EP2438527 - METHOD AND SYSTEM FOR UPDATING A MEDICAL DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.03.2019 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 30.03.2018 | ||
Former | Grant of patent is intended Status updated on 29.11.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Abbott Diabetes Care, Inc. 1360 South Loop Road Alameda, CA 94502 / US | [2018/18] |
Former [2012/15] | For all designated states Abbott Diabetes Care, Inc. 1360 South Loop Road Alameda, CA 94502 / US | Inventor(s) | 01 /
NEKOOMARAM, Saeed 3417 Kettering Court San Mateo CA 94403 / US | 02 /
CROUTHER, Nathan, Christopher 170 King Street 1009 San Francisco CA 94107 / US | [2012/15] | Representative(s) | Kazi, Ilya, et al Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [N/P] |
Former [2014/41] | Kazi, Ilya, et al Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | ||
Former [2013/19] | Duxbury, Stephen, et al Arnold & Siedsma Pettenkoferstrasse 37 80336 München / DE | ||
Former [2012/15] | Waldren, Robin Michael Marks & Clerk LLP 90 Long Acre London WC2E 9RA / GB | Application number, filing date | 10784214.8 | 04.06.2010 | [2018/18] | WO2010US37547 | Priority number, date | US20090184234P | 04.06.2009 Original published format: US 184234 P | [2012/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010141922 | Date: | 09.12.2010 | Language: | EN | [2010/49] | Type: | A1 Application with search report | No.: | EP2438527 | Date: | 11.04.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 09.12.2010 takes the place of the publication of the European patent application. | [2012/15] | Type: | B1 Patent specification | No.: | EP2438527 | Date: | 02.05.2018 | Language: | EN | [2018/18] | Search report(s) | International search report - published on: | US | 09.12.2010 | (Supplementary) European search report - dispatched on: | EP | 27.06.2014 | Classification | IPC: | G06F19/00, G06F9/44, G06F9/445, G06F11/10, G06F11/14, H03M13/09 | [2014/31] | CPC: |
G16H40/40 (EP,US);
G06F11/1004 (EP,US);
G06F11/1433 (EP,US);
G06F8/61 (US);
G06F8/65 (EP,US);
G06F8/654 (EP,US);
G06F8/71 (US);
G08B21/182 (US);
G08B29/24 (US);
H03M13/09 (US);
H04L67/10 (US);
H04W12/106 (EP,US);
H04W12/35 (EP,US)
(-)
|
Former IPC [2012/15] | G06F15/16 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/15] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN UND SYSTEM ZUR AKTUALISIERUNG EINER MEDIZINISCHEN VORRICHTUNG | [2012/15] | English: | METHOD AND SYSTEM FOR UPDATING A MEDICAL DEVICE | [2012/15] | French: | PROCÉDÉ ET SYSTÈME DE MISE À JOUR D'UN DISPOSITIF MÉDICAL | [2012/15] | Entry into regional phase | 08.12.2011 | National basic fee paid | 08.12.2011 | Search fee paid | 08.12.2011 | Designation fee(s) paid | 08.12.2011 | Examination fee paid | Examination procedure | 08.12.2011 | Examination requested [2012/15] | 06.01.2015 | Amendment by applicant (claims and/or description) | 30.03.2016 | Despatch of a communication from the examining division (Time limit: M04) | 01.08.2016 | Reply to a communication from the examining division | 25.10.2017 | Cancellation of oral proceeding that was planned for 01.12.2017 | 30.11.2017 | Communication of intention to grant the patent | 01.12.2017 | Date of oral proceedings (cancelled) | 26.03.2018 | Fee for grant paid | 26.03.2018 | Fee for publishing/printing paid | 26.03.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 30.03.2016 | Opposition(s) | 05.02.2019 | No opposition filed within time limit [2019/15] | Fees paid | Renewal fee | 31.03.2012 | Renewal fee patent year 03 | 31.03.2013 | Renewal fee patent year 04 | 31.03.2014 | Renewal fee patent year 05 | 05.06.2015 | Renewal fee patent year 06 | 31.03.2016 | Renewal fee patent year 07 | 08.06.2017 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.06.2010 | AL | 02.05.2018 | AT | 02.05.2018 | CY | 02.05.2018 | CZ | 02.05.2018 | DK | 02.05.2018 | EE | 02.05.2018 | ES | 02.05.2018 | FI | 02.05.2018 | HR | 02.05.2018 | IT | 02.05.2018 | LT | 02.05.2018 | LV | 02.05.2018 | MC | 02.05.2018 | MK | 02.05.2018 | NL | 02.05.2018 | PL | 02.05.2018 | RO | 02.05.2018 | SE | 02.05.2018 | SI | 02.05.2018 | SK | 02.05.2018 | SM | 02.05.2018 | TR | 02.05.2018 | IE | 04.06.2018 | LU | 04.06.2018 | MT | 04.06.2018 | BE | 30.06.2018 | CH | 30.06.2018 | LI | 30.06.2018 | FR | 02.07.2018 | BG | 02.08.2018 | NO | 02.08.2018 | GR | 03.08.2018 | IS | 02.09.2018 | PT | 03.09.2018 | [2020/33] |
Former [2020/31] | HU | 04.06.2010 | |
AL | 02.05.2018 | ||
AT | 02.05.2018 | ||
CY | 02.05.2018 | ||
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
MK | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
SM | 02.05.2018 | ||
TR | 02.05.2018 | ||
IE | 04.06.2018 | ||
LU | 04.06.2018 | ||
MT | 04.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
FR | 02.07.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2020/28] | HU | 04.06.2010 | |
AL | 02.05.2018 | ||
AT | 02.05.2018 | ||
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
SM | 02.05.2018 | ||
TR | 02.05.2018 | ||
IE | 04.06.2018 | ||
LU | 04.06.2018 | ||
MT | 04.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
FR | 02.07.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2020/16] | AL | 02.05.2018 | |
AT | 02.05.2018 | ||
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
SM | 02.05.2018 | ||
TR | 02.05.2018 | ||
IE | 04.06.2018 | ||
LU | 04.06.2018 | ||
MT | 04.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
FR | 02.07.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2020/08] | AL | 02.05.2018 | |
AT | 02.05.2018 | ||
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
SM | 02.05.2018 | ||
IE | 04.06.2018 | ||
LU | 04.06.2018 | ||
MT | 04.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
FR | 02.07.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/51] | AL | 02.05.2018 | |
AT | 02.05.2018 | ||
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
SM | 02.05.2018 | ||
IE | 04.06.2018 | ||
LU | 04.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
FR | 02.07.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/26] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
SM | 02.05.2018 | ||
IE | 04.06.2018 | ||
LU | 04.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
FR | 02.07.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/23] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SK | 02.05.2018 | ||
SM | 02.05.2018 | ||
IE | 04.06.2018 | ||
LU | 04.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
FR | 02.07.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/21] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SK | 02.05.2018 | ||
SM | 02.05.2018 | ||
IE | 04.06.2018 | ||
LU | 04.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/19] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SK | 02.05.2018 | ||
SM | 02.05.2018 | ||
IE | 04.06.2018 | ||
LU | 04.06.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/17] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SK | 02.05.2018 | ||
SM | 02.05.2018 | ||
LU | 04.06.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/15] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SK | 02.05.2018 | ||
SM | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/11] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SK | 02.05.2018 | ||
SM | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/10] | AT | 02.05.2018 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/09] | DK | 02.05.2018 | |
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/08] | DK | 02.05.2018 | |
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/03] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2018/52] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
Former [2018/51] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
Former [2018/50] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
Former [2018/49] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
LT | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
Former [2018/47] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
LT | 02.05.2018 | ||
NO | 02.08.2018 | Documents cited: | Search | [I]US2003095648 (KAIB THOMAS E [US], et al); | [A]WO2007126948 (HOSPIRA INC [US], et al); | [I]US2009113413 (REINZ MICHAEL [DE]) | International search | [Y]US6445462 (ARITOMI MASANORI [JP]); | [Y]US2003208465 (YURKO GREGORY [US], et al); | [X]US2006173644 (DAI GUANGMING [US], et al); | [A]US2007027506 (STENDER HOLGER [DE], et al); | [Y]US7178141 (PIAZZA WILLIAM JOSEPH [US]); | [A]US2007192140 (GROPPER ADRIAN [US]); | [A]US7321811 (RAWLS-MEEHAN MARTIN B [US]) | Examination | US2008300919 | by applicant | US4545382 | US4711245 | US5262035 | US5262305 | US5264104 | US5320715 | US5356786 | US5509410 | US5543326 | US5593852 | US5601435 | US5628890 | US5820551 | US5822715 | US5899855 | US5918603 | US6071391 | US6103033 | US6120676 | US6121009 | US6121611 | US6134461 | US6143164 | US6144837 | US6161095 | US6175752 | US6270455 | US6284478 | US6299757 | US6338790 | US6377894 | US6461496 | US6503381 | US6514460 | US6514718 | US6540891 | US6560471 | US6579690 | US6591125 | US6592745 | US6600997 | US6605200 | US6605201 | US6616819 | US6618934 | US6650471 | US6654625 | US6676816 | US6730200 | US6736957 | US6746582 | US6749740 | US6764581 | US6773671 | US2004186365 | US6881551 | US6893545 | US2005182306 | US6932892 | US6932894 | US6942518 | US2006025662 | US2006091006 | US7041468 | US7167818 | US2007056858 | US2007068807 | US2007095661 | US2007108048 | US2007199818 | US2007227911 | US2007233013 | US7299082 | US2008066305 | US2008081977 | US2008102441 | US2008148873 | US2008161666 | US2008267823 | US2008278332 | US2009054748 | US2009113413 |