EP2527480 - NiFe binder with universal application [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 31.03.2017 Database last updated on 16.07.2024 | |
Former | Grant of patent is intended Status updated on 04.12.2016 | ||
Former | Examination is in progress Status updated on 11.11.2016 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states H.C. Starck Surface Technology and Ceramic Powders GmbH Landsberger Strasse 98 80339 München / DE | [2018/31] |
Former [2012/48] | For all designated states H.C. Starck GmbH Im Schleeke 78-91 38642 Goslar / DE | Inventor(s) | 01 /
Gries, Dr., Benno H.C. Starck GmbH An der Tongrube 10A 38302 Wolfenbüttel / DE | [2012/48] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [N/P] |
Former [2012/48] | Ambor, Volker H.C. Starck GmbH Patentabteilung Im Schleeke 78-91 38642 Goslar / DE | Application number, filing date | 11167901.5 | 27.05.2011 | [2012/48] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP2527480 | Date: | 28.11.2012 | Language: | DE | [2012/48] | Type: | B1 Patent specification | No.: | EP2527480 | Date: | 03.05.2017 | Language: | DE | [2017/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.11.2011 | Classification | IPC: | C22C29/00, C22C29/06 | [2012/48] | CPC: |
C22C19/00 (EP,US);
C22C29/06 (EP,KR,US);
B22F1/105 (EP,KR,US);
C22C29/00 (EP,KR,US);
C22C29/005 (EP,US);
C22C29/067 (EP,US);
C22C38/08 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/18] |
Former [2012/48] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | NiFe-Binder mit universeller Einsetzbarkeit | [2012/48] | English: | NiFe binder with universal application | [2012/48] | French: | Liant NiFe ayant une application universelle | [2012/48] | Examination procedure | 28.05.2013 | Examination requested [2013/28] | 04.07.2013 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 30.08.2013 | Amendment by applicant (claims and/or description) | 31.01.2014 | Despatch of a communication from the examining division (Time limit: M06) | 04.08.2014 | Reply to a communication from the examining division | 15.07.2016 | Despatch of a communication from the examining division (Time limit: M04) | 07.11.2016 | Reply to a communication from the examining division | 05.12.2016 | Communication of intention to grant the patent | 23.03.2017 | Fee for grant paid | 23.03.2017 | Fee for publishing/printing paid | 23.03.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 31.01.2014 | Opposition(s) | Opponent(s) | 01
01.02.2018
25.06.2018
WITHDRAWN Sandvik Machining Solutions AB Mossvägen 10 811 81 Sandviken / SE Opponent's representative Sandvik Sandvik Intellectual Property AB 811 81 Sandviken / SE | [2018/31] |
Former [2018/11] | |||
Opponent(s) | 01
01.02.2018
06.02.2018
ADMISSIBLE Sandvik Machining Solutions AB Mossvägen 10 811 81 Sandviken / SE Opponent's representative Sandvik Sandvik Intellectual Property AB 811 81 Sandviken / SE | 14.02.2018 | Invitation to proprietor to file observations on the notice of opposition | 25.06.2018 | Reply of patent proprietor to notice(s) of opposition | 21.09.2018 | Despatch of communication that the opposition procedure will be closed | 01.10.2018 | Legal effect of closure of opposition procedure [2019/06] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 30.08.2013 | Request for further processing filed | 30.08.2013 | Full payment received (date of receipt of payment) Request granted | 27.09.2013 | Decision despatched | Fees paid | Renewal fee | 31.05.2013 | Renewal fee patent year 03 | 02.06.2014 | Renewal fee patent year 04 | 01.06.2015 | Renewal fee patent year 05 | 31.05.2016 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.05.2011 | AL | 03.05.2017 | CY | 03.05.2017 | DK | 03.05.2017 | EE | 03.05.2017 | HR | 03.05.2017 | LT | 03.05.2017 | LV | 03.05.2017 | MC | 03.05.2017 | MK | 03.05.2017 | MT | 03.05.2017 | NL | 03.05.2017 | PT | 03.05.2017 | RO | 03.05.2017 | RS | 03.05.2017 | SI | 03.05.2017 | SK | 03.05.2017 | SM | 03.05.2017 | TR | 03.05.2017 | BE | 31.05.2017 | BG | 03.08.2017 | NO | 03.08.2017 | GR | 04.08.2017 | IS | 03.09.2017 | [2020/33] |
Former [2020/27] | HU | 27.05.2011 | |
CY | 03.05.2017 | ||
DK | 03.05.2017 | ||
EE | 03.05.2017 | ||
HR | 03.05.2017 | ||
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
MC | 03.05.2017 | ||
MK | 03.05.2017 | ||
MT | 03.05.2017 | ||
NL | 03.05.2017 | ||
PT | 03.05.2017 | ||
RO | 03.05.2017 | ||
RS | 03.05.2017 | ||
SI | 03.05.2017 | ||
SK | 03.05.2017 | ||
SM | 03.05.2017 | ||
TR | 03.05.2017 | ||
BE | 31.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2020/15] | HU | 27.05.2011 | |
CY | 03.05.2017 | ||
DK | 03.05.2017 | ||
EE | 03.05.2017 | ||
HR | 03.05.2017 | ||
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
MC | 03.05.2017 | ||
MK | 03.05.2017 | ||
MT | 03.05.2017 | ||
NL | 03.05.2017 | ||
RO | 03.05.2017 | ||
RS | 03.05.2017 | ||
SI | 03.05.2017 | ||
SK | 03.05.2017 | ||
SM | 03.05.2017 | ||
TR | 03.05.2017 | ||
BE | 31.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2019/51] | HU | 27.05.2011 | |
CY | 03.05.2017 | ||
DK | 03.05.2017 | ||
EE | 03.05.2017 | ||
HR | 03.05.2017 | ||
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
MC | 03.05.2017 | ||
MK | 03.05.2017 | ||
MT | 03.05.2017 | ||
NL | 03.05.2017 | ||
RO | 03.05.2017 | ||
RS | 03.05.2017 | ||
SI | 03.05.2017 | ||
SK | 03.05.2017 | ||
SM | 03.05.2017 | ||
BE | 31.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2019/46] | HU | 27.05.2011 | |
CY | 03.05.2017 | ||
DK | 03.05.2017 | ||
EE | 03.05.2017 | ||
HR | 03.05.2017 | ||
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
MC | 03.05.2017 | ||
MT | 03.05.2017 | ||
NL | 03.05.2017 | ||
RO | 03.05.2017 | ||
RS | 03.05.2017 | ||
SI | 03.05.2017 | ||
SK | 03.05.2017 | ||
SM | 03.05.2017 | ||
BE | 31.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2019/31] | HU | 27.05.2011 | |
DK | 03.05.2017 | ||
EE | 03.05.2017 | ||
HR | 03.05.2017 | ||
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
MC | 03.05.2017 | ||
MT | 03.05.2017 | ||
NL | 03.05.2017 | ||
RO | 03.05.2017 | ||
RS | 03.05.2017 | ||
SI | 03.05.2017 | ||
SK | 03.05.2017 | ||
SM | 03.05.2017 | ||
BE | 31.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2019/30] | DK | 03.05.2017 | |
EE | 03.05.2017 | ||
HR | 03.05.2017 | ||
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
MC | 03.05.2017 | ||
MT | 03.05.2017 | ||
NL | 03.05.2017 | ||
RO | 03.05.2017 | ||
RS | 03.05.2017 | ||
SI | 03.05.2017 | ||
SK | 03.05.2017 | ||
SM | 03.05.2017 | ||
BE | 31.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2018/43] | DK | 03.05.2017 | |
EE | 03.05.2017 | ||
HR | 03.05.2017 | ||
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
MT | 03.05.2017 | ||
NL | 03.05.2017 | ||
RO | 03.05.2017 | ||
RS | 03.05.2017 | ||
SI | 03.05.2017 | ||
SK | 03.05.2017 | ||
SM | 03.05.2017 | ||
BE | 31.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2018/39] | DK | 03.05.2017 | |
EE | 03.05.2017 | ||
HR | 03.05.2017 | ||
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
NL | 03.05.2017 | ||
RO | 03.05.2017 | ||
RS | 03.05.2017 | ||
SI | 03.05.2017 | ||
SK | 03.05.2017 | ||
SM | 03.05.2017 | ||
BE | 31.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2018/25] | DK | 03.05.2017 | |
EE | 03.05.2017 | ||
HR | 03.05.2017 | ||
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
NL | 03.05.2017 | ||
RO | 03.05.2017 | ||
RS | 03.05.2017 | ||
SI | 03.05.2017 | ||
SK | 03.05.2017 | ||
SM | 03.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2018/11] | DK | 03.05.2017 | |
EE | 03.05.2017 | ||
HR | 03.05.2017 | ||
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
NL | 03.05.2017 | ||
RO | 03.05.2017 | ||
RS | 03.05.2017 | ||
SK | 03.05.2017 | ||
SM | 03.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2018/10] | DK | 03.05.2017 | |
EE | 03.05.2017 | ||
HR | 03.05.2017 | ||
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
NL | 03.05.2017 | ||
RO | 03.05.2017 | ||
RS | 03.05.2017 | ||
SK | 03.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2018/09] | DK | 03.05.2017 | |
EE | 03.05.2017 | ||
HR | 03.05.2017 | ||
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
NL | 03.05.2017 | ||
RS | 03.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2017/52] | HR | 03.05.2017 | |
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
NL | 03.05.2017 | ||
RS | 03.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2017/50] | HR | 03.05.2017 | |
LT | 03.05.2017 | ||
LV | 03.05.2017 | ||
RS | 03.05.2017 | ||
BG | 03.08.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | ||
Former [2017/49] | HR | 03.05.2017 | |
LT | 03.05.2017 | ||
NO | 03.08.2017 | ||
GR | 04.08.2017 | ||
IS | 03.09.2017 | Documents cited: | Search | [XA]DE1938074 (DEUTSCHE EDELSTAHLWERKE AG) [X] 1-4,6-15 * column 2 * [A] 5; | [X]GB1330218 (CHROMALLOY AMERICAN CORP) [X] 1-15 * examples 1-6 *; | [A]WO02052054 (SECO TOOLS AB [SE], et al) [A] 1-15 * claims 1-5 *; | [A]US2005117984 (EASON JIMMY W [US], et al) [A] 1-15 * table 1 *; | [A]DE102007004937 (STARCK H C GMBH [DE]) [A] 1-15* paragraph [0019] * | by applicant | WO0212896 | EP1488020 | WO2010046224 | - L.PRAKASH, B.GRIES, PROCEEDINGS 17TH PLANSEE SEMINAR, (2009), vol. 2 | Opposition | JPS4990612 | US2002112896 | US6554885 | WO2006119522 | CN101560623 | US2010239855 | - FERNANDES et al., "Mechanical characterization of composites prepared from WC powders coated with Ni rich binders", International Journal of Refractory Metals & Hard Materials, (20080000), vol. 26, no. 5, pages 491 - 498, XP022701532 DOI: http://dx.doi.org/10.1016/j.ijrmhm.2007.12.001 |