EP2535454 - Washing machine [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.03.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 09.04.2021 | ||
Former | Grant of patent is intended Status updated on 17.12.2020 | ||
Former | Examination is in progress Status updated on 07.04.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Electrolux Home Products Corporation N.V. Raketstraat 40 1130 Brussels / BE | [2021/19] |
Former [2012/51] | For all designated states Electrolux Home Products Corporation N.V. Raketstraat 40 1130 Brussel / BE | Inventor(s) | 01 /
Bondi, Martino c/o Electrolux Italia S.p.A. Corso Lino Zanussi 30 33080 Porcia (PN) / IT | 02 /
De Michieli, Enrico c/o Electrolux Italia S.p.A. Corso Lino Zanussi 30 33080 Porcia (PN) / IT | [2012/51] | Representative(s) | Electrolux Group Patents AB Electrolux Group Patents S:t Göransgatan 143 105 45 Stockholm / SE | [N/P] |
Former [2021/19] | Electrolux Group Patents AB Electrolux Group Patents 105 45 Stockholm / SE | ||
Former [2012/51] | Nardoni, Andrea, et al Electrolux Italia S.p.A. Corso Lino Zanussi, 30 33080 Porcia (PN) / IT | Application number, filing date | 11169846.0 | 14.06.2011 | [2012/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2535454 | Date: | 19.12.2012 | Language: | EN | [2012/51] | Type: | B1 Patent specification | No.: | EP2535454 | Date: | 12.05.2021 | Language: | EN | [2021/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.11.2011 | Classification | IPC: | D06F39/08 | [2012/51] | CPC: |
D06F39/083 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/19] |
Former [2012/51] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Waschmaschine | [2012/51] | English: | Washing machine | [2012/51] | French: | Machine à laver | [2012/51] | Examination procedure | 17.06.2013 | Amendment by applicant (claims and/or description) | 19.06.2013 | Examination requested [2013/31] | 11.04.2017 | Despatch of a communication from the examining division (Time limit: M04) | 20.07.2017 | Reply to a communication from the examining division | 08.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 25.08.2020 | Reply to a communication from the examining division | 18.12.2020 | Communication of intention to grant the patent | 01.04.2021 | Fee for grant paid | 01.04.2021 | Fee for publishing/printing paid | 01.04.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.04.2017 | Opposition(s) | 15.02.2022 | No opposition filed within time limit [2022/16] | Fees paid | Renewal fee | 01.07.2013 | Renewal fee patent year 03 | 30.06.2014 | Renewal fee patent year 04 | 29.06.2015 | Renewal fee patent year 05 | 30.06.2016 | Renewal fee patent year 06 | 30.06.2017 | Renewal fee patent year 07 | 02.07.2018 | Renewal fee patent year 08 | 01.07.2019 | Renewal fee patent year 09 | 30.06.2020 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.06.2011 | AL | 12.05.2021 | AT | 12.05.2021 | CY | 12.05.2021 | CZ | 12.05.2021 | DK | 12.05.2021 | EE | 12.05.2021 | ES | 12.05.2021 | FI | 12.05.2021 | HR | 12.05.2021 | LT | 12.05.2021 | LV | 12.05.2021 | MC | 12.05.2021 | MK | 12.05.2021 | MT | 12.05.2021 | NL | 12.05.2021 | PL | 12.05.2021 | RO | 12.05.2021 | RS | 12.05.2021 | SE | 12.05.2021 | SI | 12.05.2021 | SK | 12.05.2021 | SM | 12.05.2021 | TR | 12.05.2021 | IE | 14.06.2021 | LU | 14.06.2021 | BE | 30.06.2021 | CH | 30.06.2021 | LI | 30.06.2021 | BG | 12.08.2021 | NO | 12.08.2021 | GR | 13.08.2021 | IS | 12.09.2021 | PT | 13.09.2021 | [2024/41] |
Former [2024/29] | HU | 14.06.2011 | |
AL | 12.05.2021 | ||
AT | 12.05.2021 | ||
CY | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
MK | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
TR | 12.05.2021 | ||
IE | 14.06.2021 | ||
LU | 14.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2024/22] | HU | 14.06.2011 | |
AL | 12.05.2021 | ||
AT | 12.05.2021 | ||
CY | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
MK | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
IE | 14.06.2021 | ||
LU | 14.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2023/29] | HU | 14.06.2011 | |
AL | 12.05.2021 | ||
AT | 12.05.2021 | ||
CY | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
IE | 14.06.2021 | ||
LU | 14.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2023/24] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CY | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
IE | 14.06.2021 | ||
LU | 14.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/34] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
IE | 14.06.2021 | ||
LU | 14.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/29] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SI | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
IE | 14.06.2021 | ||
LU | 14.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/26] | AL | 12.05.2021 | |
AT | 12.05.2021 | ||
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
IE | 14.06.2021 | ||
LU | 14.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/23] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
IE | 14.06.2021 | ||
LU | 14.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/21] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
IE | 14.06.2021 | ||
LU | 14.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
PT | 13.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/18] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
MC | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
LU | 14.06.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
PT | 13.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
EE | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
PT | 13.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RO | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SK | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/08] | AT | 12.05.2021 | |
CZ | 12.05.2021 | ||
DK | 12.05.2021 | ||
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/07] | AT | 12.05.2021 | |
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
SM | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2022/04] | AT | 12.05.2021 | |
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
NL | 12.05.2021 | ||
PL | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2021/52] | AT | 12.05.2021 | |
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
PL | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2021/51] | AT | 12.05.2021 | |
ES | 12.05.2021 | ||
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
RS | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
IS | 12.09.2021 | ||
PT | 13.09.2021 | ||
Former [2021/50] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
PT | 13.09.2021 | ||
Former [2021/49] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
HR | 12.05.2021 | ||
LT | 12.05.2021 | ||
LV | 12.05.2021 | ||
SE | 12.05.2021 | ||
BG | 12.08.2021 | ||
NO | 12.08.2021 | ||
GR | 13.08.2021 | ||
Former [2021/47] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
LT | 12.05.2021 | ||
BG | 12.08.2021 | ||
Former [2021/46] | AT | 12.05.2021 | |
FI | 12.05.2021 | ||
LT | 12.05.2021 | Documents cited: | Search | [XI]US2006000030 (SHAFFER TIMOTHY S [US]) [X] 1 * abstract * * paragraphs [0019] , [0 27] , [0 28] , [0 29] , [0 33]; figures 1, 2 * [I] 1,11; | [A]EP2314753 (ELECTROLUX HOME PROD CORP [BE]) [A] 1-15 * claims 1, 8 *; | [A]FR2789451 (SIEBE APPLIANCE CONTROLS SA [FR]) [A] 1,7-9 * figure 1; claim 1 *; | [A]DE19960265 (BSH BOSCH SIEMENS HAUSGERAETE [DE]) [A] 1-15 * column 3, line 3 - line 13 * * column 4, line 17 - line 31 * | by applicant | EP1204792 |