EP2392867 - Information system based on a heating system with local supply pumps and method for using the information system [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.11.2020 Database last updated on 03.01.2025 | |
Former | The patent has been granted Status updated on 05.12.2019 | ||
Former | Grant of patent is intended Status updated on 25.07.2019 | ||
Former | Examination is in progress Status updated on 16.05.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states METRONA Union GmbH Aidenbachstrasse 40 81379 München / DE | [2019/21] |
Former [2011/49] | For all designated states METRONA WÄRMEMESSER UNION GMBH Aidenbachstrasse 40 81379 München / DE | Inventor(s) | 01 /
Schröder, Franz Dr. Kornblumenweg 8 82054 Sauerlach / DE | 02 /
Heckmann, Dieter Argelsriederstr. 40 81475 München / DE | [2019/36] |
Former [2011/49] | 01 /
* * * | ||
02 /
* * * | Representative(s) | Prinz & Partner mbB Patent- und Rechtsanwälte Rundfunkplatz 2 80335 München / DE | [2020/01] |
Former [2011/49] | Prinz & Partner Patentanwälte Rundfunkplatz 2 80335 München / DE | Application number, filing date | 11003877.5 | 11.05.2011 | [2011/49] | Priority number, date | DE20101022213 | 20.05.2010 Original published format: DE102010022213 | [2011/49] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2392867 | Date: | 07.12.2011 | Language: | DE | [2011/49] | Type: | A3 Search report | No.: | EP2392867 | Date: | 03.09.2014 | Language: | DE | [2014/36] | Type: | B1 Patent specification | No.: | EP2392867 | Date: | 01.01.2020 | Language: | DE | [2020/01] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 05.08.2014 | Classification | IPC: | F24D19/10 | [2011/49] | CPC: |
F24D19/1009 (EP,US);
F24D19/1048 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/01] |
Former [2011/49] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Informationssystem, basierend auf einem Heizsystem mit lokalen Versorgungspumpen, und Verfahren zur Nutzung des Informationssystems | [2011/49] | English: | Information system based on a heating system with local supply pumps and method for using the information system | [2011/49] | French: | Système d'information basé sur un système de chauffage avec des pompes d'alimentation locale, et procédé d'utilisation du système d'information | [2011/49] | Examination procedure | 30.01.2015 | Amendment by applicant (claims and/or description) | 30.01.2015 | Examination requested [2015/11] | 23.10.2015 | Despatch of a communication from the examining division (Time limit: M04) | 23.02.2016 | Reply to a communication from the examining division | 08.05.2017 | Despatch of a communication from the examining division (Time limit: M04) | 31.08.2017 | Reply to a communication from the examining division | 26.07.2019 | Communication of intention to grant the patent | 26.11.2019 | Fee for grant paid | 26.11.2019 | Fee for publishing/printing paid | 26.11.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.10.2015 | Opposition(s) | 02.10.2020 | No opposition filed within time limit [2020/50] | Fees paid | Renewal fee | 29.05.2013 | Renewal fee patent year 03 | 02.06.2014 | Renewal fee patent year 04 | 20.05.2015 | Renewal fee patent year 05 | 31.03.2016 | Renewal fee patent year 06 | 30.05.2017 | Renewal fee patent year 07 | 28.05.2018 | Renewal fee patent year 08 | 15.05.2019 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.05.2011 | AL | 01.01.2020 | CY | 01.01.2020 | CZ | 01.01.2020 | DK | 01.01.2020 | EE | 01.01.2020 | ES | 01.01.2020 | FI | 01.01.2020 | HR | 01.01.2020 | IT | 01.01.2020 | LT | 01.01.2020 | LV | 01.01.2020 | MC | 01.01.2020 | MK | 01.01.2020 | MT | 01.01.2020 | NL | 01.01.2020 | PL | 01.01.2020 | RO | 01.01.2020 | RS | 01.01.2020 | SE | 01.01.2020 | SI | 01.01.2020 | SK | 01.01.2020 | SM | 01.01.2020 | TR | 01.01.2020 | BG | 01.04.2020 | NO | 01.04.2020 | GR | 02.04.2020 | IS | 01.05.2020 | AT | 11.05.2020 | GB | 11.05.2020 | IE | 11.05.2020 | LU | 11.05.2020 | PT | 27.05.2020 | BE | 31.05.2020 | CH | 31.05.2020 | FR | 31.05.2020 | LI | 31.05.2020 | [2022/31] |
Former [2022/30] | HU | 11.05.2011 | |
AL | 01.01.2020 | ||
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MT | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
AT | 11.05.2020 | ||
GB | 11.05.2020 | ||
IE | 11.05.2020 | ||
LU | 11.05.2020 | ||
PT | 27.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2022/27] | HU | 11.05.2011 | |
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MT | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
AT | 11.05.2020 | ||
GB | 11.05.2020 | ||
IE | 11.05.2020 | ||
LU | 11.05.2020 | ||
PT | 27.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2022/26] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
AT | 11.05.2020 | ||
GB | 11.05.2020 | ||
IE | 11.05.2020 | ||
LU | 11.05.2020 | ||
PT | 27.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/37] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
AT | 11.05.2020 | ||
GB | 11.05.2020 | ||
IE | 11.05.2020 | ||
LU | 11.05.2020 | ||
PT | 27.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/23] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
GB | 11.05.2020 | ||
IE | 11.05.2020 | ||
LU | 11.05.2020 | ||
PT | 27.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/22] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
GB | 11.05.2020 | ||
IE | 11.05.2020 | ||
LU | 11.05.2020 | ||
PT | 27.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/20] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
IE | 11.05.2020 | ||
LU | 11.05.2020 | ||
PT | 27.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/15] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
LU | 11.05.2020 | ||
PT | 27.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/10] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/08] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2020/50] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/49] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/48] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/47] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/40] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/39] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/38] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/37] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
NO | 01.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/36] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
LT | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
NO | 01.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/35] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
LT | 01.01.2020 | ||
NL | 01.01.2020 | ||
NO | 01.04.2020 | ||
Former [2020/33] | NL | 01.01.2020 | Documents cited: | Search | [X]DE2247354 (BIENERT KARLHEINZ) [X] 1-10 * columns 3-6; figures 1, 2 *; | [X]EP0866279 (WILO GMBH [DE]) [X] 1-10 * columns 1-3; figure 1 *; | [X]EP2151578 (GRUNDFOS MANAGEMENT AS [DK]) [X] 1-10 * columns 4-13; figures 1, 2 *; | [E]EP2327971 (METRONA WAERMEMESSER UNION [DE]) [E] 1-10* columns 1-8; figure 1 * | Examination | - Wilo-Geniax Das ET AL, "Systemkomponenten und Zubehör Katalog Heizung", (20090220), pages 1 - 108, URL: http://www.majo.rs/page_files/page_97/A4-GENIAX 2009.pdf, (20170427), XP055367994 | by applicant | DE102006041345 | DE102008038441 |