EP2538707 - Method for uploading subscriber credentials and associated equipment [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.07.2020 Database last updated on 12.10.2024 | |
Former | The patent has been granted Status updated on 26.07.2019 | ||
Former | Grant of patent is intended Status updated on 19.03.2019 | ||
Former | Examination is in progress Status updated on 25.05.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Alcatel Lucent Site Nokia Paris Saclay Route de Villejust 91620 Nozay / FR | [2018/16] |
Former [2014/34] | For all designated states ALCATEL LUCENT 148/152 route de la Reine 92100 Boulogne-Billancourt / FR | ||
Former [2012/52] | For all designated states Alcatel Lucent 3, avenue Octave Gréard 75007 Paris / FR | Inventor(s) | 01 /
Conte, Alberto Alcatel Lucent Bell Labs France Centre de Villarceaux- Route de Villejust 91620 Nozay / FR | 02 /
Chakri, Al Mahdi Alcatel Lucent Bell Labs France Centre de Villarceaux- Route de Villejust 91620 Nozay / FR | [2012/52] | Representative(s) | Nokia EPO representatives Nokia Technologies Oy Karakaari 7 02610 Espoo / FI | [N/P] |
Former [2019/35] | Croonenbroek, Thomas Jakob, et al Innovincia 11, avenue des Tilleuls 74200 Thonon-les-Bains / FR | ||
Former [2012/52] | Croonenbroek, Thomas Jakob, et al Cabinet Innovincia 11, Avenue des Tilleuls 74200 Thonon-les-Bains / FR | Application number, filing date | 11290280.4 | 21.06.2011 | [2012/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2538707 | Date: | 26.12.2012 | Language: | EN | [2012/52] | Type: | B1 Patent specification | No.: | EP2538707 | Date: | 28.08.2019 | Language: | EN | [2019/35] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 04.10.2011 | Classification | IPC: | H04W8/20, H04L29/06, H04W12/06 | [2019/13] | CPC: |
H04L63/0823 (EP);
H04L63/162 (EP);
H04W12/35 (EP);
H04L63/0272 (EP);
H04L63/166 (EP);
H04W12/06 (EP);
H04W8/20 (EP)
(-)
|
Former IPC [2012/52] | H04W8/20, H04L29/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/35] |
Former [2012/52] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verfahren zum Hochladen von Teilnehmerberechtigungen und zugehöriges Gerät | [2012/52] | English: | Method for uploading subscriber credentials and associated equipment | [2012/52] | French: | Procédé de chargement des autorisations d'abonné et équipement associé | [2012/52] | Examination procedure | 26.06.2013 | Amendment by applicant (claims and/or description) | 26.06.2013 | Examination requested [2013/32] | 25.05.2018 | Despatch of a communication from the examining division (Time limit: M04) | 24.09.2018 | Reply to a communication from the examining division | 20.03.2019 | Communication of intention to grant the patent | 17.07.2019 | Fee for grant paid | 17.07.2019 | Fee for publishing/printing paid | 17.07.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 25.05.2018 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/32] | Fees paid | Renewal fee | 20.06.2013 | Renewal fee patent year 03 | 25.06.2014 | Renewal fee patent year 04 | 19.06.2015 | Renewal fee patent year 05 | 27.06.2016 | Renewal fee patent year 06 | 27.06.2017 | Renewal fee patent year 07 | 27.06.2018 | Renewal fee patent year 08 | 13.06.2019 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Rights in Rem or Legal Means of Execution | deleted | [2014/47] |
Former [2013/40] | ID: | 01 | |
For: | all designated states | ||
Date: | 10.04.2013 | ||
[2014/47] | Lapses during opposition Tooltip | HU | 21.06.2011 | AL | 28.08.2019 | AT | 28.08.2019 | CY | 28.08.2019 | CZ | 28.08.2019 | DK | 28.08.2019 | EE | 28.08.2019 | FI | 28.08.2019 | HR | 28.08.2019 | IT | 28.08.2019 | LT | 28.08.2019 | LV | 28.08.2019 | MC | 28.08.2019 | MK | 28.08.2019 | MT | 28.08.2019 | NL | 28.08.2019 | PL | 28.08.2019 | RO | 28.08.2019 | RS | 28.08.2019 | SE | 28.08.2019 | SI | 28.08.2019 | SK | 28.08.2019 | SM | 28.08.2019 | TR | 28.08.2019 | BG | 28.11.2019 | NO | 28.11.2019 | GR | 29.11.2019 | IS | 28.12.2019 | PT | 30.12.2019 | [2022/32] |
Former [2022/27] | HU | 21.06.2011 | |
AL | 28.08.2019 | ||
AT | 28.08.2019 | ||
CY | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
MC | 28.08.2019 | ||
MT | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SI | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2021/12] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
MC | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SI | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/37] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SI | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/36] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/27] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
PT | 30.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SK | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
PT | 30.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
PT | 30.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/22] | AL | 28.08.2019 | |
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/17] | AL | 28.08.2019 | |
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/15] | AL | 28.08.2019 | |
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/12] | FI | 28.08.2019 | |
HR | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/11] | FI | 28.08.2019 | |
HR | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
PT | 30.12.2019 | ||
Former [2020/10] | FI | 28.08.2019 | |
LT | 28.08.2019 | ||
NL | 28.08.2019 | ||
SE | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
PT | 30.12.2019 | ||
Former [2020/09] | FI | 28.08.2019 | |
LT | 28.08.2019 | ||
NL | 28.08.2019 | ||
NO | 28.11.2019 | ||
Former [2020/08] | LT | 28.08.2019 | |
NO | 28.11.2019 | Documents cited: | Search | [A]US2009191857 (HORN GUNTHER [DE], et al) [A] 1-16 * paragraph [0036] - paragraph [0087] *; | [X]US2009205028 (SMEETS BERNARD [SE], et al) [X] 1-16 * paragraph [0007] - paragraph [0008] * * paragraph [0012] - paragraph [0045] * * figure 3 *; | [A]US2010106967 (JOHANSSON MATTIAS [SE], et al) [A] 1-16 * paragraph [0036] - paragraph [0097] * * figure 3 *; | [XA] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Feasibility study on the security aspects of remote provisioning and change of subscription for Machine to Machine (M2M) equipment (Release 9)", 3GPP STANDARD; 3GPP TR 33.812, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100622), no. V9.2.0, pages 1 - 87, XP050441986 [X] 1-12,14-16 * Section 5 and Annex B * [A] 13 | [A] - "Machine-to-Machine communications (M2M); Functional architecture", ETSI DRAFT; 00002V0112, EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE (ETSI), 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS ; FRANCE, (20110510), no. V0.11.2, pages 1 - 197, XP014062936 [A] 1-16 * page 172 - page 189 * | [A] - BADRA M ET AL, "Toward SSL integration in SIM smartcards", WIRELESS COMMUNICATIONS AND NETWORKING CONFERENCE, 2004. WCNC. 2004 IE EE ATLANTA, GA, USA 21-25 MARCH 2004, PISCATAWAY, NJ, USA,IEEE, (20040321), vol. 2, doi:10.1109/WCNC.2004.1311304, ISBN 978-0-7803-8344-9, pages 889 - 894, XP010708248 [A] 1-16 * the whole document * DOI: http://dx.doi.org/10.1109/WCNC.2004.1311304 | [A] - BT ET AL, "Packing details", 3GPP DRAFT; S3-090792, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090504), no. Shanghai; 20090504, XP050347487 [A] 1-16 * the whole document * |