| EP2439863 - JOINT DETECTION METHOD AND DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.01.2020 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 08.02.2019 | ||
| Former | Grant of patent is intended Status updated on 03.10.2018 | ||
| Former | Examination is in progress Status updated on 21.09.2018 | ||
| Former | Grant of patent is intended Status updated on 16.09.2018 | ||
| Former | Examination is in progress Status updated on 02.03.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states ZTE Corporation ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan District Shenzhen, Guangdong 518057 / CN | [2019/11] |
| Former [2012/15] | For all designated states ZTE Corporation ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan District Shenzhen, Guangdong 518057 / CN | Inventor(s) | 01 /
CHEN, Liang ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | [2012/15] | Representative(s) | Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB Martin-Greif-Straße 1 80336 München / DE | [N/P] |
| Former [2019/11] | Manitz Finsterwald Patentanwälte PartmbB Martin-Greif-Strasse 1 80336 München / DE | ||
| Former [2012/15] | Manitz, Finsterwald & Partner GbR Martin-Greif-Strasse 1 80336 München / DE | Application number, filing date | 10791397.2 | 26.05.2010 | [2019/11] | WO2010CN73278 | Priority number, date | CN200910259260 | 15.12.2009 Original published format: CN200910259260 | [2012/15] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010148891 | Date: | 29.12.2010 | Language: | ZH | [2010/52] | Type: | A1 Application with search report | No.: | EP2439863 | Date: | 11.04.2012 | Language: | EN | [2012/15] | Type: | B1 Patent specification | No.: | EP2439863 | Date: | 13.03.2019 | Language: | EN | [2019/11] | Search report(s) | International search report - published on: | CN | 29.12.2010 | (Supplementary) European search report - dispatched on: | EP | 02.02.2017 | Classification | IPC: | H04L25/03, H04B1/7105, H04B17/00, H04B7/08 | [2017/10] | CPC: |
H04B7/0854 (EP);
H04B1/7105 (EP);
H04L25/03331 (EP);
H04L25/03337 (EP);
H04L25/03891 (EP)
|
| Former IPC [2012/15] | H04B17/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/15] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | VERBINDUNGSERKENNUNGSVERFAHREN UND -VORRICHTUNG | [2012/15] | English: | JOINT DETECTION METHOD AND DEVICE | [2012/15] | French: | PROCÉDÉ ET DISPOSITIF DE DÉTECTION CONJOINTE | [2012/15] | Entry into regional phase | 03.01.2012 | Translation filed | 03.01.2012 | National basic fee paid | 03.01.2012 | Search fee paid | 03.01.2012 | Designation fee(s) paid | 03.01.2012 | Examination fee paid | Examination procedure | 03.01.2012 | Examination requested [2012/15] | 29.08.2017 | Amendment by applicant (claims and/or description) | 06.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 11.07.2018 | Reply to a communication from the examining division | 04.10.2018 | Communication of intention to grant the patent | 28.01.2019 | Fee for grant paid | 28.01.2019 | Fee for publishing/printing paid | 28.01.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.03.2018 | Opposition(s) | 16.12.2019 | No opposition filed within time limit [2020/08] | Fees paid | Renewal fee | 30.03.2012 | Renewal fee patent year 03 | 29.05.2013 | Renewal fee patent year 04 | 29.05.2014 | Renewal fee patent year 05 | 26.05.2015 | Renewal fee patent year 06 | 25.05.2016 | Renewal fee patent year 07 | 25.05.2017 | Renewal fee patent year 08 | 30.05.2018 | Renewal fee patent year 09 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.05.2010 | AL | 13.03.2019 | AT | 13.03.2019 | CY | 13.03.2019 | CZ | 13.03.2019 | DK | 13.03.2019 | EE | 13.03.2019 | ES | 13.03.2019 | FI | 13.03.2019 | HR | 13.03.2019 | IT | 13.03.2019 | LT | 13.03.2019 | LV | 13.03.2019 | MC | 13.03.2019 | MK | 13.03.2019 | MT | 13.03.2019 | NL | 13.03.2019 | PL | 13.03.2019 | RO | 13.03.2019 | SE | 13.03.2019 | SI | 13.03.2019 | SK | 13.03.2019 | SM | 13.03.2019 | TR | 13.03.2019 | IE | 26.05.2019 | LU | 26.05.2019 | BE | 31.05.2019 | CH | 31.05.2019 | FR | 31.05.2019 | LI | 31.05.2019 | BG | 13.06.2019 | GB | 13.06.2019 | NO | 13.06.2019 | GR | 14.06.2019 | IS | 13.07.2019 | PT | 13.07.2019 | [2022/31] |
| Former [2021/34] | HU | 26.05.2010 | |
| AL | 13.03.2019 | ||
| AT | 13.03.2019 | ||
| CY | 13.03.2019 | ||
| CZ | 13.03.2019 | ||
| DK | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| MC | 13.03.2019 | ||
| MT | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SI | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| TR | 13.03.2019 | ||
| IE | 26.05.2019 | ||
| LU | 26.05.2019 | ||
| BE | 31.05.2019 | ||
| CH | 31.05.2019 | ||
| FR | 31.05.2019 | ||
| LI | 31.05.2019 | ||
| BG | 13.06.2019 | ||
| GB | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| IS | 13.07.2019 | ||
| PT | 13.07.2019 | ||
| Former [2021/32] | HU | 26.05.2010 | |
| AL | 13.03.2019 | ||
| AT | 13.03.2019 | ||
| CY | 13.03.2019 | ||
| CZ | 13.03.2019 | ||
| DK | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| MC | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SI | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| TR | 13.03.2019 | ||
| IE | 26.05.2019 | ||
| LU | 26.05.2019 | ||
| BE | 31.05.2019 | ||
| CH | 31.05.2019 | ||
| FR | 31.05.2019 | ||
| LI | 31.05.2019 | ||
| BG | 13.06.2019 | ||
| GB | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| IS | 13.07.2019 | ||
| PT | 13.07.2019 | ||
| Former [2021/26] | AL | 13.03.2019 | |
| AT | 13.03.2019 | ||
| CY | 13.03.2019 | ||
| CZ | 13.03.2019 | ||
| DK | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| MC | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SI | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| TR | 13.03.2019 | ||
| IE | 26.05.2019 | ||
| LU | 26.05.2019 | ||
| BE | 31.05.2019 | ||
| CH | 31.05.2019 | ||
| FR | 31.05.2019 | ||
| LI | 31.05.2019 | ||
| BG | 13.06.2019 | ||
| GB | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| IS | 13.07.2019 | ||
| PT | 13.07.2019 | ||
| Former [2020/29] | AL | 13.03.2019 | |
| AT | 13.03.2019 | ||
| CZ | 13.03.2019 | ||
| DK | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| MC | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SI | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| TR | 13.03.2019 | ||
| IE | 26.05.2019 | ||
| LU | 26.05.2019 | ||
| BE | 31.05.2019 | ||
| CH | 31.05.2019 | ||
| FR | 31.05.2019 | ||
| LI | 31.05.2019 | ||
| BG | 13.06.2019 | ||
| GB | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| IS | 13.07.2019 | ||
| PT | 13.07.2019 | ||
| Former [2020/24] | AL | 13.03.2019 | |
| AT | 13.03.2019 | ||
| CZ | 13.03.2019 | ||
| DK | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| MC | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SI | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| TR | 13.03.2019 | ||
| IE | 26.05.2019 | ||
| LU | 26.05.2019 | ||
| BE | 31.05.2019 | ||
| CH | 31.05.2019 | ||
| LI | 31.05.2019 | ||
| BG | 13.06.2019 | ||
| GB | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| IS | 13.07.2019 | ||
| PT | 13.07.2019 | ||
| Former [2020/21] | AL | 13.03.2019 | |
| AT | 13.03.2019 | ||
| CZ | 13.03.2019 | ||
| DK | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| MC | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SI | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| TR | 13.03.2019 | ||
| IE | 26.05.2019 | ||
| LU | 26.05.2019 | ||
| CH | 31.05.2019 | ||
| LI | 31.05.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| IS | 13.07.2019 | ||
| PT | 13.07.2019 | ||
| Former [2020/17] | AL | 13.03.2019 | |
| AT | 13.03.2019 | ||
| CZ | 13.03.2019 | ||
| DK | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| MC | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SI | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| TR | 13.03.2019 | ||
| LU | 26.05.2019 | ||
| CH | 31.05.2019 | ||
| LI | 31.05.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| IS | 13.07.2019 | ||
| PT | 13.07.2019 | ||
| Former [2020/11] | AL | 13.03.2019 | |
| AT | 13.03.2019 | ||
| CZ | 13.03.2019 | ||
| DK | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| MC | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SI | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| LU | 26.05.2019 | ||
| CH | 31.05.2019 | ||
| LI | 31.05.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| IS | 13.07.2019 | ||
| PT | 13.07.2019 | ||
| Former [2020/09] | AL | 13.03.2019 | |
| AT | 13.03.2019 | ||
| CZ | 13.03.2019 | ||
| DK | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| MC | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| IS | 13.07.2019 | ||
| PT | 13.07.2019 | ||
| Former [2020/07] | AL | 13.03.2019 | |
| AT | 13.03.2019 | ||
| CZ | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| MC | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| IS | 13.07.2019 | ||
| PT | 13.07.2019 | ||
| Former [2020/04] | AL | 13.03.2019 | |
| AT | 13.03.2019 | ||
| CZ | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| IS | 13.07.2019 | ||
| PT | 13.07.2019 | ||
| Former [2020/03] | AL | 13.03.2019 | |
| AT | 13.03.2019 | ||
| CZ | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| PT | 13.07.2019 | ||
| Former [2019/52] | AL | 13.03.2019 | |
| CZ | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| PL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| SM | 13.03.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| PT | 13.07.2019 | ||
| Former [2019/49] | AL | 13.03.2019 | |
| CZ | 13.03.2019 | ||
| EE | 13.03.2019 | ||
| ES | 13.03.2019 | ||
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| RO | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| SK | 13.03.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| PT | 13.07.2019 | ||
| Former [2019/48] | ES | 13.03.2019 | |
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| PT | 13.07.2019 | ||
| Former [2019/47] | ES | 13.03.2019 | |
| FI | 13.03.2019 | ||
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| Former [2019/46] | FI | 13.03.2019 | |
| HR | 13.03.2019 | ||
| IT | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| Former [2019/39] | FI | 13.03.2019 | |
| HR | 13.03.2019 | ||
| LT | 13.03.2019 | ||
| LV | 13.03.2019 | ||
| NL | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| Former [2019/38] | FI | 13.03.2019 | |
| LT | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| BG | 13.06.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| Former [2019/37] | FI | 13.03.2019 | |
| LT | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| NO | 13.06.2019 | ||
| GR | 14.06.2019 | ||
| Former [2019/34] | FI | 13.03.2019 | |
| LT | 13.03.2019 | ||
| SE | 13.03.2019 | ||
| NO | 13.06.2019 | ||
| Former [2019/33] | FI | 13.03.2019 | |
| LT | 13.03.2019 | ||
| NO | 13.06.2019 | Documents cited: | Search | [A] US6144710 (CHEN JIUNN-TSAIR et al.) [A] 1-10 * the whole document * | [YA] LOZANO A ET AL: "Adaptive MLSE receiver for dual-band IS-136 TDMA", PERSONAL, INDOOR AND MOBILE RADIO COMMUNICATIONS, 1997. WAVES OF THE Y EAR 2000. PIMRC '97., THE 8TH IEEE INTERNATIONAL SYMPOSIUM ON HELSINKI, FINLAND 1-4 SEPT. 1997, NEW YORK, NY, USA,IEEE, US, vol. 3, 1 September 1997 (1997-09-01), pages 816 - 820, XP010247561, ISBN: 978-0-7803-3871-5, DOI: 10.1109/PIMRC.1997.626999 [Y] 1-3,6-8 * Eq.1; page 2, column 1 * * page 2, column 1 - column 2 *[A] 4,5,9,10 DOI: http://dx.doi.org/10.1109/PIMRC.1997.626999 | [YA] JIUNN-TSAIR CHEN ET AL: "Joint MLSE Receiver with Dynamic Channel Description", IEEE JOURNAL ON SELECTED AREAS IN COMMUNICATIONS, IEEE SERVICE CENTER, PISCATAWAY, US, vol. 16, no. 9, 1 December 1998 (1998-12-01), XP011054870, ISSN: 0733-8716 [Y] 1-3,6-8 * abstract * * page 3, column 1 - column 2 *[A] 4,5,9,10 | [A] HENDRIK SCHOENEICH AND PETER A HOEHER: "Single Antenna Cochannel Interference Cancellation in Asynchronous TDMA Systems", PROCEEDINGS OF BAIONA WORKSHOP ON SIGNAL PROCESSING INCOMMUNICATIONS, XX, XX, 8 September 2003 (2003-09-08), pages 157 - 162, XP002290137 [A] 1-10 * the whole document * | [A] RANTA P A ET AL: "CO-CHANNEL INTERFERENCE CANCELLING RECEIVER FOR TDMA MOBILE SYSTEMS", COMMUNICATIONS - GATEWAY TO GLOBALIZATION. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON COMMUNICATIONS. SEATTLE, JUNE 18 - 22, 1995; [PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC)], NEW YORK, IEEE, US, vol. 1, 18 June 1995 (1995-06-18), pages 17 - 21, XP000532964, ISBN: 978-0-7803-2487-9 [A] 1-10 * the whole document * | International search | [A] CN1604512 (FUJITSU LTD et al.) [A] | [A] CN101056117 (TD TECH COMMUNICATION TECH LTD et al.) [A] | [A] CN101527919 (ZTE CORP et al.) [A] | [A] US2008123719 (LEE JANG-YEON et al.) [A] |