EP2439408 - System of distributing air within a wind turbine [Right-click to bookmark this link] | |||
Former [2012/15] | System and method of distributing air within a wind turbine | ||
[2019/31] | Status | The application is deemed to be withdrawn Status updated on 10.01.2020 Database last updated on 28.06.2024 | |
Former | Grant of patent is intended Status updated on 21.08.2019 | ||
Former | Examination is in progress Status updated on 08.12.2017 | ||
Former | Request for examination was made Status updated on 18.11.2016 | Most recent event Tooltip | 10.01.2020 | Application deemed to be withdrawn | published on 12.02.2020 [2020/07] | Applicant(s) | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | [2012/15] | Inventor(s) | 01 /
Nanukuttan, Biju GEITC JFWTC, Plot No. 122 EPIP, Phase 2 Whitefield Road 560066 Bangalore / IN | 02 /
Bose, Sumit GE Global Research One Research Circle Niskayuna, NY 12309 / US | 03 /
Neogi, Ganesh Plot No. 2 Michigan Compound Saptapur 580001 Dharwad / IN | 04 /
Asarikandy, Shalu GEITC JFWTC, Plot No. 122 EPIP, Phase 2 Whitefield Road 560066 Bangalore / IN | 05 /
Wang, Jing 300 Garlington Road Greenville, SC 29615 / US | [2012/15] | Representative(s) | (deleted) | [N/P] |
Former [2012/15] | Bedford, Grant Richard Global Patent Operation - Europe GE International Inc. 15 John Adam Street London WC2N 6LU / GB | Application number, filing date | 11182580.8 | 23.09.2011 | [2012/15] | Priority number, date | US20100899324 | 06.10.2010 Original published format: US 899324 | [2012/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2439408 | Date: | 11.04.2012 | Language: | EN | [2012/15] | Type: | A3 Search report | No.: | EP2439408 | Date: | 11.05.2016 | Language: | EN | [2016/19] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.04.2016 | Classification | IPC: | F03D80/00, F03D80/40, F03D15/00 | [2019/31] | CPC: |
F03D15/05 (EP,US);
F03D80/40 (EP,US);
F05B2260/64 (EP,US);
Y02E10/72 (EP)
|
Former IPC [2016/19] | F03D11/00, F03D1/06 | ||
Former IPC [2012/15] | F03D11/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/51] |
Former [2012/15] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | System zum Verteilen von Luft in einer Windturbine | [2019/31] | English: | System of distributing air within a wind turbine | [2019/31] | French: | Système de distribution d'air dans une éolienne | [2019/31] |
Former [2012/15] | System und Verfahren zum Verteilen von Luft in einer Windturbine | ||
Former [2012/15] | System and method of distributing air within a wind turbine | ||
Former [2012/15] | Système et procédé de distribution d'air dans une éolienne | Examination procedure | 23.09.2011 | Date on which the examining division has become responsible | 11.11.2016 | Examination requested [2016/51] | 01.03.2017 | Amendment by applicant (claims and/or description) | 07.12.2017 | Despatch of a communication from the examining division (Time limit: M06) | 12.06.2018 | Reply to a communication from the examining division | 22.08.2019 | Communication of intention to grant the patent | 23.08.2019 | Application deemed to be withdrawn, date of legal effect [2020/07] | 30.09.2019 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time [2020/07] | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.12.2017 | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 01.03.2017 | Request for further processing filed | 01.03.2017 | Full payment received (date of receipt of payment) Request granted | 10.07.2017 | Decision despatched | Fees paid | Renewal fee | 30.09.2013 | Renewal fee patent year 03 | 30.09.2014 | Renewal fee patent year 04 | 30.09.2015 | Renewal fee patent year 05 | 30.09.2016 | Renewal fee patent year 06 | 02.10.2017 | Renewal fee patent year 07 | 01.10.2018 | Renewal fee patent year 08 | Penalty fee | Additional fee for renewal fee | 30.09.2019 | 09   M06   Not yet paid |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [X]EP1375913 (HIGH TECHNOLOGY INVEST BV [NL]) [X] 1,5,8 * paragraph [0040] - paragraph [0044]; figure 3 *; | [A]WO2004036038 (BATTISTI LORENZO [IT]) [A] 1-10* the whole document *; | [XY]JP2005069082 (FUJI HEAVY IND LTD) [X] 1-3,5,6,8,9 * paragraph [0011]; figures 1-4 * * paragraph [0017] - paragraph [0021] * * paragraph [0026] * * paragraph [0033]; claim 1 * [Y] 4,7,10; | [Y]GB2452488 (RASMUSSEN ULRIK [DK]) [Y] 4,7,10 * page 9, paragraph 2; figure 2 * * page 11, paragraph 2 - paragraph 5 * * page 12, paragraph 2 - paragraph 3 * * page 18 - page 19 *; | [A]US2010143122 (NIES JACOB JOHANNES [NL], et al) [A] 1-10 * the whole document * |