EP2374482 - LOCK FOR STERILISATION CONTAINER [Right-click to bookmark this link] | |||
Former [2011/41] | Lock for sterilisation container | ||
[2018/44] | Status | No opposition filed within time limit Status updated on 13.03.2020 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 05.04.2019 | ||
Former | Grant of patent is intended Status updated on 14.10.2018 | ||
Former | Examination is in progress Status updated on 11.05.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Sterlab 2720, Chemin Saint Bernard 06220 Vallauris / FR | [2011/41] | Inventor(s) | 01 /
Martel, Paul Immeuble Hadrien Les Imperators 83700 St-Raphael / FR | 02 /
Karacha, Philippe 175 chemin du Château 06330 Roquefort-Les-Pins / FR | [2019/19] |
Former [2011/41] | 01 /
Martel, Paul Immeuble Hadrien Les Imperators 83700, ST-RAPHAEL / FR | ||
02 /
Karacha, Philippe 175 chemin du Château 06330, ROQUEFORT-LES-PINS / FR | Representative(s) | Novagraaf Technologies Bâtiment O2 2, rue Sarah Bernhardt CS90017 92665 Asnières-sur-Seine Cedex / FR | [2019/19] |
Former [2011/41] | Novagraaf Technologies 122 rue Edouard Vaillant 92593 Levallois-Perret Cedex / FR | Application number, filing date | 11160359.3 | 30.03.2011 | [2011/41] | Priority number, date | FR20100052701 | 09.04.2010 Original published format: FR 1052701 | [2011/41] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP2374482 | Date: | 12.10.2011 | Language: | FR | [2011/41] | Type: | B1 Patent specification | No.: | EP2374482 | Date: | 08.05.2019 | Language: | FR | [2019/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.07.2011 | Classification | IPC: | A61L2/26, A61B50/00 | [2018/44] | CPC: |
A61L2/26 (EP,US);
A61B50/00 (EP,US);
A61B2050/006 (EP,US);
A61L2202/121 (EP,US);
A61L2202/182 (EP,US);
G09F2003/0207 (US);
|
Former IPC [2011/41] | A61L2/26, A61B19/02, G09F3/03 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/19] |
Former [2011/41] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERSCHLUSS FÜR STERILISATIONSBEHÄLTER | [2018/44] | English: | LOCK FOR STERILISATION CONTAINER | [2018/44] | French: | DISPOSITIF DE SCELLÉ DE BOÎTE DE STÉRILISATION | [2018/45] |
Former [2011/41] | Verschluss für Sterilisationsbehälter | ||
Former [2011/41] | Lock for sterilisation container | ||
Former [2011/41] | Dispositif de scellé de boîte de stérilisation | Examination procedure | 27.01.2012 | Amendment by applicant (claims and/or description) | 27.01.2012 | Examination requested [2012/10] | 09.05.2018 | Despatch of a communication from the examining division (Time limit: M04) | 29.08.2018 | Reply to a communication from the examining division | 15.10.2018 | Communication of intention to grant the patent | 15.02.2019 | Fee for grant paid | 15.02.2019 | Fee for publishing/printing paid | 15.02.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.05.2018 | Opposition(s) | 11.02.2020 | No opposition filed within time limit [2020/16] | Fees paid | Renewal fee | 13.03.2013 | Renewal fee patent year 03 | 26.03.2014 | Renewal fee patent year 04 | 20.01.2015 | Renewal fee patent year 05 | 29.01.2016 | Renewal fee patent year 06 | 24.01.2017 | Renewal fee patent year 07 | 12.01.2018 | Renewal fee patent year 08 | 29.03.2019 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.03.2011 | AL | 08.05.2019 | AT | 08.05.2019 | CY | 08.05.2019 | CZ | 08.05.2019 | DK | 08.05.2019 | EE | 08.05.2019 | ES | 08.05.2019 | FI | 08.05.2019 | HR | 08.05.2019 | IT | 08.05.2019 | LT | 08.05.2019 | LV | 08.05.2019 | MC | 08.05.2019 | MK | 08.05.2019 | MT | 08.05.2019 | NL | 08.05.2019 | PL | 08.05.2019 | RO | 08.05.2019 | RS | 08.05.2019 | SE | 08.05.2019 | SI | 08.05.2019 | SK | 08.05.2019 | SM | 08.05.2019 | TR | 08.05.2019 | BG | 08.08.2019 | NO | 08.08.2019 | GR | 09.08.2019 | IS | 08.09.2019 | PT | 08.09.2019 | [2022/31] |
Former [2022/30] | HU | 30.03.2011 | |
AL | 08.05.2019 | ||
AT | 08.05.2019 | ||
CY | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
MT | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
TR | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
IS | 08.09.2019 | ||
PT | 08.09.2019 | ||
Former [2022/27] | HU | 30.03.2011 | |
AL | 08.05.2019 | ||
AT | 08.05.2019 | ||
CY | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
MT | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
TR | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/49] | AL | 08.05.2019 | |
AT | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
TR | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/25] | AL | 08.05.2019 | |
AT | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
TR | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/17] | AL | 08.05.2019 | |
AT | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
TR | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/14] | AL | 08.05.2019 | |
AT | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SK | 08.05.2019 | ||
SM | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/12] | AL | 08.05.2019 | |
AT | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SK | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/11] | AL | 08.05.2019 | |
AT | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
SK | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/10] | AL | 08.05.2019 | |
AT | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2020/09] | AL | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/51] | AL | 08.05.2019 | |
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
BG | 08.08.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/50] | AL | 08.05.2019 | |
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RS | 08.05.2019 | ||
SE | 08.05.2019 | ||
NO | 08.08.2019 | ||
GR | 09.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/49] | AL | 08.05.2019 | |
ES | 08.05.2019 | ||
FI | 08.05.2019 | ||
HR | 08.05.2019 | ||
LT | 08.05.2019 | ||
NL | 08.05.2019 | ||
SE | 08.05.2019 | ||
NO | 08.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/48] | ES | 08.05.2019 | |
FI | 08.05.2019 | ||
LT | 08.05.2019 | ||
SE | 08.05.2019 | ||
NO | 08.08.2019 | ||
PT | 08.09.2019 | ||
Former [2019/47] | ES | 08.05.2019 | |
FI | 08.05.2019 | ||
LT | 08.05.2019 | ||
NO | 08.08.2019 | Documents cited: | Search | [X]US4319776 (MOBERG SIGURD M) [X] 1-7 * figures 1,4 * * column 2, paragraph 2 *; | [X]US5522627 (SWIFT ALLAN W [US]) [X] 1-7 * column 5, paragraph 2 - paragraph 7; figures 7,8 *; | [X]EP0786753 (BROOKS CO E J [US]) [X] 1-7 * column 4, line 53 - column 5, line 7; figure 1 *; | [X]US2008236001 (HUENEFELD JAMES ALLEN [US]) [X] 1,2 * figure 12 ** claim 1 * | Examination | US5535491 | US5765885 | by applicant | US4319779 | US5522627 | EP0786753 |