EP2497590 - COATED TOOL [Right-click to bookmark this link] | Status | Patent revoked Status updated on 01.11.2019 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 27.01.2017 | ||
Former | Grant of patent is intended Status updated on 20.01.2017 | ||
Former | Examination is in progress Status updated on 03.01.2017 | ||
Former | Grant of patent is intended Status updated on 23.12.2016 | Most recent event Tooltip | 27.05.2022 | Lapse of the patent in a contracting state New state(s): TR | published on 29.06.2022 [2022/26] | Applicant(s) | For all designated states Tungaloy Corporation 11-1, Yoshima-Kogyodanchi Iwaki-shi Fukushima 970-1144 / JP | [2012/37] | Inventor(s) | 01 /
SONE, Yohei c/o Tungaloy Corporation 11-1, Yoshima-Kogyodanchi, Iwaki-shi Fukushima 9701144 / JP | [2012/37] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2017/09] |
Former [2012/37] | Vossius & Partner Siebertstrasse 4 81675 München / DE | Application number, filing date | 10828371.4 | 08.11.2010 | [2017/09] | WO2010JP69791 | Priority number, date | JP20090254703 | 06.11.2009 Original published format: JP 2009254703 | [2012/37] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011055813 | Date: | 12.05.2011 | Language: | JA | [2011/19] | Type: | A1 Application with search report | No.: | EP2497590 | Date: | 12.09.2012 | Language: | EN | [2012/37] | Type: | B1 Patent specification | No.: | EP2497590 | Date: | 01.03.2017 | Language: | EN | [2017/09] | Search report(s) | International search report - published on: | JP | 12.05.2011 | (Supplementary) European search report - dispatched on: | EP | 13.11.2013 | Classification | IPC: | B23B27/14, C23C16/40, C23C16/34, C23C28/04, C23C30/00 | [2013/50] | CPC: |
C23C16/403 (EP,US);
B23B27/14 (KR);
C23C16/34 (EP,US);
C23C16/40 (KR);
C23C28/044 (EP,US);
C23C30/005 (EP,US);
Y10T407/27 (EP,US);
Y10T428/24355 (EP,US);
Y10T428/24942 (EP,US);
|
Former IPC [2012/37] | B23B27/14, C23C16/40 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | BESCHICHTETES WERKZEUG | [2012/37] | English: | COATED TOOL | [2012/37] | French: | OUTIL REVÊTU | [2012/37] | Entry into regional phase | 16.05.2012 | Translation filed | 01.06.2012 | National basic fee paid | 01.06.2012 | Search fee paid | 01.06.2012 | Designation fee(s) paid | 01.06.2012 | Examination fee paid | Examination procedure | 01.06.2012 | Examination requested [2012/37] | 06.06.2014 | Amendment by applicant (claims and/or description) | 26.02.2015 | Despatch of a communication from the examining division (Time limit: M04) | 10.06.2015 | Reply to a communication from the examining division | 30.03.2016 | Despatch of a communication from the examining division (Time limit: M04) | 08.07.2016 | Reply to a communication from the examining division | 24.08.2016 | Communication of intention to grant the patent | 16.12.2016 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 16.12.2016 | Fee for grant paid | 16.12.2016 | Fee for publishing/printing paid | 20.01.2017 | Information about intention to grant a patent | 20.01.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.02.2015 | Opposition(s) | Opponent(s) | 01
01.12.2017
07.12.2017
ADMISSIBLE Sandvik Intellectual Property AB Storgatan 2 811 81 Sandviken / SE Opponent's representative WSL Patentanwälte Partnerschaft mbB Kaiser-Friedrich-Ring 98 65185 Wiesbaden / DE | [2019/10] |
Former [2018/21] | |||
Opponent(s) | 01
01.12.2017
07.12.2017
ADMISSIBLE Sandvik Intellectual Property AB Storgatan 2 811 81 Sandviken / SE Opponent's representative Sandvik Sandvik Intellectual Property AB 811 81 Sandviken / SE | ||
Former [2018/02] | |||
Opponent(s) | 01
01.12.2017
07.12.2017
ADMISSIBLE Sandvik Intellectual Property AB Storgatan 2 811 81 Sandviken / SE Opponent's representative Medin, Ulrika Sandvik Intellectual Property AB 811 81 Sandviken / SE | 15.12.2017 | Invitation to proprietor to file observations on the notice of opposition | 23.04.2018 | Reply of patent proprietor to notice(s) of opposition | 12.06.2019 | Date of oral proceedings | 12.06.2019 | Legal effect of revocation of patent [2019/49] | 18.07.2019 | Despatch of minutes of oral proceedings | 19.07.2019 | Despatch of communication that the patent will be revoked | Fees paid | Renewal fee | 23.11.2012 | Renewal fee patent year 03 | 25.11.2013 | Renewal fee patent year 04 | 24.11.2014 | Renewal fee patent year 05 | 25.11.2015 | Renewal fee patent year 06 | 25.11.2016 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.11.2010 | AL | 01.03.2017 | AT | 01.03.2017 | CY | 01.03.2017 | CZ | 01.03.2017 | DK | 01.03.2017 | EE | 01.03.2017 | ES | 01.03.2017 | FI | 01.03.2017 | HR | 01.03.2017 | IT | 01.03.2017 | LT | 01.03.2017 | LV | 01.03.2017 | MC | 01.03.2017 | MK | 01.03.2017 | NL | 01.03.2017 | PL | 01.03.2017 | RO | 01.03.2017 | RS | 01.03.2017 | SE | 01.03.2017 | SI | 01.03.2017 | SK | 01.03.2017 | SM | 01.03.2017 | TR | 01.03.2017 | BG | 01.06.2017 | NO | 01.06.2017 | GR | 02.06.2017 | IS | 01.07.2017 | PT | 03.07.2017 | IE | 08.11.2017 | LU | 08.11.2017 | MT | 08.11.2017 | BE | 30.11.2017 | CH | 30.11.2017 | LI | 30.11.2017 | [2022/26] |
Former [2020/33] | HU | 08.11.2010 | |
AL | 01.03.2017 | ||
AT | 01.03.2017 | ||
CY | 01.03.2017 | ||
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
MK | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
IE | 08.11.2017 | ||
LU | 08.11.2017 | ||
MT | 08.11.2017 | ||
BE | 30.11.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2019/52] | HU | 08.11.2010 | |
AT | 01.03.2017 | ||
CY | 01.03.2017 | ||
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
MK | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
IE | 08.11.2017 | ||
LU | 08.11.2017 | ||
MT | 08.11.2017 | ||
BE | 30.11.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2019/46] | HU | 08.11.2010 | |
AT | 01.03.2017 | ||
CY | 01.03.2017 | ||
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
IE | 08.11.2017 | ||
LU | 08.11.2017 | ||
MT | 08.11.2017 | ||
BE | 30.11.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2019/31] | HU | 08.11.2010 | |
AT | 01.03.2017 | ||
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
IE | 08.11.2017 | ||
LU | 08.11.2017 | ||
MT | 08.11.2017 | ||
BE | 30.11.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/50] | AT | 01.03.2017 | |
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
IE | 08.11.2017 | ||
LU | 08.11.2017 | ||
MT | 08.11.2017 | ||
BE | 30.11.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/45] | AT | 01.03.2017 | |
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
IE | 08.11.2017 | ||
LU | 08.11.2017 | ||
MT | 08.11.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/43] | AT | 01.03.2017 | |
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
LU | 08.11.2017 | ||
MT | 08.11.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/41] | AT | 01.03.2017 | |
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
LU | 08.11.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/33] | AT | 01.03.2017 | |
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
MC | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
CH | 30.11.2017 | ||
LI | 30.11.2017 | ||
Former [2018/14] | AT | 01.03.2017 | |
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SI | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2018/09] | AT | 01.03.2017 | |
CZ | 01.03.2017 | ||
DK | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2017/51] | AT | 01.03.2017 | |
CZ | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
SM | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
PT | 03.07.2017 | ||
Former [2017/50] | AT | 01.03.2017 | |
CZ | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
NL | 01.03.2017 | ||
PL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
Former [2017/49] | AT | 01.03.2017 | |
CZ | 01.03.2017 | ||
EE | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
IT | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
NL | 01.03.2017 | ||
RO | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
SK | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
IS | 01.07.2017 | ||
Former [2017/48] | AT | 01.03.2017 | |
CZ | 01.03.2017 | ||
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
NL | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | ||
Former [2017/41] | AT | 01.03.2017 | |
ES | 01.03.2017 | ||
FI | 01.03.2017 | ||
HR | 01.03.2017 | ||
LT | 01.03.2017 | ||
LV | 01.03.2017 | ||
NL | 01.03.2017 | ||
RS | 01.03.2017 | ||
SE | 01.03.2017 | ||
BG | 01.06.2017 | ||
NO | 01.06.2017 | ||
GR | 02.06.2017 | Documents cited: | Search | [XYI]US6333103 (ISHII TOSHIO [JP], et al) [X] 1-4,15 * col. 7, l. 16-30 col. 8, l. 41-63;; examples 1, 2; tables 5,6,8,9 * [Y] 12 [I] 5-11,13,14; | [Y]US2006141271 (RUPPI SAKARI [SE]) [Y] 12 * paragraph [0021]; claim 18 *; | [Y]US2008187775 (RUPPI SAKARI [SE], et al) [Y] 12 * paragraph [0041]; claim 8 *; | [Y]US2008311290 (RUPPI SAKARI [SE]) [Y] 12 * paragraph [0022]; claim 18 *; | [A] - RUPPI ET AL, "Deposition, microstructure and properties of texture-controlled CVD alpha-Al2O3 coatings", INTERNATIONAL JOURNAL OF REFRACTORY METALS AND HARD MATERIALS, ELSEVIER PUBLISHERS, BARKING, GB, vol. 23, no. 4-6, doi:10.1016/j.ijrmhm.2005.05.004, ISSN 0263-4368, (20050616), pages 306 - 316, (20050701), XP027651161 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1016/j.ijrmhm.2005.05.004 | International search | [Y]JPH11256336 (HITACHI METALS LTD, et al); | [Y]WO2006070538 (SUMITOMO ELEC HARDMETAL CORP [JP], et al); | [Y]JP2008087150 (TUNGALOY CORP); | [Y]JP2008238393 (SECO TOOLS AB); | [Y]JP2009095907 (SUMITOMO ELEC HARDMETAL CORP); | [Y]WO2009107648 (KYOCERA CORP [JP], et al); | [Y]JP2009202264 (KYOCERA CORP) | by applicant | JPH06316758 | - "The effect of reaction condition on the crystallographic orientation and surface morphology of chemical vapor deposited A1203", CHUL-SOON PARK ET AL., Proceedings of the 4th European Conference on Chemical Vapour Deposition, PHILIPS CENTRE MANUF. TECHNOL, (1983), pages 410 - 420 | Opposition | EP0753603 | EP1655388 | EP1897970 | EP1905870 | EP2014789 | JP2009202264 | - S. RUPPI, "Enhanced performance of alpha-Al2O3 coatings by control of crystal orientation", Surface & Coatings Technology, (20080000), vol. 202, pages 4257 - 4269, XP022663878 DOI: http://dx.doi.org/10.1016/j.surfcoat.2008.03.021 | - S. RUPPI, "Deposition, microstructure and properties of texture-controlled CVD alpha-Al2O3 coatings", International Journal of Refractory Metals & Hard Materials, (20050000), vol. 23, pages 306 - 316, XP005036995 | - M. FALLQVIST et al., "Abrasive wear of texture-controlled CVD alpha-Al2O3 coatings", Surface & Coatings Technology, (20070000), vol. 202, pages 837 - 843, XP022342024 DOI: http://dx.doi.org/10.1016/j.surfcoat.2007.06.063 |