Extract from the Register of European Patents

EP About this file: EP2434230

EP2434230 - Supporting and fixing structure for flat panels or photovoltaic modules in coplanar position, and that allows the water to be drained off [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  06.03.2015
Database last updated on 11.04.2026
Most recent event   Tooltip06.03.2015Application deemed to be withdrawnpublished on 08.04.2015  [2015/15]
Applicant(s)For all designated states
ENERGY RESOURCES S.p.a.
Corso Italia, 13
20122 Milano / IT
[2012/13]
Inventor(s)01 / Lucchetti, Luigi
Via Caucci, 3
60100 Ancona / IT
02 / Cappanera, Enrico
Via Capodistria, 4
60100 Ancona / IT
03 / Mainardi, Emanuele
Via Del Commercio, 38
60100 Ancona / IT
 [2012/13]
Representative(s)Statti, Francesco
c/o ISEA s.r.l. Via G. Carducci, 6
62012 Civitanova Marche (MC) / IT
[2012/13]
Application number, filing date11006994.526.08.2011
[2012/13]
Priority number, dateIT2010AN0015524.09.2010         Original published format: IT AN20100155
[2012/13]
Filing languageIT
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2434230
Date:28.03.2012
Language:EN
[2012/13]
Type: A3 Search report 
No.:EP2434230
Date:14.08.2013
Language:EN
[2013/33]
Search report(s)(Supplementary) European search report - dispatched on:EP17.07.2013
ClassificationIPC:F24J2/52, H01L31/042, F24J2/46
[2012/13]
CPC:
H02S20/23 (EP); F24S25/35 (EP); F24S25/37 (EP);
F24S25/63 (EP); F24S40/44 (EP); F24S2025/80 (EP);
Y02B10/10 (EP); Y02B10/20 (EP); Y02E10/47 (EP);
Y02E10/50 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2012/13]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:Halte- und Befestigungsstruktur für flache Kollektoren oder photovoltaische Module in planparalleler Position, die ein Ableiten des Wassers ermöglicht[2012/13]
English:Supporting and fixing structure for flat panels or photovoltaic modules in coplanar position, and that allows the water to be drained off[2012/13]
French:Support et fixation de structure pour panneaux plats ou modules photovoltaïques en position coplanaire et qui permet le drainage de l'eau[2012/13]
Examination procedure15.02.2014Application deemed to be withdrawn, date of legal effect  [2015/15]
22.10.2014Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2015/15]
Public notification(s)Noting of loss of rights pursuant to Rule 112(1) EPC (EPO Form 1097 dated 08-07-2014)
ENERGY RESOURCES S.p.a.
Corso Italia, 13
20122 Milano / IT
[2014/43]
Fees paidPenalty fee
Additional fee for renewal fee
31.08.201303   M06   Not yet paid
31.08.201404   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XY] JP2000234425  (GANTAN BEAUTY KOGYO KK et al.)
 [X] EP2187146  (BOECHERER HANS et al.)
 [XY] DE202007010520  (ALERIS ALUMINUM VOGT GMBH et al.)
 [X] WO2010055235  (POIVET ALAIN et al.)
 [A] DE202009005576  (WIDMAYR JOSEF et al.)
 [XY] DE202010002489  (ALTEC SOLARTECHNIK AG et al.) [X] 1,3-7 * abstract *[Y] 2
 [X] DE102008051902  (OELLER FRANZ et al.) [X] 1-7 * paragraphs [0022] - [0036]; figures 1,2 *
by applicantWO03007688
 WO2004055294
 EP2012365
 EP2034249
 WO2008145913
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.