| EP2453968 - An alignment adaptor for facilitating the insertion of a guidewire into a dilator [Right-click to bookmark this link] | |||
| Former [2012/21] | GUIDEWIRE AND METHOD OF INSERTION OF SAME | ||
| [2019/14] | Status | No opposition filed within time limit Status updated on 17.07.2020 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 09.08.2019 | ||
| Former | Grant of patent is intended Status updated on 08.04.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Medical Components, Inc. 1499 Delp Drive Harleysville, PA 19438 / US | [2012/21] | Inventor(s) | 01 /
CHESNIN, Kenneth, J 1704 Christian Street Philadelphia PA 19146 / US | 02 /
BASTA, Michael P.O. Box 340 Kulpsville PA 19443 / US | 03 /
ENGLE, Sam 949 Cholet Drive Collegeville PA 19426 / US | 04 /
CELLINI, Michael 5004 Swan Drive Phoenixville PA 19460 / US | 05 /
SANFORD, Kevin 3643 Meadow Lane Chalfont PA 18914 / US | [2012/21] | Representative(s) | Barker Brettell LLP 100 Hagley Road Edgbaston Birmingham B16 8QQ / GB | [2019/37] |
| Former [2012/21] | Gosnall, Toby Barker Brettell LLP 100 Hagley Road Edgbaston Birmingham B16 8QQ / GB | Application number, filing date | 10800668.5 | 19.07.2010 | [2019/37] | WO2010US42459 | Priority number, date | US20090226428P | 17.07.2009 Original published format: US 226428 P | [2012/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011009127 | Date: | 20.01.2011 | Language: | EN | [2011/03] | Type: | A1 Application with search report | No.: | EP2453968 | Date: | 23.05.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.01.2011 takes the place of the publication of the European patent application. | [2012/21] | Type: | B1 Patent specification | No.: | EP2453968 | Date: | 11.09.2019 | Language: | EN | [2019/37] | Search report(s) | International search report - published on: | US | 20.01.2011 | (Supplementary) European search report - dispatched on: | EP | 05.03.2013 | Classification | IPC: | A61M25/00 | [2012/21] | CPC: |
A61M25/09 (EP,US);
A61M25/01 (EP,US);
A61M25/0668 (EP,US);
A61M25/09016 (EP,US);
A61M2025/09116 (EP,US);
A61M2025/09175 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/21] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | Ein Ausrichtungsadapter zur Erleichterung des Einführens eines Führungsdrahtes in einen Dilatator | [2019/17] | English: | An alignment adaptor for facilitating the insertion of a guidewire into a dilator | [2019/17] | French: | Adaptateur d'alignement pour faciliter l'insertion d'un fil de guidage dans un dilatateur | [2019/17] |
| Former [2012/21] | FÜHRUNGSDRAHT UND VERFAHREN ZUM EINFÜHREN DAVON | ||
| Former [2012/21] | GUIDEWIRE AND METHOD OF INSERTION OF SAME | ||
| Former [2012/21] | FIL-GUIDE ET SON PROCÉDÉ D'INTRODUCTION | Entry into regional phase | 13.02.2012 | National basic fee paid | 13.02.2012 | Search fee paid | 13.02.2012 | Designation fee(s) paid | 13.02.2012 | Examination fee paid | Examination procedure | 13.02.2012 | Examination requested [2012/21] | 01.10.2013 | Amendment by applicant (claims and/or description) | 06.01.2014 | Despatch of a communication from the examining division (Time limit: M06) | 15.07.2014 | Reply to a communication from the examining division | 27.06.2016 | Despatch of a communication from the examining division (Time limit: M04) | 26.10.2016 | Reply to a communication from the examining division | 09.04.2019 | Communication of intention to grant the patent | 01.08.2019 | Fee for grant paid | 01.08.2019 | Fee for publishing/printing paid | 01.08.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.01.2014 | Opposition(s) | 15.06.2020 | No opposition filed within time limit [2020/34] | Fees paid | Renewal fee | 31.07.2012 | Renewal fee patent year 03 | 26.07.2013 | Renewal fee patent year 04 | 28.07.2014 | Renewal fee patent year 05 | 30.07.2015 | Renewal fee patent year 06 | 11.07.2016 | Renewal fee patent year 07 | 12.07.2017 | Renewal fee patent year 08 | 11.07.2018 | Renewal fee patent year 09 | 15.07.2019 | Renewal fee patent year 10 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.07.2010 | AL | 11.09.2019 | AT | 11.09.2019 | CY | 11.09.2019 | CZ | 11.09.2019 | DK | 11.09.2019 | EE | 11.09.2019 | ES | 11.09.2019 | FI | 11.09.2019 | HR | 11.09.2019 | IT | 11.09.2019 | LT | 11.09.2019 | LV | 11.09.2019 | MC | 11.09.2019 | MK | 11.09.2019 | MT | 11.09.2019 | NL | 11.09.2019 | PL | 11.09.2019 | RO | 11.09.2019 | SE | 11.09.2019 | SI | 11.09.2019 | SK | 11.09.2019 | SM | 11.09.2019 | TR | 11.09.2019 | BG | 11.12.2019 | NO | 11.12.2019 | GR | 12.12.2019 | IS | 12.01.2020 | PT | 13.01.2020 | [2022/32] |
| Former [2022/27] | HU | 19.07.2010 | |
| AL | 11.09.2019 | ||
| AT | 11.09.2019 | ||
| CY | 11.09.2019 | ||
| CZ | 11.09.2019 | ||
| DK | 11.09.2019 | ||
| EE | 11.09.2019 | ||
| ES | 11.09.2019 | ||
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| IT | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| MC | 11.09.2019 | ||
| MT | 11.09.2019 | ||
| NL | 11.09.2019 | ||
| PL | 11.09.2019 | ||
| RO | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| SI | 11.09.2019 | ||
| SK | 11.09.2019 | ||
| SM | 11.09.2019 | ||
| TR | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| IS | 12.01.2020 | ||
| PT | 13.01.2020 | ||
| Former [2022/26] | AL | 11.09.2019 | |
| AT | 11.09.2019 | ||
| CZ | 11.09.2019 | ||
| DK | 11.09.2019 | ||
| EE | 11.09.2019 | ||
| ES | 11.09.2019 | ||
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| IT | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| MC | 11.09.2019 | ||
| NL | 11.09.2019 | ||
| PL | 11.09.2019 | ||
| RO | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| SI | 11.09.2019 | ||
| SK | 11.09.2019 | ||
| SM | 11.09.2019 | ||
| TR | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| IS | 12.01.2020 | ||
| PT | 13.01.2020 | ||
| Former [2021/15] | AL | 11.09.2019 | |
| AT | 11.09.2019 | ||
| CZ | 11.09.2019 | ||
| DK | 11.09.2019 | ||
| EE | 11.09.2019 | ||
| ES | 11.09.2019 | ||
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| IT | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| MC | 11.09.2019 | ||
| NL | 11.09.2019 | ||
| PL | 11.09.2019 | ||
| RO | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| SI | 11.09.2019 | ||
| SK | 11.09.2019 | ||
| SM | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| IS | 12.01.2020 | ||
| PT | 13.01.2020 | ||
| Former [2020/37] | AL | 11.09.2019 | |
| AT | 11.09.2019 | ||
| CZ | 11.09.2019 | ||
| DK | 11.09.2019 | ||
| EE | 11.09.2019 | ||
| ES | 11.09.2019 | ||
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| IT | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| NL | 11.09.2019 | ||
| PL | 11.09.2019 | ||
| RO | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| SI | 11.09.2019 | ||
| SK | 11.09.2019 | ||
| SM | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| IS | 12.01.2020 | ||
| PT | 13.01.2020 | ||
| Former [2020/36] | AL | 11.09.2019 | |
| AT | 11.09.2019 | ||
| CZ | 11.09.2019 | ||
| DK | 11.09.2019 | ||
| EE | 11.09.2019 | ||
| ES | 11.09.2019 | ||
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| IT | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| NL | 11.09.2019 | ||
| PL | 11.09.2019 | ||
| RO | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| SK | 11.09.2019 | ||
| SM | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| IS | 12.01.2020 | ||
| PT | 13.01.2020 | ||
| Former [2020/27] | AL | 11.09.2019 | |
| AT | 11.09.2019 | ||
| CZ | 11.09.2019 | ||
| EE | 11.09.2019 | ||
| ES | 11.09.2019 | ||
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| IT | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| NL | 11.09.2019 | ||
| PL | 11.09.2019 | ||
| RO | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| SK | 11.09.2019 | ||
| SM | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| PT | 13.01.2020 | ||
| IS | 24.02.2020 | ||
| Former [2020/25] | AL | 11.09.2019 | |
| AT | 11.09.2019 | ||
| CZ | 11.09.2019 | ||
| EE | 11.09.2019 | ||
| ES | 11.09.2019 | ||
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| IT | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| NL | 11.09.2019 | ||
| PL | 11.09.2019 | ||
| RO | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| SK | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| PT | 13.01.2020 | ||
| IS | 24.02.2020 | ||
| Former [2020/24] | AL | 11.09.2019 | |
| AT | 11.09.2019 | ||
| EE | 11.09.2019 | ||
| ES | 11.09.2019 | ||
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| IT | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| NL | 11.09.2019 | ||
| PL | 11.09.2019 | ||
| RO | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| PT | 13.01.2020 | ||
| IS | 24.02.2020 | ||
| Former [2020/23] | AL | 11.09.2019 | |
| AT | 11.09.2019 | ||
| EE | 11.09.2019 | ||
| ES | 11.09.2019 | ||
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| IT | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| NL | 11.09.2019 | ||
| PL | 11.09.2019 | ||
| RO | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| PT | 13.01.2020 | ||
| Former [2020/22] | AL | 11.09.2019 | |
| EE | 11.09.2019 | ||
| ES | 11.09.2019 | ||
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| NL | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| PT | 13.01.2020 | ||
| Former [2020/20] | AL | 11.09.2019 | |
| ES | 11.09.2019 | ||
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| NL | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| Former [2020/15] | AL | 11.09.2019 | |
| ES | 11.09.2019 | ||
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| Former [2020/11] | ES | 11.09.2019 | |
| FI | 11.09.2019 | ||
| HR | 11.09.2019 | ||
| LT | 11.09.2019 | ||
| LV | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| GR | 12.12.2019 | ||
| Former [2020/10] | FI | 11.09.2019 | |
| LT | 11.09.2019 | ||
| SE | 11.09.2019 | ||
| BG | 11.12.2019 | ||
| NO | 11.12.2019 | ||
| Former [2020/09] | FI | 11.09.2019 | |
| LT | 11.09.2019 | ||
| NO | 11.12.2019 | ||
| Former [2020/08] | LT | 11.09.2019 | |
| NO | 11.12.2019 | Documents cited: | Search | [X] US4838880 (HONMA MASAAKI et al.) [X] 1-8 * the whole document * | [X] EP0801955 (SCHNEIDER EUROP AG et al.) [X] 1-8 * the whole document * | [X] WO0158505 (VYGON et al.) [X] 1-3,5-7 * the whole document * | [X] US5320613 (HOUGE REED A et al.) [X] 1-3,5-7 * the whole document * | [X] US2006116691 (BONACCI FABRICE et al.) [X] 1-3,5-7 * the whole document * | Examination | US2002165537 | by applicant | US4838880 | EP0801955 | US5320613 | US2006116691 |