blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2608411

EP2608411 - Switching circuit [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  15.01.2021
Database last updated on 20.09.2024
FormerThe patent has been granted
Status updated on  07.02.2020
FormerGrant of patent is intended
Status updated on  03.10.2019
FormerExamination is in progress
Status updated on  09.03.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
NXP B.V.
High Tech Campus 60
5656 AG Eindhoven / NL
[2013/26]
Inventor(s)01 / Farnsworth, Tim Luke
NXP Semiconductors, IP & L
Betchworth House
57-65 Station Road
Redhill, Surrey RH1 1DL / GB
 [2013/26]
Representative(s)Miles, John Richard
NXP SEMICONDUCTORS
Intellectual Property Group
Abbey House
25 Clarendon Road
Redhill, Surrey RH1 1QZ / GB
[2020/11]
Former [2013/26]Crawford, Andrew
NXP Semiconductors
Intellectual Property and Licensing
Red Central
60 High Street
Redhill, Surrey RH1 1SH / GB
Application number, filing date11195388.122.12.2011
[2013/26]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2608411
Date:26.06.2013
Language:EN
[2013/26]
Type: B1 Patent specification 
No.:EP2608411
Date:11.03.2020
Language:EN
[2020/11]
Search report(s)(Supplementary) European search report - dispatched on:EP13.06.2012
ClassificationIPC:H03K19/003, H03K19/017
[2013/26]
CPC:
H03K19/01707 (EP,US); H03K19/00361 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/11]
Former [2013/26]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Schaltkreis[2013/26]
English:Switching circuit[2013/26]
French:Circuit de commutation[2013/26]
Examination procedure02.08.2012Amendment by applicant (claims and/or description)
31.10.2013Examination requested  [2013/50]
13.03.2018Despatch of a communication from the examining division (Time limit: M04)
19.07.2018Reply to a communication from the examining division
12.02.2019Despatch of a communication from the examining division (Time limit: M04)
21.06.2019Reply to a communication from the examining division
04.10.2019Communication of intention to grant the patent
03.02.2020Fee for grant paid
03.02.2020Fee for publishing/printing paid
03.02.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  13.03.2018
Opposition(s)14.12.2020No opposition filed within time limit [2021/07]
Fees paidRenewal fee
02.01.2014Renewal fee patent year 03
05.01.2015Renewal fee patent year 04
04.01.2016Renewal fee patent year 05
02.01.2017Renewal fee patent year 06
02.01.2018Renewal fee patent year 07
02.01.2019Renewal fee patent year 08
02.01.2020Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.12.2011
AL11.03.2020
AT11.03.2020
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MK11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
[2022/31]
Former [2022/30]HU22.12.2011
AL11.03.2020
AT11.03.2020
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2022/27]HU22.12.2011
AT11.03.2020
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2022/26]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/40]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/10]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/09]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/08]CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/50]CZ11.03.2020
EE11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/49]CZ11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/48]FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/47]FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
Former [2020/46]FI11.03.2020
HR11.03.2020
LV11.03.2020
NL11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
Former [2020/45]FI11.03.2020
HR11.03.2020
LV11.03.2020
NL11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
Former [2020/39]FI11.03.2020
HR11.03.2020
LV11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
Former [2020/38]FI11.03.2020
HR11.03.2020
LV11.03.2020
RS11.03.2020
SE11.03.2020
NO11.06.2020
GR12.06.2020
Former [2020/37]FI11.03.2020
HR11.03.2020
LV11.03.2020
RS11.03.2020
SE11.03.2020
NO11.06.2020
Former [2020/35]FI11.03.2020
NO11.06.2020
Documents cited:Search[XA]EP0086090  (NEC CORP [JP]) [X] 1,6,9,13,15 * abstract * * page 1, lines 34,35 * * page 2, line 37 - page 3, line 9 * * page 5, line 25 - page 9, line 33 * [A] 2-4,12;
 [A]EP0279332  (TOSHIBA KK [JP]) [A] 1-5,12-15 * abstract * * column 1, line 19 - line 42 * * column 2, line 21 - line 25 * * column 2, line 39 - line 52 * * column 4, line 10 - column 6, line 2 *;
 [XA]WO0205427  (KONINKL PHILIPS ELECTRONICS NV [NL]) [X] 1,4,6,15 * abstract * * page 2, line 7 - line 26 * * page 3, line 7 - page 5, line 14 * [A] 3,8,12,13;
 [A]US6363029  (WATANABE TAKAO [JP], et al) [A] 1-5,7,8,10,13,15 * figures 7a,7b,11a,11b,21,34 * * column 8, line 31 - column 9, line 12 ** column 17, line 50 - column 18, line 16 *;
 [A]WO2007072398  (NXP BV [NL], et al) [A] 1,3,4,8,9,12-15 * figures 5,6,7 * * page 5, line 1 - line 9 * * page 4, line 13 - line 19 * * page 5, line 3 - line 10 * * page 6, line 1 - line 17 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.