EP2464061 - METHOD, APPARATUS AND SYSTEM FOR BUILDING ON-DEMAND ROUTING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.02.2018 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 17.03.2017 | ||
Former | Grant of patent is intended Status updated on 27.01.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2017/16] |
Former [2012/24] | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building, Bantian Longgang District Shenzhen Guangdong 518129 / CN | Inventor(s) | 01 /
LIU, Yongjun Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | [2012/24] | Representative(s) | Isarpatent Patent- und Rechtsanwälte Barth Charles Hassa Peckmann & Partner mbB Postfach 44 01 51 80750 München / DE | [N/P] |
Former [2017/16] | Isarpatent Patent- und Rechtsanwälte Behnisch Barth Charles Hassa Peckmann & Partner mbB Postfach 44 01 51 80750 München / DE | ||
Former [2012/24] | Isarpatent Patent- und Rechtsanwälte Postfach 44 01 51 80750 München / DE | Application number, filing date | 10806057.5 | 06.08.2010 | [2017/16] | WO2010CN75780 | Priority number, date | CN200910165615 | 06.08.2009 Original published format: CN200910165615 | [2012/24] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011015153 | Date: | 10.02.2011 | Language: | ZH | [2011/06] | Type: | A1 Application with search report | No.: | EP2464061 | Date: | 13.06.2012 | Language: | EN | [2012/24] | Type: | B1 Patent specification | No.: | EP2464061 | Date: | 19.04.2017 | Language: | EN | [2017/16] | Search report(s) | International search report - published on: | CN | 10.02.2011 | (Supplementary) European search report - dispatched on: | EP | 28.06.2012 | Classification | IPC: | H04L12/721, H04W40/28, H04W40/14, H04L12/733, H04W40/24, // H04L12/701 | [2016/46] | CPC: |
H04W40/28 (EP,US);
H04W40/14 (EP,KR,US);
H04L45/00 (EP,KR);
H04L45/14 (EP,US);
H04L45/20 (EP,US);
H04W40/24 (KR);
|
Former IPC [2016/44] | H04L12/721, // H04L12/701 | ||
Former IPC [2012/31] | H04W40/24, H04W40/28 | ||
Former IPC [2012/24] | H04L12/56 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/24] | Extension states | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN, VORRICHTUNG UND SYSTEM ZUM AUFBAU EINES ON-DEMAND-ROUTINGS | [2012/24] | English: | METHOD, APPARATUS AND SYSTEM FOR BUILDING ON-DEMAND ROUTING | [2012/24] | French: | PROCÉDÉ, DISPOSITIF ET SYSTÈME DE CRÉATION D UN ROUTAGE À LA DEMANDE | [2012/24] | Entry into regional phase | 17.02.2012 | Translation filed | 17.02.2012 | National basic fee paid | 17.02.2012 | Search fee paid | 17.02.2012 | Designation fee(s) paid | 17.02.2012 | Examination fee paid | Examination procedure | 17.02.2012 | Examination requested [2012/24] | 28.01.2013 | Amendment by applicant (claims and/or description) | 28.08.2015 | Despatch of a communication from the examining division (Time limit: M04) | 07.01.2016 | Reply to a communication from the examining division | 22.03.2016 | Despatch of a communication from the examining division (Time limit: M04) | 22.07.2016 | Reply to a communication from the examining division | 24.10.2016 | Communication of intention to grant the patent | 20.01.2017 | Fee for grant paid | 20.01.2017 | Fee for publishing/printing paid | 01.03.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | EP17150864.1 / EP3229528 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.08.2015 | Opposition(s) | 22.01.2018 | No opposition filed within time limit [2018/13] | Fees paid | Renewal fee | 31.08.2012 | Renewal fee patent year 03 | 30.08.2013 | Renewal fee patent year 04 | 29.08.2014 | Renewal fee patent year 05 | 31.08.2015 | Renewal fee patent year 06 | 31.08.2016 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.08.2010 | AL | 19.04.2017 | AT | 19.04.2017 | CY | 19.04.2017 | CZ | 19.04.2017 | DK | 19.04.2017 | EE | 19.04.2017 | ES | 19.04.2017 | FI | 19.04.2017 | HR | 19.04.2017 | IT | 19.04.2017 | LT | 19.04.2017 | LV | 19.04.2017 | MC | 19.04.2017 | MK | 19.04.2017 | PL | 19.04.2017 | PT | 19.04.2017 | RO | 19.04.2017 | SE | 19.04.2017 | SI | 19.04.2017 | SK | 19.04.2017 | SM | 19.04.2017 | TR | 19.04.2017 | BG | 19.07.2017 | NO | 19.07.2017 | GR | 20.07.2017 | GB | 06.08.2017 | IE | 06.08.2017 | LU | 06.08.2017 | MT | 06.08.2017 | IS | 19.08.2017 | BE | 31.08.2017 | [2020/33] |
Former [2020/27] | HU | 06.08.2010 | |
AT | 19.04.2017 | ||
CY | 19.04.2017 | ||
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
MK | 19.04.2017 | ||
PL | 19.04.2017 | ||
PT | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
TR | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
GB | 06.08.2017 | ||
IE | 06.08.2017 | ||
LU | 06.08.2017 | ||
MT | 06.08.2017 | ||
IS | 19.08.2017 | ||
BE | 31.08.2017 | ||
Former [2020/15] | HU | 06.08.2010 | |
AT | 19.04.2017 | ||
CY | 19.04.2017 | ||
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
MK | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
TR | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
GB | 06.08.2017 | ||
IE | 06.08.2017 | ||
LU | 06.08.2017 | ||
MT | 06.08.2017 | ||
IS | 19.08.2017 | ||
BE | 31.08.2017 | ||
Former [2019/52] | HU | 06.08.2010 | |
AT | 19.04.2017 | ||
CY | 19.04.2017 | ||
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
MK | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
GB | 06.08.2017 | ||
IE | 06.08.2017 | ||
LU | 06.08.2017 | ||
MT | 06.08.2017 | ||
IS | 19.08.2017 | ||
BE | 31.08.2017 | ||
Former [2019/46] | HU | 06.08.2010 | |
AT | 19.04.2017 | ||
CY | 19.04.2017 | ||
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
GB | 06.08.2017 | ||
IE | 06.08.2017 | ||
LU | 06.08.2017 | ||
MT | 06.08.2017 | ||
IS | 19.08.2017 | ||
BE | 31.08.2017 | ||
Former [2019/31] | HU | 06.08.2010 | |
AT | 19.04.2017 | ||
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
GB | 06.08.2017 | ||
IE | 06.08.2017 | ||
LU | 06.08.2017 | ||
MT | 06.08.2017 | ||
IS | 19.08.2017 | ||
BE | 31.08.2017 | ||
Former [2018/43] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
GB | 06.08.2017 | ||
IE | 06.08.2017 | ||
LU | 06.08.2017 | ||
MT | 06.08.2017 | ||
IS | 19.08.2017 | ||
BE | 31.08.2017 | ||
Former [2018/37] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
GB | 06.08.2017 | ||
IE | 06.08.2017 | ||
LU | 06.08.2017 | ||
IS | 19.08.2017 | ||
BE | 31.08.2017 | ||
Former [2018/35] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
GB | 06.08.2017 | ||
IE | 06.08.2017 | ||
LU | 06.08.2017 | ||
IS | 19.08.2017 | ||
Former [2018/34] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IE | 06.08.2017 | ||
LU | 06.08.2017 | ||
IS | 19.08.2017 | ||
Former [2018/25] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2018/18] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2018/11] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2018/10] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
SE | 19.04.2017 | ||
SK | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2018/09] | AT | 19.04.2017 | |
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
PL | 19.04.2017 | ||
SE | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2017/50] | AT | 19.04.2017 | |
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
PL | 19.04.2017 | ||
SE | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2017/49] | AT | 19.04.2017 | |
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
LT | 19.04.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | Documents cited: | Search | [XI] - AGARWAL S ET AL, "ROUTE-LIFETIME ASSESSMENT BASED ROUTING (RABR) PROTOCOL FOR MOBILE AD-HOC NETWORKS", ICC 2000. 2000 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS. CONFERENCE RECORD. NEW ORLEANS, LA, JUNE 18-21, 2000; [IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS], NEW YORK, NY : IEEE, US, (20000618), vol. 3, ISBN 978-0-7803-6284-0, pages 1697 - 1701, XP001208698 [X] 1,8,15 * page 1697 - column left * * page 1700 - column left * * section A.; page 1698 * [I] 2-7,9-14 | International search | [Y]CN1650573 (HARRIS CORP [US]); | [A]CN1937576 (NTT DOCOMO INC [JP]); | [X] - LI YUAN ET AL., "Distance vector routing algorithm based on state stability update.", COMPUTER ENGINEERING., (20070630), vol. 33, no. 12, pages 105 - 107,113, XP008149516 |