EP2388212 - Cover for a large refuse container and large refuse container [Right-click to bookmark this link] | |||
Former [2011/47] | Cover for a waste container and waste container | ||
[2019/51] | Status | No opposition filed within time limit Status updated on 12.03.2021 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 03.04.2020 | ||
Former | Grant of patent is intended Status updated on 11.12.2019 | ||
Former | Examination is in progress Status updated on 20.03.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states ESE World B.V. Luxemburglaan 35 6199 AM Maastricht-Airport / NL | [2017/14] |
Former [2013/11] | For all designated states ESE World B.V. Horsterweg 18H 6199 AC Maastricht-Airport / NL | ||
Former [2011/47] | For all designated states Environmental Solutions Europe Holding B.V. Horsterweg 18 H 6199 AC Maastricht-Airport / NL | Inventor(s) | 01 /
Fröhlingsdorf, Udo Birkenweg 16 57462, Olpe / DE | [2011/47] | Representative(s) | Müller, Thomas, et al Patentanwalt emescon Balanstraße 57 81541 München / DE | [N/P] |
Former [2011/47] | Müller & Schubert Patentanwälte Innere Wiener Straße 13 81667 München / DE | Application number, filing date | 11163128.9 | 20.04.2011 | [2011/47] | Priority number, date | DE20101021170 | 21.05.2010 Original published format: DE102010021170 | [2011/47] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP2388212 | Date: | 23.11.2011 | Language: | DE | [2011/47] | Type: | B1 Patent specification | No.: | EP2388212 | Date: | 06.05.2020 | Language: | DE | [2020/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.09.2011 | Classification | IPC: | B65F1/16 | [2011/47] | CPC: |
B65F1/16 (EP);
B65F2001/1669 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/19] |
Former [2011/47] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Deckel für einen Müll-Großbehälter sowie Müll-Großbehälter | [2019/51] | English: | Cover for a large refuse container and large refuse container | [2019/51] | French: | Couvercle pour un récipient de grande capacité à déchets et récipient de grande capacité à déchets | [2019/51] |
Former [2011/47] | Deckel für einen Müllbehälter sowie Müllbehälter | ||
Former [2011/47] | Cover for a waste container and waste container | ||
Former [2011/47] | Couvercle pour un récipient à déchets et récipients à déchets | Examination procedure | 27.03.2012 | Amendment by applicant (claims and/or description) | 27.03.2012 | Examination requested [2012/19] | 28.04.2016 | Despatch of a communication from the examining division (Time limit: M06) | 14.09.2016 | Reply to a communication from the examining division | 08.03.2017 | Despatch of a communication from the examining division (Time limit: M06) | 20.10.2017 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 14.12.2017 | Reply to a communication from the examining division | 13.06.2018 | Despatch of a communication from the examining division (Time limit: M04) | 26.09.2018 | Reply to a communication from the examining division | 29.11.2018 | Despatch of a communication from the examining division (Time limit: M04) | 19.03.2019 | Reply to a communication from the examining division | 12.12.2019 | Communication of intention to grant the patent | 30.03.2020 | Fee for grant paid | 30.03.2020 | Fee for publishing/printing paid | 30.03.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.04.2016 | Opposition(s) | 09.02.2021 | No opposition filed within time limit [2021/15] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 14.12.2017 | Request for further processing filed | 14.12.2017 | Full payment received (date of receipt of payment) Request granted | 22.12.2017 | Decision despatched | Fees paid | Renewal fee | 29.04.2013 | Renewal fee patent year 03 | 26.03.2014 | Renewal fee patent year 04 | 29.04.2015 | Renewal fee patent year 05 | 30.03.2016 | Renewal fee patent year 06 | 28.04.2017 | Renewal fee patent year 07 | 26.04.2018 | Renewal fee patent year 08 | 30.04.2019 | Renewal fee patent year 09 | 20.03.2020 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.04.2011 | AL | 06.05.2020 | CY | 06.05.2020 | EE | 06.05.2020 | FI | 06.05.2020 | LT | 06.05.2020 | LV | 06.05.2020 | MC | 06.05.2020 | MK | 06.05.2020 | RO | 06.05.2020 | RS | 06.05.2020 | SI | 06.05.2020 | SK | 06.05.2020 | SM | 06.05.2020 | TR | 06.05.2020 | BG | 06.08.2020 | GR | 07.08.2020 | [2024/29] |
Former [2024/22] | HU | 20.04.2011 | |
AL | 06.05.2020 | ||
CY | 06.05.2020 | ||
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
MK | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
GR | 07.08.2020 | ||
Former [2023/29] | HU | 20.04.2011 | |
AL | 06.05.2020 | ||
CY | 06.05.2020 | ||
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
GR | 07.08.2020 | ||
Former [2023/24] | AL | 06.05.2020 | |
CY | 06.05.2020 | ||
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
GR | 07.08.2020 | ||
Former [2022/10] | AL | 06.05.2020 | |
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
GR | 07.08.2020 | ||
Former [2021/50] | AL | 06.05.2020 | |
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
Former [2021/24] | AL | 06.05.2020 | |
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
Former [2021/10] | AL | 06.05.2020 | |
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
Former [2021/09] | AL | 06.05.2020 | |
EE | 06.05.2020 | ||
FI | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
Former [2021/04] | AL | 06.05.2020 | |
FI | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
BG | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
Former [2021/01] | FI | 06.05.2020 | |
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
BG | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
Former [2020/51] | FI | 06.05.2020 | |
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
Former [2020/50] | FI | 06.05.2020 | |
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
Former [2020/48] | FI | 06.05.2020 | |
LT | 06.05.2020 | ||
IS | 06.09.2020 | ||
Former [2020/47] | LT | 06.05.2020 | |
IS | 06.09.2020 | ||
Former [2020/46] | IS | 06.09.2020 | Documents cited: | Search | [A]DE177434 (P. WINKLER) [A] 1-9* the whole document *; | [XA]GB2101680 (THETFORD COMPACTORS [GB]) [X] 1-5,7-9 * page 2, line 107 - line 123 * * page 3, line 88 - line 125 * * figures 1-5 * [A] 6; | [XA]DE9209923U (FRITZ SCHÄFER GMBH) [X] 1-5,7-9 * page 5, line 16 - page 6, line 26 * * page 8, line 1 - line 24 * * figures 1-3 * [A] 6; | [XA]DE19649777 (SCHILLER ROLF DIPL ING [DE]) [X] 1-5,7-9 * column 3, line 14 - line 41 * * figure 1 * [A] 6; | [XA]EP1760011 (SARTORI AMBIENTE SOCIETA A RES [IT]) [X] 1-5,7-9 * paragraph [0019] - paragraph [0024] * * paragraph [0030] - paragraph [0032] * * figures 1,2,5-8 * [A] 6 | by applicant | EP1354824 |