EP2523900 - HYDROGEN PEROXIDE COMPOSITIONS AND THEIR USES [Right-click to bookmark this link] | |||
Former [2012/47] | HYDROGEN PEROXIDE COMPOSITIONS AND CLEANING FORMULATIONS PREPARED THEREFROM | ||
[2020/08] | Status | No opposition filed within time limit Status updated on 21.05.2021 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 12.06.2020 | ||
Former | Grant of patent is intended Status updated on 26.02.2020 | ||
Former | Examination is in progress Status updated on 04.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states ARKEMA INC. 900 First Avenue, Bldg. 4-2 King of Prussia PA 19406 / US | [2020/29] |
Former [2013/12] | For all designated states ARKEMA INC. 900 First Avenue, Bldg. 4-2. King of Prussia PA 19406 / US | ||
Former [2012/47] | For all designated states Arkema, Inc. 900 First Avenue King of Prussia, PA 19406 / US | Inventor(s) | 01 /
ZHU, Shui-Ping 305 Valley View Lane Berwyn Pennsylvania 19312 / US | 02 /
CARSON, Stephen W. 1115 Sunset Drive Coatesville Pennsylvania 19320 / US | 03 /
GENCO, Keith R. 695 Old Airport Road Douglasville Pennsylvania 19518 / US | [2012/47] | Representative(s) | Arkema Patent Arkema France DRD-DPI 420, rue d'Estienne d'Orves 92705 Colombes Cedex / FR | [N/P] |
Former [2020/29] | Gorintin, Sarah, et al ARKEMA France Département Propriété Industrielle 420, rue d'Estienne d'Orves 92705 Colombes Cedex / FR | ||
Former [2012/47] | Lhoste, Catherine ARKEMA FRANCE Département Propriété Industrielle 420 Rue d'Estienne d'Orves 92705 Colombes Cedex / FR | Application number, filing date | 10843540.5 | 21.12.2010 | [2020/29] | WO2010US61528 | Priority number, date | US20100294233P | 12.01.2010 Original published format: US 294233 P | [2012/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011087786 | Date: | 21.07.2011 | Language: | EN | [2011/29] | Type: | A1 Application with search report | No.: | EP2523900 | Date: | 21.11.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.07.2011 takes the place of the publication of the European patent application. | [2012/47] | Type: | B1 Patent specification | No.: | EP2523900 | Date: | 15.07.2020 | Language: | EN | [2020/29] | Search report(s) | International search report - published on: | US | 21.07.2011 | (Supplementary) European search report - dispatched on: | EP | 21.08.2013 | Classification | IPC: | C01B15/037, D06L4/12 | [2020/07] | CPC: |
C01B15/037 (EP,US);
D06L4/12 (EP,US)
|
Former IPC [2013/38] | C01B15/037, D06L3/02 | ||
Former IPC [2012/47] | C01B15/01 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | WASSERSTOFFPEROXIDZUSAMMENSETZUNGEN UND DESSEN VERWENDUNGEN | [2020/08] | English: | HYDROGEN PEROXIDE COMPOSITIONS AND THEIR USES | [2020/08] | French: | COMPOSITIONS DE PEROXYDE D'HYDROGÈNE ET LEURS UTILISATIONS | [2020/08] |
Former [2012/47] | WASSERSTOFFPEROXIDZUSAMMENSETZUNGEN UND DARAUS HERGESTELLTE REINIGUNGSFORMULIERUNGEN | ||
Former [2012/47] | HYDROGEN PEROXIDE COMPOSITIONS AND CLEANING FORMULATIONS PREPARED THEREFROM | ||
Former [2012/47] | COMPOSITIONS DE PEROXYDE D'HYDROGÈNE ET FORMULATIONS NETTOYANTES PRÉPARÉES À PARTIR DE CELLES-CI | Entry into regional phase | 04.07.2012 | National basic fee paid | 04.07.2012 | Search fee paid | 04.07.2012 | Designation fee(s) paid | 04.07.2012 | Examination fee paid | Examination procedure | 04.07.2012 | Examination requested [2012/47] | 13.03.2014 | Amendment by applicant (claims and/or description) | 26.10.2016 | Despatch of a communication from the examining division (Time limit: M06) | 19.04.2017 | Reply to a communication from the examining division | 21.02.2019 | Despatch of a communication from the examining division (Time limit: M06) | 30.08.2019 | Reply to a communication from the examining division | 27.02.2020 | Communication of intention to grant the patent | 03.06.2020 | Fee for grant paid | 03.06.2020 | Fee for publishing/printing paid | 03.06.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.10.2016 | Opposition(s) | 16.04.2021 | No opposition filed within time limit [2021/25] | Fees paid | Renewal fee | 11.12.2012 | Renewal fee patent year 03 | 12.12.2013 | Renewal fee patent year 04 | 11.12.2014 | Renewal fee patent year 05 | 10.12.2015 | Renewal fee patent year 06 | 13.12.2016 | Renewal fee patent year 07 | 12.12.2017 | Renewal fee patent year 08 | 12.12.2018 | Renewal fee patent year 09 | 13.12.2019 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.12.2010 | AL | 15.07.2020 | AT | 15.07.2020 | CY | 15.07.2020 | CZ | 15.07.2020 | DK | 15.07.2020 | EE | 15.07.2020 | FI | 15.07.2020 | HR | 15.07.2020 | LT | 15.07.2020 | LV | 15.07.2020 | MC | 15.07.2020 | MK | 15.07.2020 | MT | 15.07.2020 | PL | 15.07.2020 | RO | 15.07.2020 | RS | 15.07.2020 | SE | 15.07.2020 | SI | 15.07.2020 | SK | 15.07.2020 | SM | 15.07.2020 | TR | 15.07.2020 | BG | 15.10.2020 | NO | 15.10.2020 | GR | 16.10.2020 | IS | 15.11.2020 | PT | 16.11.2020 | GB | 21.12.2020 | IE | 21.12.2020 | CH | 31.12.2020 | LI | 31.12.2020 | [2022/32] |
Former [2022/27] | HU | 21.12.2010 | |
AL | 15.07.2020 | ||
AT | 15.07.2020 | ||
CY | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
MT | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
TR | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
GB | 21.12.2020 | ||
IE | 21.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/26] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
TR | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
GB | 21.12.2020 | ||
IE | 21.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/23] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
GB | 21.12.2020 | ||
IE | 21.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/10] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
PT | 16.11.2020 | ||
GB | 21.12.2020 | ||
IE | 21.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/52] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
GB | 21.12.2020 | ||
IE | 21.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/49] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
GB | 21.12.2020 | ||
IE | 21.12.2020 | ||
Former [2021/46] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
IE | 21.12.2020 | ||
Former [2021/40] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
MC | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/36] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SI | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/28] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SK | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/25] | AL | 15.07.2020 | |
AT | 15.07.2020 | ||
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/23] | AT | 15.07.2020 | |
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
SM | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/22] | AT | 15.07.2020 | |
CZ | 15.07.2020 | ||
DK | 15.07.2020 | ||
EE | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
PL | 15.07.2020 | ||
RO | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/20] | AT | 15.07.2020 | |
DK | 15.07.2020 | ||
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
PL | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/10] | AT | 15.07.2020 | |
FI | 15.07.2020 | ||
HR | 15.07.2020 | ||
LT | 15.07.2020 | ||
LV | 15.07.2020 | ||
PL | 15.07.2020 | ||
RS | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
IS | 15.11.2020 | ||
PT | 16.11.2020 | ||
Former [2021/09] | AT | 15.07.2020 | |
FI | 15.07.2020 | ||
LT | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
GR | 16.10.2020 | ||
PT | 16.11.2020 | ||
Former [2021/08] | FI | 15.07.2020 | |
LT | 15.07.2020 | ||
SE | 15.07.2020 | ||
BG | 15.10.2020 | ||
NO | 15.10.2020 | ||
PT | 16.11.2020 | ||
Former [2021/07] | FI | 15.07.2020 | |
LT | 15.07.2020 | ||
NO | 15.10.2020 | Documents cited: | Search | [XI]US2005226800 (WANG XUE [US], et al) [X] 1-7,9,11-24 * abstract * * paragraphs [0018] - [0024] - [0 28] , [0029] , [0 32] - [0035] - [0037] , [0 38] * * claim - * [I] 8,10; | [X]US2006009371 (WANG XUE [US], et al) [X] 1-7,9,11-24 * paragraphs [0006] - [0013] - [0 24] - [0029] - [0032] *; | [X]US2007087954 (WANG XUE [US], et al) [X] 1-7,9,11-24* paragraphs [0031] - [0048] * | International search | [A]US4534945 (HOPKINS QUENTIN G [US], et al); | [Y]US5736497 (STEINER NORBERT N [US]); | [A]US2002031556 (LINDAHL AKE R [SE]); | [A]US6506314 (WHITNEY JR DICKSON L [US], et al); | [A]US2005226800 (WANG XUE [US], et al); | [A]US2007059380 (RAMIREZ JOSE A [US], et al); | [A]US2007166398 (BOBBERT ILJA [NL]); | [X]US2008044343 (EDVINSSON-ALBERS ROLF [SE], et al) |