EP2502664 - WATER FILTERING DEVICE EQUIPPED WITH WATER LEVEL ADJUSTMENT UNIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.12.2018 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 29.12.2017 | ||
Former | Grant of patent is intended Status updated on 22.12.2017 | ||
Former | Examination is in progress Status updated on 10.11.2017 | ||
Former | Grant of patent is intended Status updated on 05.07.2017 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | [2017/50] |
Former [2012/39] | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do, 443-742 / KR | Inventor(s) | 01 /
PARK, Joung-Soo 108-203 The Hyoja 100-1 Hyoja-dong 2-ga Wansan-gu Jeonju-si Jeollabuk-do 560-894 / KR | 02 /
PARK, Heung-Jun 202-1012 Hoban 2-cha Apt. Dosan-dong Gwangsan-gu Gwangju 506-020 / KR | 03 /
JOO, Sung-Tae 205-1705 Buyeong Apt. Sinchang-dong Gwangsan-gu Gwangju 506-306 / KR | 04 /
KIM, Min-Ha 103-1406 Umi Innosville Apt. 1012 Singa-dong Gwangsan-gu Gwangju 506-901 / KR | 05 /
YANG, Dong-Houn 101-1004 Solmoe Town Apt. 475-1 Naebang-dong Seo-gu Gwangju 502-808 / KR | 06 /
LEE, Jong-Kwon 103-402 Sinchang Buyeong Apt. Sinchang-dong Gwangsan-gu Gwangju 506-306 / KR | [2012/39] | Representative(s) | Hewett, Jonathan Michael Richard, et al Venner Shipley LLP 200 Aldersgate London EC1A 4HD / GB | [2014/41] |
Former [2012/39] | Walaski, Jan Filip, et al Venner Shipley LLP 200 Aldersgate London EC1A 4HD / GB | Application number, filing date | 10831698.5 | 21.04.2010 | [2018/05] | WO2010KR02486 | Priority number, date | KR20090111791 | 19.11.2009 Original published format: KR 20090111791 | [2012/39] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011062331 | Date: | 26.05.2011 | Language: | KO | [2011/21] | Type: | A1 Application with search report | No.: | EP2502664 | Date: | 26.09.2012 | Language: | EN | [2012/39] | Type: | B1 Patent specification | No.: | EP2502664 | Date: | 31.01.2018 | Language: | EN | [2018/05] | Search report(s) | International search report - published on: | KR | 26.05.2011 | (Supplementary) European search report - dispatched on: | EP | 16.07.2014 | Classification | IPC: | B01D47/00, B01D46/00, A47L1/05, A47L1/08, A47L9/18, A47L11/40 | [2014/33] | CPC: |
B01D47/024 (EP,KR,US);
A47L1/05 (KR);
A47L11/4016 (EP,KR,US);
A47L11/4025 (EP,KR,US);
A47L9/18 (EP,KR,US);
A47L9/181 (EP,US);
A47L9/182 (EP,US);
A47L9/187 (EP,KR,US);
B01D46/2411 (EP,KR,US);
|
Former IPC [2012/39] | B01D47/00, B01D46/00, A47L1/05, A47L1/08 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/39] | Extension states | AL | Not yet paid | BA | Not yet paid | ME | Not yet paid | RS | Not yet paid | Title | German: | WASSERFILTRIERVORRICHTUNG MIT EINHEIT ZUR WASSERSTANDSREGULIERUNG | [2012/39] | English: | WATER FILTERING DEVICE EQUIPPED WITH WATER LEVEL ADJUSTMENT UNIT | [2012/39] | French: | DISPOSITIF DE FILTRATION D'EAU ÉQUIPÉ D'UNE UNITÉ D'AJUSTEMENT DU NIVEAU D'EAU | [2012/39] | Entry into regional phase | 29.03.2012 | Translation filed | 29.03.2012 | National basic fee paid | 29.03.2012 | Search fee paid | 29.03.2012 | Designation fee(s) paid | 29.03.2012 | Examination fee paid | Examination procedure | 29.03.2012 | Examination requested [2012/39] | 09.12.2014 | Amendment by applicant (claims and/or description) | 22.07.2015 | Despatch of a communication from the examining division (Time limit: M04) | 30.11.2015 | Reply to a communication from the examining division | 02.05.2016 | Despatch of a communication from the examining division (Time limit: M02) | 12.07.2016 | Reply to a communication from the examining division | 06.07.2017 | Communication of intention to grant the patent | 31.10.2017 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 31.10.2017 | Fee for grant paid | 31.10.2017 | Fee for publishing/printing paid | 21.12.2017 | Information about intention to grant a patent | 21.12.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | EP14198842.8 / EP2857083 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 22.07.2015 | Opposition(s) | 02.11.2018 | No opposition filed within time limit [2019/02] | Fees paid | Renewal fee | 27.04.2012 | Renewal fee patent year 03 | 17.04.2013 | Renewal fee patent year 04 | 25.03.2014 | Renewal fee patent year 05 | 17.04.2015 | Renewal fee patent year 06 | 18.04.2016 | Renewal fee patent year 07 | 18.04.2017 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.04.2010 | AT | 31.01.2018 | CY | 31.01.2018 | CZ | 31.01.2018 | DK | 31.01.2018 | EE | 31.01.2018 | ES | 31.01.2018 | FI | 31.01.2018 | HR | 31.01.2018 | IT | 31.01.2018 | LT | 31.01.2018 | LV | 31.01.2018 | MC | 31.01.2018 | MK | 31.01.2018 | NL | 31.01.2018 | PL | 31.01.2018 | PT | 31.01.2018 | RO | 31.01.2018 | SE | 31.01.2018 | SI | 31.01.2018 | SK | 31.01.2018 | SM | 31.01.2018 | TR | 31.01.2018 | IE | 21.04.2018 | LU | 21.04.2018 | MT | 21.04.2018 | BE | 30.04.2018 | BG | 30.04.2018 | CH | 30.04.2018 | FR | 30.04.2018 | LI | 30.04.2018 | NO | 30.04.2018 | GR | 01.05.2018 | IS | 31.05.2018 | [2020/31] |
Former [2020/27] | HU | 21.04.2010 | |
AT | 31.01.2018 | ||
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
IT | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
PT | 31.01.2018 | ||
RO | 31.01.2018 | ||
SE | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
TR | 31.01.2018 | ||
IE | 21.04.2018 | ||
LU | 21.04.2018 | ||
MT | 21.04.2018 | ||
BE | 30.04.2018 | ||
BG | 30.04.2018 | ||
CH | 30.04.2018 | ||
FR | 30.04.2018 | ||
LI | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2020/16] | AT | 31.01.2018 | |
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
IT | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
SE | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
TR | 31.01.2018 | ||
IE | 21.04.2018 | ||
LU | 21.04.2018 | ||
MT | 21.04.2018 | ||
BE | 30.04.2018 | ||
BG | 30.04.2018 | ||
CH | 30.04.2018 | ||
FR | 30.04.2018 | ||
LI | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2020/08] | AT | 31.01.2018 | |
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
IT | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
SE | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
IE | 21.04.2018 | ||
LU | 21.04.2018 | ||
MT | 21.04.2018 | ||
BE | 30.04.2018 | ||
BG | 30.04.2018 | ||
CH | 30.04.2018 | ||
FR | 30.04.2018 | ||
LI | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2019/23] | AT | 31.01.2018 | |
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
IT | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
SE | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
IE | 21.04.2018 | ||
LU | 21.04.2018 | ||
BE | 30.04.2018 | ||
BG | 30.04.2018 | ||
CH | 30.04.2018 | ||
FR | 30.04.2018 | ||
LI | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2019/19] | AT | 31.01.2018 | |
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
IT | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
SE | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
IE | 21.04.2018 | ||
LU | 21.04.2018 | ||
BE | 30.04.2018 | ||
BG | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2019/12] | AT | 31.01.2018 | |
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
IT | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
SE | 31.01.2018 | ||
SI | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
LU | 21.04.2018 | ||
BE | 30.04.2018 | ||
BG | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2019/08] | AT | 31.01.2018 | |
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
IT | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
SE | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
LU | 21.04.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/52] | AT | 31.01.2018 | |
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
IT | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
MC | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
SE | 31.01.2018 | ||
SK | 31.01.2018 | ||
SM | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/51] | AT | 31.01.2018 | |
CZ | 31.01.2018 | ||
DK | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
IT | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
SE | 31.01.2018 | ||
SK | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/50] | AT | 31.01.2018 | |
CZ | 31.01.2018 | ||
EE | 31.01.2018 | ||
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
IT | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
RO | 31.01.2018 | ||
SE | 31.01.2018 | ||
SK | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/47] | AT | 31.01.2018 | |
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
IT | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
SE | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/40] | AT | 31.01.2018 | |
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
SE | 31.01.2018 | ||
BG | 30.04.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/39] | AT | 31.01.2018 | |
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
LV | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
SE | 31.01.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/38] | AT | 31.01.2018 | |
ES | 31.01.2018 | ||
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
IS | 31.05.2018 | ||
Former [2018/37] | ES | 31.01.2018 | |
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
NO | 30.04.2018 | ||
GR | 01.05.2018 | ||
Former [2018/36] | ES | 31.01.2018 | |
FI | 31.01.2018 | ||
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
NL | 31.01.2018 | ||
PL | 31.01.2018 | ||
NO | 30.04.2018 | ||
Former [2018/35] | FI | 31.01.2018 | |
HR | 31.01.2018 | ||
LT | 31.01.2018 | ||
NL | 31.01.2018 | ||
NO | 30.04.2018 | Documents cited: | Search | [A]EP0951856 (CAPRARO VITTORIO [IT], et al) [A] 1-8* paragraph [0037]; figures 1,11 *; | [X]US2001045399 (BURROWS DAVID O [US]) [X] 1 * paragraph [0036]; figure 4 *; | [X]WO2004075710 (KRIMAN BORIS [RU]) [X] 1,5 * abstract * | International search | [A]KR920010684B (GOLD STAR CO [KR]); | [A]KR200331829Y (CHO, JUNG SUN); | [A]KR100800655B (KIM, JONG GI); | [A]KR20080114668 (HWANG SOON LIM [KR]) | by applicant | KR0113197Y | KR20080114668 |