EP2501890 - SWELLABLE CONNECTION SYSTEM AND METHOD OF USING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.05.2015 Database last updated on 16.11.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states Halliburton Energy Services, Inc. P.O. Box 1431 Duncan, OK 73536 / US | [2012/39] | Inventor(s) | 01 /
ABNEY, Laurence, James Brattholen 5 Sandnes 4313 / NO | [2012/39] | Representative(s) | Cottrill, Emily Elizabeth Helen A.A. Thornton & Co. 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2012/39] | Cottrill, Emily Elizabeth Helen A.A. Thornton & Co. 235 High Holborn London WC1V 7LE / GB | Application number, filing date | 10787154.3 | 18.11.2010 | WO2010GB02136 | Priority number, date | US20090622995 | 20.11.2009 Original published format: US 622995 | [2012/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2011061502 | Date: | 26.05.2011 | Language: | EN | [2011/21] | Type: | A2 Application without search report | No.: | EP2501890 | Date: | 26.09.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.05.2011 takes the place of the publication of the European patent application. | [2012/39] | Type: | B1 Patent specification | No.: | EP2501890 | Date: | 02.07.2014 | Language: | EN | [2014/27] | Search report(s) | International search report - published on: | EP | 22.09.2011 | Classification | IPC: | E21B17/02, E21B33/038, E21B33/12, E21B43/013 | [2014/01] | CPC: |
E21B17/04 (EP,US);
E21B33/038 (EP,US);
E21B33/1208 (EP,US);
E21B43/013 (EP,US)
|
Former IPC [2012/39] | E21B17/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | QUELLFÄHIGES VERBINDUNGSSYSTEM UND VERWENDUNGSVERFAHREN DAFÜR | [2014/04] | English: | SWELLABLE CONNECTION SYSTEM AND METHOD OF USING THE SAME | [2012/39] | French: | SYSTÈME DE CONNEXION CAPABLE D'ENFLER ET PROCÉDÉ D'UTILISATION DE CELUI-CI | [2012/39] |
Former [2012/39] | QUELLFÄHIGES VERBINDUNGSSYSTEM UND VERWENDUNGSVERFAHREN DAFÜR | Entry into regional phase | 18.05.2012 | National basic fee paid | 18.05.2012 | Designation fee(s) paid | 18.05.2012 | Examination fee paid | Examination procedure | 18.05.2012 | Examination requested [2012/39] | 07.01.2013 | Amendment by applicant (claims and/or description) | 22.01.2014 | Communication of intention to grant the patent | 20.05.2014 | Fee for grant paid | 20.05.2014 | Fee for publishing/printing paid | 20.05.2014 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 22.01.2014 | Opposition(s) | 07.04.2015 | No opposition filed within time limit [2015/24] | Fees paid | Renewal fee | 05.10.2012 | Renewal fee patent year 03 | 07.11.2013 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.11.2010 | AL | 02.07.2014 | AT | 02.07.2014 | BE | 02.07.2014 | CY | 02.07.2014 | CZ | 02.07.2014 | EE | 02.07.2014 | ES | 02.07.2014 | FI | 02.07.2014 | HR | 02.07.2014 | IT | 02.07.2014 | LT | 02.07.2014 | LV | 02.07.2014 | MC | 02.07.2014 | MK | 02.07.2014 | MT | 02.07.2014 | PL | 02.07.2014 | RO | 02.07.2014 | RS | 02.07.2014 | SE | 02.07.2014 | SI | 02.07.2014 | SK | 02.07.2014 | SM | 02.07.2014 | TR | 02.07.2014 | BG | 02.10.2014 | GR | 03.10.2014 | IS | 02.11.2014 | PT | 03.11.2014 | LU | 18.11.2014 | CH | 30.11.2014 | LI | 30.11.2014 | [2018/46] |
Former [2018/30] | HU | 18.11.2010 | |
AT | 02.07.2014 | ||
BE | 02.07.2014 | ||
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
MC | 02.07.2014 | ||
MK | 02.07.2014 | ||
MT | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
RS | 02.07.2014 | ||
SE | 02.07.2014 | ||
SI | 02.07.2014 | ||
SK | 02.07.2014 | ||
SM | 02.07.2014 | ||
TR | 02.07.2014 | ||
BG | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
LU | 18.11.2014 | ||
CH | 30.11.2014 | ||
LI | 30.11.2014 | ||
Former [2016/33] | HU | 18.11.2010 | |
AT | 02.07.2014 | ||
BE | 02.07.2014 | ||
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
MC | 02.07.2014 | ||
MT | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
RS | 02.07.2014 | ||
SE | 02.07.2014 | ||
SI | 02.07.2014 | ||
SK | 02.07.2014 | ||
SM | 02.07.2014 | ||
TR | 02.07.2014 | ||
BG | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
LU | 18.11.2014 | ||
CH | 30.11.2014 | ||
LI | 30.11.2014 | ||
Former [2016/32] | HU | 18.11.2010 | |
AT | 02.07.2014 | ||
BE | 02.07.2014 | ||
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
MC | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
RS | 02.07.2014 | ||
SE | 02.07.2014 | ||
SI | 02.07.2014 | ||
SK | 02.07.2014 | ||
SM | 02.07.2014 | ||
TR | 02.07.2014 | ||
BG | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
LU | 18.11.2014 | ||
CH | 30.11.2014 | ||
LI | 30.11.2014 | ||
Former [2016/22] | AT | 02.07.2014 | |
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
MC | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
RS | 02.07.2014 | ||
SE | 02.07.2014 | ||
SI | 02.07.2014 | ||
SK | 02.07.2014 | ||
SM | 02.07.2014 | ||
BG | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
LU | 18.11.2014 | ||
BE | 30.11.2014 | ||
CH | 30.11.2014 | ||
LI | 30.11.2014 | ||
Former [2015/50] | AT | 02.07.2014 | |
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
MC | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
RS | 02.07.2014 | ||
SE | 02.07.2014 | ||
SI | 02.07.2014 | ||
SK | 02.07.2014 | ||
BG | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
LU | 18.11.2014 | ||
BE | 30.11.2014 | ||
CH | 30.11.2014 | ||
LI | 30.11.2014 | ||
Former [2015/33] | AT | 02.07.2014 | |
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
MC | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
RS | 02.07.2014 | ||
SE | 02.07.2014 | ||
SK | 02.07.2014 | ||
BG | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
LU | 18.11.2014 | ||
BE | 30.11.2014 | ||
CH | 30.11.2014 | ||
LI | 30.11.2014 | ||
Former [2015/32] | AT | 02.07.2014 | |
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
MC | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
RS | 02.07.2014 | ||
SE | 02.07.2014 | ||
SK | 02.07.2014 | ||
BG | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
LU | 18.11.2014 | ||
BE | 30.11.2014 | ||
Former [2015/30] | AT | 02.07.2014 | |
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
RS | 02.07.2014 | ||
SE | 02.07.2014 | ||
SK | 02.07.2014 | ||
BG | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
LU | 18.11.2014 | ||
BE | 30.11.2014 | ||
Former [2015/23] | AT | 02.07.2014 | |
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
EE | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
RS | 02.07.2014 | ||
SE | 02.07.2014 | ||
SK | 02.07.2014 | ||
BG | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
Former [2015/22] | AT | 02.07.2014 | |
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
IT | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
PL | 02.07.2014 | ||
RO | 02.07.2014 | ||
RS | 02.07.2014 | ||
SE | 02.07.2014 | ||
BG | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
Former [2015/12] | AT | 02.07.2014 | |
CY | 02.07.2014 | ||
CZ | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
HR | 02.07.2014 | ||
LT | 02.07.2014 | ||
LV | 02.07.2014 | ||
PL | 02.07.2014 | ||
RS | 02.07.2014 | ||
SE | 02.07.2014 | ||
BG | 02.10.2014 | ||
GR | 03.10.2014 | ||
IS | 02.11.2014 | ||
PT | 03.11.2014 | ||
Former [2015/11] | CY | 02.07.2014 | |
CZ | 02.07.2014 | ||
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
LT | 02.07.2014 | ||
PL | 02.07.2014 | ||
SE | 02.07.2014 | ||
BG | 02.10.2014 | ||
GR | 03.10.2014 | ||
PT | 03.11.2014 | ||
Former [2015/10] | CZ | 02.07.2014 | |
ES | 02.07.2014 | ||
FI | 02.07.2014 | ||
LT | 02.07.2014 | ||
SE | 02.07.2014 | ||
BG | 02.10.2014 | ||
Former [2015/09] | FI | 02.07.2014 | |
LT | 02.07.2014 | ||
SE | 02.07.2014 | ||
Former [2015/08] | LT | 02.07.2014 | Cited in | International search | [XAI]US3385367 (PAUL KOLLSMAN) [X] 1-8,10,13-16 * column 4, lines 37-69; figures 1-16 * [A] 17-21 [I] 9,11,12; | [XI]US4137970 (LAFLIN GEORGE P, et al) [X] 1-8,10,13-16 * column 4, lines 12-41; figures 1, 2 *[I] 9,11,12; | [XAI]GB2411918 (SCHLUMBERGER HOLDINGS [VG]) [X] 1-8,10,13-16 * page 10, lines 15-29; figures 1-21 * [A] 17-21 [I] 9,11,12; | [XI]US7296597 (FREYER RUNE [NO], et al) [X] 1-8,10,13-16 * column 4, line 66 - column 5, line 5 * * column 5, lines 6-32 * * column 9, line 56 - column 10, line 7; figures 1-6E * [I] 9,11,12 | by applicant | US3385367 | US7296597 |