EP2395248 - Connecting arrangement and method of fastening a bolt [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.04.2021 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 24.04.2020 | ||
Former | Grant of patent is intended Status updated on 16.12.2019 | ||
Former | Request for examination was made Status updated on 15.11.2019 | ||
Former | Grant of patent is intended Status updated on 01.07.2019 | ||
Former | Request for examination was made Status updated on 26.01.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | [2020/22] |
Former [2011/50] | For all designated states General Electric Company a New York Company 1 River Road Schenectady, NY 12345 / US | Inventor(s) | 01 /
Heide, Denis Josefine-Mauserstrasse 22 48157 Munster / DE | [2011/50] | Representative(s) | Zimmermann & Partner Patentanwälte mbB Postfach 330 920 80069 München / DE | [2020/22] |
Former [2011/50] | Bedford, Grant Richard Global Patent Operation - Europe GE International Inc. 15 John Adam Street London WC2N 6LU / GB | Application number, filing date | 11168616.8 | 02.06.2011 | [2011/50] | Priority number, date | US20100797860 | 10.06.2010 Original published format: US 797860 | [2011/50] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2395248 | Date: | 14.12.2011 | Language: | EN | [2011/50] | Type: | A3 Search report | No.: | EP2395248 | Date: | 19.07.2017 | Language: | EN | [2017/29] | Type: | B1 Patent specification | No.: | EP2395248 | Date: | 27.05.2020 | Language: | EN | [2020/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.06.2017 | Classification | IPC: | F16B2/14, F16B7/06, F16B21/16 | [2011/50] | CPC: |
F16B7/06 (EP,US);
F16B2/14 (EP,US);
F16B21/16 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/09] |
Former [2011/50] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verbindungsanordnung und Verfahren zur Befestigung einer Schraube | [2011/50] | English: | Connecting arrangement and method of fastening a bolt | [2011/50] | French: | Agencement de connexion et procédé de fixation d'un boulon | [2011/50] | Examination procedure | 02.06.2011 | Date on which the examining division has become responsible | 18.01.2018 | Amendment by applicant (claims and/or description) | 19.01.2018 | Examination requested [2018/09] | 02.07.2019 | Communication of intention to grant the patent | 11.11.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 17.12.2019 | Communication of intention to grant the patent | 16.04.2020 | Fee for grant paid | 16.04.2020 | Fee for publishing/printing paid | 16.04.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 02.07.2019 | Opposition(s) | 02.03.2021 | No opposition filed within time limit [2021/18] | Fees paid | Renewal fee | 01.07.2013 | Renewal fee patent year 03 | 30.06.2014 | Renewal fee patent year 04 | 30.06.2015 | Renewal fee patent year 05 | 30.06.2016 | Renewal fee patent year 06 | 30.06.2017 | Renewal fee patent year 07 | 02.07.2018 | Renewal fee patent year 08 | 21.06.2019 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.06.2011 | AL | 27.05.2020 | AT | 27.05.2020 | CY | 27.05.2020 | CZ | 27.05.2020 | EE | 27.05.2020 | FI | 27.05.2020 | HR | 27.05.2020 | IT | 27.05.2020 | LT | 27.05.2020 | LV | 27.05.2020 | MC | 27.05.2020 | MK | 27.05.2020 | MT | 27.05.2020 | NL | 27.05.2020 | PL | 27.05.2020 | RO | 27.05.2020 | RS | 27.05.2020 | SE | 27.05.2020 | SI | 27.05.2020 | SK | 27.05.2020 | SM | 27.05.2020 | TR | 27.05.2020 | IE | 02.06.2020 | LU | 02.06.2020 | BE | 30.06.2020 | CH | 30.06.2020 | LI | 30.06.2020 | FR | 27.07.2020 | BG | 27.08.2020 | GB | 27.08.2020 | NO | 27.08.2020 | GR | 28.08.2020 | IS | 27.09.2020 | PT | 28.09.2020 | [2022/32] |
Former [2022/27] | HU | 02.06.2011 | |
AL | 27.05.2020 | ||
AT | 27.05.2020 | ||
CY | 27.05.2020 | ||
CZ | 27.05.2020 | ||
EE | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
MT | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
TR | 27.05.2020 | ||
IE | 02.06.2020 | ||
LU | 02.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
FR | 27.07.2020 | ||
BG | 27.08.2020 | ||
GB | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2022/26] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
EE | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
TR | 27.05.2020 | ||
IE | 02.06.2020 | ||
LU | 02.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
FR | 27.07.2020 | ||
BG | 27.08.2020 | ||
GB | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/38] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
EE | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
IE | 02.06.2020 | ||
LU | 02.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
FR | 27.07.2020 | ||
BG | 27.08.2020 | ||
GB | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/23] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
EE | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
IE | 02.06.2020 | ||
LU | 02.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
FR | 27.07.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/20] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
EE | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
IE | 02.06.2020 | ||
LU | 02.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/15] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
EE | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
LU | 02.06.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/13] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
EE | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/10] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
EE | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/09] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
EE | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/04] | AL | 27.05.2020 | |
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/01] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/51] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/50] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/48] | FI | 27.05.2020 | |
LT | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/47] | LT | 27.05.2020 | |
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
Former [2020/46] | IS | 27.09.2020 | Documents cited: | Search | [A]US3361460 (GERHART JANSEN) [A] 1,8* column 2, line 3 - column 3, line 59; figures 1-4 *; | [XI]FR2207232 (PELISSIER YVAN [FR]) [X] 1-3,8,9 * page 2, line 10 - line 29; figures 1,2 * [I] 4-7; | [A]WO0182855 (INVACARE CORP [US]) [A] 1-9 * column 2, line 24 - line 56; figures 4,6 * |