blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

Latvia joins the Federated Register
Click here for more information on the Federated Register.

2025-04-16

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2405616

EP2405616 - Method and apparatus for allocation of an uplink resource [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  29.11.2013
Database last updated on 26.04.2025
Most recent event   Tooltip17.07.2015Lapse of the patent in a contracting state
New state(s): HU, LU
published on 19.08.2015  [2015/34]
Applicant(s)For all designated states
BlackBerry Limited
2200 University Avenue East
Waterloo, ON N2K 0A7 / CA
[2013/48]
Former [2013/36]For all designated states
BlackBerry Limited
295 Phillip Street
Waterloo ON N2L 3W8 / CA
Former [2013/04]For all designated states
Research In Motion Limited
295 Phillip Street
Waterloo, ON N2L 3W8 / CA
Former [2012/02]For all designated states
Research in Motion Limited
295 Phillip Street
Waterloo, Ontario N2L 3W8 / CA
Inventor(s)01 / Yu, Yi
12 Corkstown Road
Apt. 225
Ottawa, K2H 5B3 / CA
02 / Cai, Zhijun
3009 Manor Green Blvd.
Euless, TX Texas 76039-4138 / US
03 / Womack, James
32 Linderhof Circle
Bedford, TX Texas 76022 / US
 [2012/02]
Representative(s)Hibbert, Juliet Jane Grace, et al
Kilburn & Strode LLP
Lacon London
84 Theobalds Road
London WC1X 8NL / GB
[N/P]
Former [2012/02]Hibbert, Juliet Jane Grace, et al
Kilburn & Strode LLP 20 Red Lion Street
London WC1R 4PJ / GB
Application number, filing date11183791.028.03.2008
[2012/02]
Priority number, dateUS2008002389731.01.2008         Original published format: US 23897
[2012/02]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2405616
Date:11.01.2012
Language:EN
[2012/27]
Type: A8 Corrected patent application 
No.:EP2405616
Date:04.07.2012
[2012/27]
Type: A3 Search report 
No.:EP2405616
Date:25.07.2012
Language:EN
[2012/30]
Type: B1 Patent specification 
No.:EP2405616
Date:23.01.2013
Language:EN
[2013/04]
Former [2012/27]Type: A3 Search report
No.:EP2405616
Date:
Status:(deleted)
[2012/27]
[2012/30]
Search report(s)(Supplementary) European search report - dispatched on:EP25.10.2011
ClassificationIPC:H04W28/02
[2013/04]
CPC:
H04L47/824 (EP,US); H04L47/10 (US); H04L47/70 (EP,US);
H04L47/745 (EP,US); H04L47/801 (EP,US); H04L47/822 (EP,US)
Former IPC [2012/02]H04L12/56
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2012/02]
TitleGerman:Verfahren und Vorrichtung für die Zuweisung einer Uplink-Ressource[2012/02]
English:Method and apparatus for allocation of an uplink resource[2012/02]
French:Procédé et appareil d'affectation d'une ressource de liaison montante[2012/02]
Examination procedure04.10.2011Examination requested  [2012/02]
09.07.2012Amendment by applicant (claims and/or description)
23.08.2012Communication of intention to grant the patent
20.11.2012Fee for grant paid
20.11.2012Fee for publishing/printing paid
Parent application(s)   TooltipEP08153672.4  / EP2086185
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20080153672) is  29.09.2009
Opposition(s)24.10.2013No opposition filed within time limit [2014/01]
Fees paidRenewal fee
04.10.2011Renewal fee patent year 03
04.10.2011Renewal fee patent year 04
12.01.2012Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.03.2008
AT23.01.2013
BE23.01.2013
CY23.01.2013
CZ23.01.2013
DK23.01.2013
EE23.01.2013
FI23.01.2013
HR23.01.2013
IT23.01.2013
LT23.01.2013
LV23.01.2013
MT23.01.2013
PL23.01.2013
RO23.01.2013
SE23.01.2013
SI23.01.2013
SK23.01.2013
TR23.01.2013
IE28.03.2013
LU28.03.2013
CH31.03.2013
LI31.03.2013
MC31.03.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
PT23.05.2013
[2015/34]
Former [2015/32]AT23.01.2013
BE23.01.2013
CY23.01.2013
CZ23.01.2013
DK23.01.2013
EE23.01.2013
FI23.01.2013
HR23.01.2013
IT23.01.2013
LT23.01.2013
LV23.01.2013
MT23.01.2013
PL23.01.2013
RO23.01.2013
SE23.01.2013
SI23.01.2013
SK23.01.2013
TR23.01.2013
IE28.03.2013
CH31.03.2013
LI31.03.2013
MC31.03.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
PT23.05.2013
Former [2014/32]AT23.01.2013
BE23.01.2013
CY23.01.2013
CZ23.01.2013
DK23.01.2013
EE23.01.2013
FI23.01.2013
HR23.01.2013
IT23.01.2013
LT23.01.2013
LV23.01.2013
MT23.01.2013
PL23.01.2013
RO23.01.2013
SE23.01.2013
SI23.01.2013
SK23.01.2013
IE28.03.2013
CH31.03.2013
LI31.03.2013
MC31.03.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
PT23.05.2013
Former [2014/08]AT23.01.2013
BE23.01.2013
CY23.01.2013
CZ23.01.2013
DK23.01.2013
EE23.01.2013
FI23.01.2013
HR23.01.2013
IT23.01.2013
LT23.01.2013
LV23.01.2013
PL23.01.2013
RO23.01.2013
SE23.01.2013
SI23.01.2013
SK23.01.2013
IE28.03.2013
CH31.03.2013
LI31.03.2013
MC31.03.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
PT23.05.2013
Former [2014/07]AT23.01.2013
BE23.01.2013
CY23.01.2013
CZ23.01.2013
DK23.01.2013
EE23.01.2013
FI23.01.2013
HR23.01.2013
IT23.01.2013
LT23.01.2013
LV23.01.2013
PL23.01.2013
RO23.01.2013
SE23.01.2013
SI23.01.2013
SK23.01.2013
IE28.03.2013
MC31.03.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
PT23.05.2013
Former [2014/03]AT23.01.2013
BE23.01.2013
CY23.01.2013
CZ23.01.2013
DK23.01.2013
EE23.01.2013
FI23.01.2013
HR23.01.2013
IT23.01.2013
LT23.01.2013
LV23.01.2013
PL23.01.2013
RO23.01.2013
SE23.01.2013
SI23.01.2013
SK23.01.2013
MC31.03.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
PT23.05.2013
Former [2013/52]AT23.01.2013
BE23.01.2013
CY23.01.2013
CZ23.01.2013
DK23.01.2013
EE23.01.2013
FI23.01.2013
HR23.01.2013
LT23.01.2013
LV23.01.2013
PL23.01.2013
RO23.01.2013
SE23.01.2013
SI23.01.2013
SK23.01.2013
MC31.03.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
PT23.05.2013
Former [2013/49]AT23.01.2013
BE23.01.2013
CZ23.01.2013
DK23.01.2013
EE23.01.2013
FI23.01.2013
HR23.01.2013
LT23.01.2013
LV23.01.2013
PL23.01.2013
RO23.01.2013
SE23.01.2013
SI23.01.2013
SK23.01.2013
MC31.03.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
PT23.05.2013
Former [2013/48]AT23.01.2013
BE23.01.2013
DK23.01.2013
EE23.01.2013
FI23.01.2013
HR23.01.2013
LT23.01.2013
LV23.01.2013
PL23.01.2013
SE23.01.2013
SI23.01.2013
MC31.03.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
PT23.05.2013
Former [2013/47]AT23.01.2013
BE23.01.2013
FI23.01.2013
HR23.01.2013
LT23.01.2013
LV23.01.2013
PL23.01.2013
SE23.01.2013
SI23.01.2013
MC31.03.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
PT23.05.2013
Former [2013/41]AT23.01.2013
BE23.01.2013
FI23.01.2013
HR23.01.2013
LT23.01.2013
LV23.01.2013
PL23.01.2013
SE23.01.2013
SI23.01.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
PT23.05.2013
Former [2013/40]AT23.01.2013
BE23.01.2013
FI23.01.2013
LT23.01.2013
LV23.01.2013
PL23.01.2013
SE23.01.2013
SI23.01.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
PT23.05.2013
Former [2013/38]AT23.01.2013
BE23.01.2013
FI23.01.2013
LT23.01.2013
LV23.01.2013
PL23.01.2013
SE23.01.2013
SI23.01.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
Former [2013/37]AT23.01.2013
BE23.01.2013
FI23.01.2013
LT23.01.2013
PL23.01.2013
SE23.01.2013
SI23.01.2013
BG23.04.2013
NO23.04.2013
GR24.04.2013
ES04.05.2013
IS23.05.2013
Former [2013/36]AT23.01.2013
BE23.01.2013
LT23.01.2013
PL23.01.2013
SE23.01.2013
BG23.04.2013
NO23.04.2013
ES04.05.2013
IS23.05.2013
Former [2013/35]BE23.01.2013
LT23.01.2013
SE23.01.2013
BG23.04.2013
NO23.04.2013
IS23.05.2013
Former [2013/34]LT23.01.2013
SE23.01.2013
BG23.04.2013
NO23.04.2013
IS23.05.2013
Former [2013/33]LT23.01.2013
NO23.04.2013
Documents cited:Search[X]WO03051007  (NORTEL NETWORKS LTD [CA]) [X] 1-15 * paragraph [0021] - paragraph [0022] * * page 4, line 27 - line 29 ** page 5, line 2 - line 8 *;
 [X]US2007110002  (YANG SUNG-KANG [TW], et al) [X] 1-5 * paragraph [0005]; figure 2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.