blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2422877

EP2422877 - Method for regenerating a denitrification catalyst [Right-click to bookmark this link]
Former [2012/09]Method for regenerating a denitrification catalyst and corresponding facility for implementing same
[2013/07]
StatusNo opposition filed within time limit
Status updated on  11.08.2017
Database last updated on 03.09.2024
Most recent event   Tooltip10.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 12.08.2020  [2020/33]
Applicant(s)For all designated states
LAB SA
259 avenue Jean Jaurès
69007 Lyon / FR
[2013/50]
Former [2012/09]For all designated states
LAB SA
25 Rue Bossuet
69006 Lyon / FR
Inventor(s)01 / Siret, Bernard
1 rue Jean Duclos
69200 VENISSIEUX / FR
02 / Tabaries, Franck
273, Chemin Haut Sainte Barbe
83190 OLLIOULES / FR
 [2012/09]
Representative(s)Lavoix
62, rue de Bonnel
69448 Lyon Cedex 03 / FR
[2016/40]
Former [2012/09]Grand, Guillaume, et al
Cabinet Lavoix 62, Rue de Bonnel
69003 Lyon / FR
Application number, filing date11178824.625.08.2011
[2012/09]
Priority number, dateFR2010005677826.08.2010         Original published format: FR 1056778
[2012/09]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP2422877
Date:29.02.2012
Language:FR
[2012/09]
Type: B1 Patent specification 
No.:EP2422877
Date:05.10.2016
Language:FR
[2016/40]
Search report(s)(Supplementary) European search report - dispatched on:EP17.10.2011
ClassificationIPC:B01J38/08, B01J38/02, B01D53/86
[2012/09]
CPC:
B01D53/8631 (EP); B01J23/94 (EP); B01J23/96 (EP);
B01D2251/2062 (EP); B01D2251/2067 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/40]
Former [2012/09]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Regenerierungsverfahren für einen Denitrifikationskatalysator[2016/17]
English:Method for regenerating a denitrification catalyst[2016/17]
French:Procédé de régénération d'un catalyseur de dénitrification[2016/17]
Former [2012/09]Regenerierungsverfahren für einen Denitrifikationskatalysator und entsprechende Anlage zur Durchführung des Verfahrens
Former [2012/09]Method for regenerating a denitrification catalyst and corresponding facility for implementing same
Former [2012/09]Procédé de régénération d'un catalyseur de dénitrification et installation de mise en oeuvre correspondante
Examination procedure03.08.2012Examination requested  [2012/37]
30.01.2013Despatch of a communication from the examining division (Time limit: M04)
17.05.2013Reply to a communication from the examining division
02.07.2014Despatch of a communication from the examining division (Time limit: M04)
11.09.2014Reply to a communication from the examining division
18.04.2016Communication of intention to grant the patent
21.07.2016Fee for grant paid
21.07.2016Fee for publishing/printing paid
21.07.2016Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  30.01.2013
Opposition(s)06.07.2017No opposition filed within time limit [2017/37]
Fees paidRenewal fee
21.08.2013Renewal fee patent year 03
29.08.2014Renewal fee patent year 04
26.08.2015Renewal fee patent year 05
29.08.2016Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.08.2011
AL05.10.2016
CY05.10.2016
CZ05.10.2016
EE05.10.2016
FI05.10.2016
HR05.10.2016
LT05.10.2016
LV05.10.2016
MC05.10.2016
MK05.10.2016
MT05.10.2016
RO05.10.2016
RS05.10.2016
SI05.10.2016
SK05.10.2016
SM05.10.2016
TR05.10.2016
BG05.01.2017
NO05.01.2017
GR06.01.2017
IS05.02.2017
[2020/33]
Former [2020/15]HU25.08.2011
CY05.10.2016
CZ05.10.2016
EE05.10.2016
FI05.10.2016
HR05.10.2016
LT05.10.2016
LV05.10.2016
MC05.10.2016
MK05.10.2016
MT05.10.2016
RO05.10.2016
RS05.10.2016
SI05.10.2016
SK05.10.2016
SM05.10.2016
TR05.10.2016
BG05.01.2017
NO05.01.2017
GR06.01.2017
IS05.02.2017
Former [2019/51]HU25.08.2011
CY05.10.2016
CZ05.10.2016
EE05.10.2016
FI05.10.2016
HR05.10.2016
LT05.10.2016
LV05.10.2016
MC05.10.2016
MK05.10.2016
MT05.10.2016
RO05.10.2016
RS05.10.2016
SI05.10.2016
SK05.10.2016
SM05.10.2016
BG05.01.2017
NO05.01.2017
GR06.01.2017
IS05.02.2017
Former [2019/46]HU25.08.2011
CY05.10.2016
CZ05.10.2016
EE05.10.2016
FI05.10.2016
HR05.10.2016
LT05.10.2016
LV05.10.2016
MC05.10.2016
MT05.10.2016
RO05.10.2016
RS05.10.2016
SI05.10.2016
SK05.10.2016
SM05.10.2016
BG05.01.2017
NO05.01.2017
GR06.01.2017
IS05.02.2017
Former [2019/31]HU25.08.2011
CZ05.10.2016
EE05.10.2016
FI05.10.2016
HR05.10.2016
LT05.10.2016
LV05.10.2016
MC05.10.2016
MT05.10.2016
RO05.10.2016
RS05.10.2016
SI05.10.2016
SK05.10.2016
SM05.10.2016
BG05.01.2017
NO05.01.2017
GR06.01.2017
IS05.02.2017
Former [2018/43]CZ05.10.2016
EE05.10.2016
FI05.10.2016
HR05.10.2016
LT05.10.2016
LV05.10.2016
MC05.10.2016
MT05.10.2016
RO05.10.2016
RS05.10.2016
SI05.10.2016
SK05.10.2016
SM05.10.2016
BG05.01.2017
NO05.01.2017
GR06.01.2017
IS05.02.2017
Former [2018/18]CZ05.10.2016
EE05.10.2016
FI05.10.2016
HR05.10.2016
LT05.10.2016
LV05.10.2016
MC05.10.2016
RO05.10.2016
RS05.10.2016
SI05.10.2016
SK05.10.2016
SM05.10.2016
BG05.01.2017
NO05.01.2017
GR06.01.2017
IS05.02.2017
Former [2017/52]CZ05.10.2016
EE05.10.2016
FI05.10.2016
HR05.10.2016
LT05.10.2016
LV05.10.2016
RO05.10.2016
RS05.10.2016
SI05.10.2016
SK05.10.2016
SM05.10.2016
BG05.01.2017
NO05.01.2017
GR06.01.2017
IS05.02.2017
Former [2017/42]CZ05.10.2016
EE05.10.2016
FI05.10.2016
HR05.10.2016
LT05.10.2016
LV05.10.2016
RO05.10.2016
RS05.10.2016
SK05.10.2016
SM05.10.2016
BG05.01.2017
NO05.01.2017
GR06.01.2017
IS05.02.2017
Former [2017/35]CZ05.10.2016
EE05.10.2016
FI05.10.2016
HR05.10.2016
LT05.10.2016
LV05.10.2016
RO05.10.2016
RS05.10.2016
NO05.01.2017
GR06.01.2017
IS05.02.2017
Former [2017/34]CZ05.10.2016
FI05.10.2016
HR05.10.2016
LT05.10.2016
LV05.10.2016
RS05.10.2016
NO05.01.2017
GR06.01.2017
IS05.02.2017
Former [2017/26]FI05.10.2016
HR05.10.2016
LT05.10.2016
LV05.10.2016
RS05.10.2016
NO05.01.2017
GR06.01.2017
IS05.02.2017
Former [2017/12]LV05.10.2016
Documents cited:Search[A]US2004098980  (MONTREUIL CLIFFORD NORMAN [US], et al);
 [A]EP1576999  (LAB SA [FR]);
 [AD]US2008089822  (FREY RUEDI [CH], et al);
 [A]EP2011559  (LAB SA [FR]);
 [A]EP2151272  (LAB SA [FR])
ExaminationUS2001001435
 US2004098979
by applicantUS2008089822
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.