blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2426360

EP2426360 - Pump assembly with integrated vibration measurement [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  16.02.2018
Database last updated on 11.09.2024
FormerExamination is in progress
Status updated on  25.11.2016
Most recent event   Tooltip16.02.2018Application deemed to be withdrawnpublished on 21.03.2018  [2018/12]
Applicant(s)For all designated states
HOMA Pumpenfabrik GmbH
Industriestrasse 1
53819 Neunkirchen-Seelscheid / DE
[2012/10]
Inventor(s)01 / Diesing, Marc
Am Schmerbroich 146
53757 Sankt Augustin / DE
02 / Senkowski, Martin
Frauenstraße 306 A
53819 Neunkirchen-Seelscheid / DE
03 / Petridis, Vassilios
Huven 21 b
53804 Much / DE
 [2012/10]
Representative(s)Oberwalleney, Stephan, et al
Neumann Müller Oberwalleney & Partner
Patentanwälte
Overstolzenstrasse 2a
50677 Köln / DE
[N/P]
Former [2012/10]Oberwalleney, Stephan, et al
Neumann Müller Oberwalleney & Partner Patentanwälte Overstolzenstrasse 2a
50677 Köln / DE
Application number, filing date11180480.307.09.2011
[2012/10]
Priority number, dateDE2010103737907.09.2010         Original published format: DE102010037379
[2012/10]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP2426360
Date:07.03.2012
Language:DE
[2012/10]
Type: A3 Search report 
No.:EP2426360
Date:03.09.2014
Language:DE
[2014/36]
Search report(s)(Supplementary) European search report - dispatched on:EP01.08.2014
ClassificationIPC:F04D15/00, F04D13/08
[2014/36]
CPC:
F04D15/0088 (EP); F04D13/08 (EP)
Former IPC [2012/10]F04D15/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2012/10]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:Pumpenanordnung mit integrierter Vibrationsmessung[2012/10]
English:Pump assembly with integrated vibration measurement[2012/10]
French:Agencement de pompes doté d'une mesure de vibrations intégrée[2012/10]
Examination procedure03.03.2015Amendment by applicant (claims and/or description)
03.03.2015Examination requested  [2015/16]
26.07.2016Despatch of a communication from the examining division (Time limit: M06)
06.02.2017Reply to a communication from the examining division
07.06.2017Despatch of a communication from the examining division (Time limit: M04)
18.10.2017Application deemed to be withdrawn, date of legal effect  [2018/12]
14.11.2017Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2018/12]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  26.07.2016
Fees paidRenewal fee
14.09.2013Renewal fee patent year 03
29.09.2014Renewal fee patent year 04
29.09.2015Renewal fee patent year 05
29.09.2016Renewal fee patent year 06
Penalty fee
Additional fee for renewal fee
30.09.201707   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XI]GB2338801  (BAKER HUGHES INC [US]) [X] 1,9-11,15 * page 8, line 20 - line 26 * * page 12, line 3 - line 5 * * page 14, line 3 - line 15 * * page 16, line 14 - line 15 * * page 29, line 16 - line 32 * * page 30, line 1 - line 32 * * page 31, line 1 - line 12 * * figures 1L,1N,2P,2Q,2R,2S,2T,2U * [I] 3-5,7,8,12-14;
 [XI]US2008196887  (MCCOY ROBERT H [US], et al) [X] 1,2,6,9 * paragraphs [0003] , [0009] , [0010] , [0011] , [0030] , [0039] , [0040] , [0041] , [0043] , [0045] * * figures 4,5 * [I] 3-5,7,8,12-14;
 [XI]US2002125777  (PARMETER LARRY JAMES [US], et al) [X] 1,11,14 * paragraphs [0004] , [0016] , [0030] , [0031] , [0032] , [0033] * * figure 5b * [I] 3-5,7,8,12,13;
 [A]JPH10205478  (HITACHI LTD) [A] 1,3,4,8 * figure 1 *;
 [A]JP2001235362  (NGK SPARK PLUG CO) [A] 1,7 * abstract * * figure 3 *
by applicantDE202004009580U
 DE102008038661
 DE19956768
 DE19617570
 DE102009005154
 GB2450157
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.