blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2424101

EP2424101 - Power inverter system and method of starting same at high DC voltage [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  07.05.2021
Database last updated on 22.08.2024
FormerThe patent has been granted
Status updated on  29.05.2020
FormerGrant of patent is intended
Status updated on  23.01.2020
FormerExamination is in progress
Status updated on  15.02.2019
FormerRequest for examination was made
Status updated on  20.10.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
General Electric Company
1 River Road
Schenectady, NY 12345 / US
[2020/27]
Former [2012/09]For all designated states
General Electric Company
1 River Road
Schenectady, NY 12345 / US
Inventor(s)01 / El-Barbari, Said Farouk Said
GE Global Research
One Research Circle
Building K1-3A59
Niskayuna, NY 12309 / US
02 / Galbraith, Anthony William
GE Global Research
One Research Circle
Building K1-3A59
Niskayuna, NY 12309 / US
 [2012/09]
Representative(s)Openshaw & Co.
8 Castle Street
Farnham, Surrey GU9 7HR / GB
[2020/27]
Former [2012/09]Bedford, Grant Richard
GE International Inc. Global Patent Operation-Europe 15 John Adam Street London
WC2N 6LU / GB
Application number, filing date11176932.909.08.2011
[2012/09]
Priority number, dateUS2010087079528.08.2010         Original published format: US 870795
[2012/09]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2424101
Date:29.02.2012
Language:EN
[2012/09]
Type: A3 Search report 
No.:EP2424101
Date:12.04.2017
Language:EN
[2017/15]
Type: B1 Patent specification 
No.:EP2424101
Date:01.07.2020
Language:EN
[2020/27]
Search report(s)(Supplementary) European search report - dispatched on:EP09.03.2017
ClassificationIPC:H02M7/515
[2012/09]
CPC:
H02M7/5387 (EP,US); H02M1/32 (EP,US); H02M1/36 (EP,US);
H02M3/155 (EP,US); H02M7/537 (EP,US); H02M1/007 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/47]
Former [2012/09]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Wechselrichtersystem und Verfahren zu seiner Inbetriebsetzung bei hoher Gleichspannung[2012/09]
English:Power inverter system and method of starting same at high DC voltage[2012/09]
French:Système d'onduleur de puissance et son procédé de démarrage avec une tension élevée CC[2012/09]
Examination procedure09.08.2011Date on which the examining division has become responsible
11.10.2017Amendment by applicant (claims and/or description)
12.10.2017Examination requested  [2017/47]
19.02.2019Despatch of a communication from the examining division (Time limit: M06)
30.07.2019Reply to a communication from the examining division
24.01.2020Communication of intention to grant the patent
19.05.2020Fee for grant paid
19.05.2020Fee for publishing/printing paid
19.05.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.02.2019
Opposition(s)06.04.2021No opposition filed within time limit [2021/23]
Fees paidRenewal fee
02.09.2013Renewal fee patent year 03
01.09.2014Renewal fee patent year 04
31.08.2015Renewal fee patent year 05
31.08.2016Renewal fee patent year 06
31.08.2017Renewal fee patent year 07
31.08.2018Renewal fee patent year 08
20.08.2019Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.08.2011
AL01.07.2020
AT01.07.2020
CY01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
MK01.07.2020
MT01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
IE09.08.2020
LU09.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
[2022/32]
Former [2022/27]HU09.08.2011
AL01.07.2020
AT01.07.2020
CY01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
MT01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
IE09.08.2020
LU09.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2022/26]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
IE09.08.2020
LU09.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/37]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
IE09.08.2020
LU09.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/36]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
LU09.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/28]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SK01.07.2020
SM01.07.2020
LU09.08.2020
CH31.08.2020
LI31.08.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/25]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SM01.07.2020
LU09.08.2020
CH31.08.2020
LI31.08.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/23]AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SM01.07.2020
LU09.08.2020
CH31.08.2020
LI31.08.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/22]AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
LU09.08.2020
CH31.08.2020
LI31.08.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/20]AT01.07.2020
CZ01.07.2020
DK01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
NL01.07.2020
PL01.07.2020
RS01.07.2020
SE01.07.2020
LU09.08.2020
CH31.08.2020
LI31.08.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/18]AT01.07.2020
CZ01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
NL01.07.2020
PL01.07.2020
RS01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/17]AT01.07.2020
CZ01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
NL01.07.2020
PL01.07.2020
RS01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/11]AT01.07.2020
CZ01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
PL01.07.2020
RS01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/09]AT01.07.2020
CZ01.07.2020
FI01.07.2020
LT01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
PT02.11.2020
Former [2021/08]FI01.07.2020
LT01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
PT02.11.2020
Former [2021/07]FI01.07.2020
LT01.07.2020
BG01.10.2020
NO01.10.2020
Former [2021/01]BG01.10.2020
Documents cited:Search[A]US6208185  (JOHN VINOD [US], et al) [A] 1,5,6,10 * column 1, line 16 - column 2, line 29 * * column 6, lines 21-43 * * figure 4 *;
 [A]US2004027762  (OHI TAKESHI [JP], et al) [A] 1,5,6,10 * paragraphs [0004] - [0006] - [0 40] , [0 91] , [0 92] , [ 101] * * figures 1, 6, 8, 10, 12-16, 19, 23, 24 *;
 [A]US2004207366  (SUNG CHANG-CHE [TW]) [A] 1-10 * paragraphs [0005] , [00 8] , [0 25] - [0028] * * figures 1, 7, 8 *;
 [A]US2007052379  (SUH BUM-SEOK [KR]) [A] 1,5,6,10 * paragraphs [0072] - [0077] ** figure 8 *;
 [A]WO2009137969  (XUAN KUN [CN]) [A] 1-10 * abstract * * figure 1 *;
 [A]US2010133904  (KLODOWSKI ANTHONY MICHAEL [US], et al) [A] 1-10 * paragraphs [0002] - [0004] - [0 18] , [0 19] * * figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.