blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2355413

EP2355413 - Cable set-top box with integrated cable tuner and MOCA support [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.07.2020
Database last updated on 16.11.2024
FormerThe patent has been granted
Status updated on  21.06.2019
FormerGrant of patent is intended
Status updated on  14.02.2019
FormerExamination is in progress
Status updated on  20.01.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Avago Technologies International Sales Pte. Limited
1 Yishun Avenue 7
Singapore 768923 / SG
[2018/52]
Former [2017/25]For all designated states
Avago Technologies General IP (Singapore) Pte. Ltd.
1 Yishun Avenue 7
Singapore 768923 / SG
Former [2011/32]For all designated states
Broadcom Corporation
5300 California Avenue
Irvine, CA 92617 / US
Inventor(s)01 / Kuo, Jonathan
10 Fawnridge Place
CA 92656 Aliso Viejo / US
02 / Tran, Phong Thanh
12 Shadow Glen
CA 92620 Irvine / US
 [2011/32]
Representative(s)Bosch Jehle Patentanwaltsgesellschaft mbH
Flüggenstraße 13
80639 München / DE
[2019/30]
Former [2011/32]Jehle, Volker Armin
Bosch Jehle Patentanwaltsgesellschaft mbH Flüggenstrasse 13
80639 München / DE
Application number, filing date11000865.303.02.2011
[2011/32]
Priority number, dateUS20100302817P09.02.2010         Original published format: US 302817 P
US2010082993602.07.2010         Original published format: US 829936
[2011/32]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2355413
Date:10.08.2011
Language:EN
[2011/32]
Type: A3 Search report 
No.:EP2355413
Date:24.08.2011
[2011/34]
Type: B1 Patent specification 
No.:EP2355413
Date:24.07.2019
Language:EN
[2019/30]
Search report(s)(Supplementary) European search report - dispatched on:EP22.07.2011
ClassificationIPC:H04L12/28, H04N5/00
[2011/32]
CPC:
H04L12/2801 (EP,US); H04L12/2834 (EP,US); H04N21/43615 (EP,US);
H04N21/6118 (EP,US); H04N21/6168 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/30]
Former [2011/32]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Kabelfernsehen-Digitalempfänger mit integriertem Kabelfernsehtuner und MOCA-Unterstützung[2011/32]
English:Cable set-top box with integrated cable tuner and MOCA support[2011/32]
French:Boîte de configuration de câble avec syntoniseur de câble intégré et support MOCA[2011/32]
Examination procedure22.02.2012Amendment by applicant (claims and/or description)
24.02.2012Examination requested  [2012/14]
21.03.2013Despatch of a communication from the examining division (Time limit: M04)
16.07.2013Reply to a communication from the examining division
21.01.2016Despatch of a communication from the examining division (Time limit: M04)
04.04.2016Reply to a communication from the examining division
14.09.2016Despatch of a communication from the examining division (Time limit: M06)
20.03.2017Reply to a communication from the examining division
31.01.2019Date of oral proceedings
12.02.2019Minutes of oral proceedings despatched
15.02.2019Communication of intention to grant the patent
06.06.2019Fee for grant paid
06.06.2019Fee for publishing/printing paid
06.06.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  21.03.2013
Opposition(s)03.06.2020No opposition filed within time limit [2020/33]
Fees paidRenewal fee
28.02.2013Renewal fee patent year 03
28.02.2014Renewal fee patent year 04
02.03.2015Renewal fee patent year 05
29.02.2016Renewal fee patent year 06
28.02.2017Renewal fee patent year 07
28.02.2018Renewal fee patent year 08
28.02.2019Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU03.02.2011
AL24.07.2019
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
MK24.07.2019
MT24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
GB03.02.2020
IE03.02.2020
LU03.02.2020
BE29.02.2020
CH29.02.2020
FR29.02.2020
LI29.02.2020
[2022/32]
Former [2022/27]HU03.02.2011
AL24.07.2019
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
MT24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
GB03.02.2020
IE03.02.2020
LU03.02.2020
BE29.02.2020
CH29.02.2020
FR29.02.2020
LI29.02.2020
Former [2021/10]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
GB03.02.2020
IE03.02.2020
LU03.02.2020
BE29.02.2020
CH29.02.2020
FR29.02.2020
LI29.02.2020
Former [2021/08]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
GB03.02.2020
IE03.02.2020
LU03.02.2020
CH29.02.2020
FR29.02.2020
LI29.02.2020
Former [2021/07]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
IE03.02.2020
LU03.02.2020
CH29.02.2020
FR29.02.2020
LI29.02.2020
Former [2020/52]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
LU03.02.2020
CH29.02.2020
LI29.02.2020
Former [2020/49]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
LU03.02.2020
Former [2020/48]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
LU03.02.2020
Former [2020/37]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/36]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/27]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/25]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/24]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/23]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
IT24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/22]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/17]AL24.07.2019
AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/15]AL24.07.2019
AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/12]AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/11]AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
Former [2020/10]AT24.07.2019
FI24.07.2019
LT24.07.2019
NL24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
PT25.11.2019
Former [2020/09]FI24.07.2019
LT24.07.2019
NL24.07.2019
NO24.10.2019
Former [2020/08]LT24.07.2019
NL24.07.2019
NO24.10.2019
Former [2020/07]NL24.07.2019
Documents cited:Search[X]US2006117371  (MARGULIS NEAL [US]) [X] 1-4 * abstract * * figure 6 * * paragraph [0074] *;
 [XP]WO2010087913  (THOMSON LICENSING LLC [FR], et al) [XP] 1 * abstract * * page 11, line 8 - line 25 *;
 [A]US2007217436  (MARKLEY JEFFREY P [US], et al) [A] 1-4 * abstract * * figure 3 * * paragraph [0154] *;
 [A]EP2073541  (BROADCOM CORP [US]) [A] 1-4 * abstract * * paragraph [0013] - paragraph [0032] *
ExaminationUS2006090084
 US2008043781
by applicantUS20170613028
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.