blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2407114

EP2407114 - Surgical stapling apparatus [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.07.2021
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  14.08.2020
FormerGrant of patent is intended
Status updated on  06.05.2020
FormerExamination is in progress
Status updated on  25.06.2019
Most recent event   Tooltip22.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 24.08.2022  [2022/34]
Applicant(s)For all designated states
Covidien LP
15 Hampshire Street
Mansfield, MA 02048 / US
[2020/38]
Former [2012/52]For all designated states
Covidien LP
15 Hampshire Street
Mansfield, MA 02048 / US
Former [2012/03]For all designated states
Tyco Healthcare Group LP
Mailstop 8 N-1 555 Long Wharf Drive
New Haven, CT 06511 / US
Inventor(s)01 / Tarinelli, Danyel
1390 Bartholomew Road
Middletown, CT Connecticut 06457 / US
02 / Aranyi, Ernie
170 Stepney Road
Easton, CT Connecticut 06612 / US
03 / Simpson, Richard
145 Bear Path Road
Hamden, CT Connecticut 06514 / US
04 / Shah, Sachin
8 Juniper Drive
Milford, CT Connecticut 06461 / US
 [2012/03]
Representative(s)Maschio, Antonio, et al
Maschio & Soames IP Limited
30 Carlton Crescent
Southampton SO15 2EW / GB
[2020/38]
Former [2014/15]Tanner, James Percival
Maschio & Soames LLP
20 Carlton Crescent
Southampton, SO15 2ET / GB
Former [2012/03]Tanner, James Percival
Edwards Angell Palmer & Dodge
Innovations LLP
10 Carlton Crescent
Southampton, Hampshire SO15 2EZ / GB
Application number, filing date11183256.423.12.2009
[2012/03]
Priority number, dateUS2008034240023.12.2008         Original published format: US 342400
[2012/03]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2407114
Date:18.01.2012
Language:EN
[2012/03]
Type: A3 Search report 
No.:EP2407114
Date:19.12.2012
Language:EN
[2012/51]
Type: B1 Patent specification 
No.:EP2407114
Date:16.09.2020
Language:EN
[2020/38]
Search report(s)(Supplementary) European search report - dispatched on:EP16.11.2012
ClassificationIPC:A61B17/072
[2012/03]
CPC:
A61B17/07207 (EP,US); A61B17/07292 (EP,US); A61B2017/0023 (EP,US);
A61B2017/00473 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2020/38]
Former [2012/03]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Chirurgische Klammervorrichtung[2012/03]
English:Surgical stapling apparatus[2012/03]
French:Appareil d'agrafeuse chirurgicale[2012/03]
Examination procedure06.06.2013Amendment by applicant (claims and/or description)
06.06.2013Examination requested  [2013/29]
20.04.2016Despatch of a communication from the examining division (Time limit: M04)
09.08.2016Reply to a communication from the examining division
28.06.2019Despatch of a communication from the examining division (Time limit: M04)
12.09.2019Reply to a communication from the examining division
07.05.2020Communication of intention to grant the patent
07.08.2020Fee for grant paid
07.08.2020Fee for publishing/printing paid
07.08.2020Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP09252897.5  / EP2201901
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20090252897) is  03.03.2015
Opposition(s)17.06.2021No opposition filed within time limit [2021/34]
Fees paidRenewal fee
27.12.2011Renewal fee patent year 03
26.12.2012Renewal fee patent year 04
27.12.2013Renewal fee patent year 05
22.12.2014Renewal fee patent year 06
23.12.2015Renewal fee patent year 07
22.12.2016Renewal fee patent year 08
21.12.2017Renewal fee patent year 09
20.12.2018Renewal fee patent year 10
19.12.2019Renewal fee patent year 11
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.12.2009
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
MT16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE23.12.2020
LU23.12.2020
BE31.12.2020
CH31.12.2020
LI31.12.2020
IS16.01.2021
PT18.01.2021
[2022/34]
Former [2022/32]HU23.12.2009
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
MT16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE23.12.2020
LU23.12.2020
CH31.12.2020
LI31.12.2020
IS16.01.2021
PT18.01.2021
Former [2022/27]HU23.12.2009
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MT16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE23.12.2020
LU23.12.2020
CH31.12.2020
LI31.12.2020
IS16.01.2021
PT18.01.2021
Former [2022/26]AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE23.12.2020
LU23.12.2020
CH31.12.2020
LI31.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/52]AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE23.12.2020
LU23.12.2020
CH31.12.2020
LI31.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/48]AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE23.12.2020
LU23.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/47]AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE23.12.2020
LU23.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/46]AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IE23.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/40]AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/37]AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/36]AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/28]AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/25]AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/24]AT16.09.2020
CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
RO16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/23]CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
RO16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/22]CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
RO16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/21]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/20]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/18]FI16.09.2020
HR16.09.2020
LV16.09.2020
NL16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/10]FI16.09.2020
HR16.09.2020
LV16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/09]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/08]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
Former [2021/07]FI16.09.2020
NO16.12.2020
Documents cited:Search[A]EP0667119  (BIO VASCULAR INC [US]) [A] 1-12 * column 2, line 21 - column 6, line 2; figures 1,2 *;
 [A]WO9701989  (FRATER DIRK A [US], et al) [A] 1-12* the whole document *;
 [A]US5762256  (MASTRI DOMINICK L [US], et al) [A] 1-12 * column 10, lines 6-14; figure 1 *;
 [A]WO2008057281  (TYCO HEALTHCARE [US], et al) [A] 1-12 * the whole document *;
 [XI]WO2008109125  (TYCO HEALTHCARE [US], et al) [X] 1-7,9,11,12 * paragraphs [0117] , [0121] , [0132] - [0147] - [0151] , [0196]; figures 2,8,16,20,22,32,49 * [I] 8,10
by applicantUS3079606
 US3490675
 US3499591
 US4429695
 US5040715
 US5065929
 US5307976
 US5312023
 US5318221
 US5326013
 US5332142
 US5542594
 US5908427
 US5964774
 US6045560
 US6241139
 US2006085034
 US2006135992
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.