475, pages 355 - 367, XP002388415 [I] 1-5 * page 357, Equ. 1-6; page 359, Equ. 18; page 360, section 4.1 and 4.2 with Equ. 21, 27 and 31; page 365 line 3; page 364-365, section 5.3; *
 [I]  - ANTONIN SETTARI ET AL, "A Coupled Reservoir and Geomechanical Simulation System", SPE JOURNAL, US, (19980901), vol. 3, no. 03, doi:10.2118/50939-PA, ISSN 1086-055X, pages 219 - 226, XP055321319 [I] 1-5 * page 221-222, Section "The Coupling method"; *

DOI:   http://dx.doi.org/10.2118/50939-PA
 [A]  - SETTARI A ET AL, "Advances in Coupled Geomechanical and Reservoir Modeling With Applications to Reservoir Compaction", SPE JOURNAL,, (20010901), ISSN 0036-1844, pages 334 - 342, XP007910685 [A] 3 * page 335 *
 [A]  - Pierre Samier ET AL, "A Practical Iterative Scheme for Coupling Geomechanics With Reservoir Simulation", SPE Reservoir Evaluation & Engineering, doi:10.2118/107077-PA, (20081001), pages 892 - 901, URL: https://www.onepetro.org/download/journal-paper/SPE-107077-PA?id=journal-paper/SPE-107077-PA, (20161121), XP055321343 [A] 1-5 * figure 1 *

DOI:   http://dx.doi.org/10.2118/107077-PA
 [A]  - CHIN L Y ET AL, "Iterative Coupled Analysis of Geomechanics and Fluid Flow for Rock Compaction in Reservoir Simulation", OIL & GAS SCIENCE AND TECHNOLOGY - REVUE DE L'INSTITUT FRANCAISDU PETROLE, EDITIONS TECHNIP, PARIS, FR, vol. 57, no. 5, doi:10.2516/OGST:2002032, ISSN 0020-2274, (20020901), pages 485 - 497, (20061201), XP008167472 [A] 1-5 * Equ. 1-10; page 489, section "Implementation of the Iterative Coupled Procedure" *

DOI:   http://dx.doi.org/10.2516/ogst:2002032
 [A]  - SETTARI A ET AL, "THE ROLE OF GEOMECHANICS IN INTEGRATED RESERVOIR MODELING", THE LEADING EDGE, SOCIETY OF EXPLORATION GEOPHYSICISTS, US, (20070501), doi:10.1190/1.2737102, ISSN 1070-485X, pages 622 - 627, XP001540531 [A] 1-5 * page 6, Section "Fully Coupled Geomechanics and Reservoir Simulation"; Equ. 13, 14-17 *

DOI:   http://dx.doi.org/10.1190/1.2737102
International search[A]US7177764  (STONE TERRY WAYNE [GB]);
 [A]US7386431  (SIEBRITS EDUARD [US], et al);
 [A]WO2008070526  (CHEVRON USA INC [US], et al);
 [A]  - LONGUEMARE, P. ET AL., "Geomechanics in Resevoir Simulation: Overview of Coupling Methods and Field Case Study", OIL & GAS SCIENCE & TECHNOLOGY -REV. IFP, (2002), vol. 57, no. 5, pages 471 - 483, XP008167474

DOI:   http://dx.doi.org/10.2516/ogst:2002031
 [A]  - CHIN, L. Y ET AL., "Iterative Coupled Analysis of Geomechanics and Fluid Flow for Rock Compaction in Reservoir Simulation", OIL & GAS SCIENCE & TECHNOLOGY -REV. IFP, (2002), vol. 57, no. 5, pages 485 - 497, XP008167472

DOI:   http://dx.doi.org/10.2516/ogst:2002032
 [A]  - SETTARI, A ET AL., "Numerical Techniquies Used for Predicting Subsidience Due to Gas Extraction in the North Adriatic Sea", PETROLEUM SCIENCE AND TECHNOLOGY, (2008), vol. 26, pages 1205 - 1223, XP008167480

DOI:   http://dx.doi.org/10.1080/10916460701833889
by applicantUS7177764
 US7386431
 WO2008070526
    - M. MAINGUY, P. LONGUEMARE, "Coupling Fluid Flow and Rock Mechanics: Formulations of the Partial Coupling Between Geomechanical and Reservoir Simulators", OIL & GAS SCIENCE AND TECHNOLOGY, (2002), vol. 57, no. 4, pages 355 - 367, XP002388415
    - M. A. BIOT, "General Theory of Three-Dimensional Consolidation", J. APPL. PHYS., (1940), vol. 12, pages 155 - 164
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.