| EP2600664 - Method of communication in a cellular network between a base station and a user equipment [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.11.2015 Database last updated on 19.03.2026 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states ST-Ericsson SA Chemin du Champ-des-Filles 39 1228 Plan-les-Ouates / CH | [2015/02] |
| Former [2013/23] | For all designated states ST-Ericsson SA Chemin du Champ-des-Filles 39 1228 Plan-les-Ouates / CH | Inventor(s) | 01 /
Sfar, Safouane APP 35, 1 AVENUE FRANCOIS CHANCEL 72000 LE MANS / FR | [2013/23] | Representative(s) | Hirsch & Associés 154 Boulevard Haussmann 75008 Paris / FR | [N/P] |
| Former [2013/23] | Hirsch & Associés 58, avenue Marceau 75008 Paris / FR | Application number, filing date | 11306592.4 | 30.11.2011 | [2013/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2600664 | Date: | 05.06.2013 | Language: | EN | [2013/23] | Type: | B1 Patent specification | No.: | EP2600664 | Date: | 07.01.2015 | Language: | EN | [2015/02] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 05.03.2012 | Classification | IPC: | H04W52/34, // H04W52/14, H04W52/36 | [2014/32] | CPC: |
H04W52/343 (EP,US);
H04W52/146 (EP,US);
H04W52/346 (EP,US);
H04W52/367 (EP,US)
|
| Former IPC [2013/23] | H04W52/34 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/23] | Title | German: | Verfahren zur Kommunikation in einem zellularen Netzwerk zwischen einer Basisstation und einem Benutzergerät | [2013/23] | English: | Method of communication in a cellular network between a base station and a user equipment | [2013/23] | French: | Procédé de communication dans un réseau cellulaire entre une station de base et un équipement utilisateur | [2013/23] | Examination procedure | 03.12.2013 | Amendment by applicant (claims and/or description) | 03.12.2013 | Examination requested [2014/02] | 04.09.2014 | Communication of intention to grant the patent | 16.10.2014 | Fee for grant paid | 16.10.2014 | Fee for publishing/printing paid | 16.10.2014 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 04.09.2014 | Opposition(s) | 08.10.2015 | No opposition filed within time limit [2015/51] | Fees paid | Renewal fee | 29.11.2013 | Renewal fee patent year 03 | 25.11.2014 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.11.2011 | AL | 07.01.2015 | AT | 07.01.2015 | BE | 07.01.2015 | CY | 07.01.2015 | CZ | 07.01.2015 | DK | 07.01.2015 | EE | 07.01.2015 | ES | 07.01.2015 | FI | 07.01.2015 | HR | 07.01.2015 | IT | 07.01.2015 | LT | 07.01.2015 | LV | 07.01.2015 | MC | 07.01.2015 | MK | 07.01.2015 | MT | 07.01.2015 | NL | 07.01.2015 | PL | 07.01.2015 | PT | 07.01.2015 | RO | 07.01.2015 | RS | 07.01.2015 | SE | 07.01.2015 | SI | 07.01.2015 | SK | 07.01.2015 | SM | 07.01.2015 | TR | 07.01.2015 | BG | 07.04.2015 | NO | 07.04.2015 | GR | 08.04.2015 | IS | 07.05.2015 | [2018/46] |
| Former [2018/31] | HU | 30.11.2011 | |
| AT | 07.01.2015 | ||
| BE | 07.01.2015 | ||
| CY | 07.01.2015 | ||
| CZ | 07.01.2015 | ||
| DK | 07.01.2015 | ||
| EE | 07.01.2015 | ||
| ES | 07.01.2015 | ||
| FI | 07.01.2015 | ||
| HR | 07.01.2015 | ||
| IT | 07.01.2015 | ||
| LT | 07.01.2015 | ||
| LV | 07.01.2015 | ||
| MC | 07.01.2015 | ||
| MK | 07.01.2015 | ||
| MT | 07.01.2015 | ||
| NL | 07.01.2015 | ||
| PL | 07.01.2015 | ||
| PT | 07.01.2015 | ||
| RO | 07.01.2015 | ||
| RS | 07.01.2015 | ||
| SE | 07.01.2015 | ||
| SI | 07.01.2015 | ||
| SK | 07.01.2015 | ||
| SM | 07.01.2015 | ||
| TR | 07.01.2015 | ||
| BG | 07.04.2015 | ||
| NO | 07.04.2015 | ||
| GR | 08.04.2015 | ||
| IS | 07.05.2015 | ||
| Former [2017/39] | HU | 30.11.2011 | |
| AT | 07.01.2015 | ||
| BE | 07.01.2015 | ||
| CY | 07.01.2015 | ||
| CZ | 07.01.2015 | ||
| DK | 07.01.2015 | ||
| EE | 07.01.2015 | ||
| ES | 07.01.2015 | ||
| FI | 07.01.2015 | ||
| HR | 07.01.2015 | ||
| IT | 07.01.2015 | ||
| LT | 07.01.2015 | ||
| LV | 07.01.2015 | ||
| MC | 07.01.2015 | ||
| MT | 07.01.2015 | ||
| NL | 07.01.2015 | ||
| PL | 07.01.2015 | ||
| RO | 07.01.2015 | ||
| RS | 07.01.2015 | ||
| SE | 07.01.2015 | ||
| SI | 07.01.2015 | ||
| SK | 07.01.2015 | ||
| SM | 07.01.2015 | ||
| BG | 07.04.2015 | ||
| NO | 07.04.2015 | ||
| GR | 08.04.2015 | ||
| IS | 07.05.2015 | ||
| Former [2016/28] | AT | 07.01.2015 | |
| BE | 07.01.2015 | ||
| CZ | 07.01.2015 | ||
| DK | 07.01.2015 | ||
| EE | 07.01.2015 | ||
| ES | 07.01.2015 | ||
| FI | 07.01.2015 | ||
| HR | 07.01.2015 | ||
| IT | 07.01.2015 | ||
| LT | 07.01.2015 | ||
| LV | 07.01.2015 | ||
| MC | 07.01.2015 | ||
| NL | 07.01.2015 | ||
| PL | 07.01.2015 | ||
| RO | 07.01.2015 | ||
| RS | 07.01.2015 | ||
| SE | 07.01.2015 | ||
| SI | 07.01.2015 | ||
| SK | 07.01.2015 | ||
| BG | 07.04.2015 | ||
| NO | 07.04.2015 | ||
| GR | 08.04.2015 | ||
| IS | 07.05.2015 | ||
| Former [2016/24] | AT | 07.01.2015 | |
| BE | 07.01.2015 | ||
| CZ | 07.01.2015 | ||
| DK | 07.01.2015 | ||
| EE | 07.01.2015 | ||
| ES | 07.01.2015 | ||
| FI | 07.01.2015 | ||
| HR | 07.01.2015 | ||
| IT | 07.01.2015 | ||
| LT | 07.01.2015 | ||
| LV | 07.01.2015 | ||
| NL | 07.01.2015 | ||
| PL | 07.01.2015 | ||
| RO | 07.01.2015 | ||
| RS | 07.01.2015 | ||
| SE | 07.01.2015 | ||
| SI | 07.01.2015 | ||
| SK | 07.01.2015 | ||
| BG | 07.04.2015 | ||
| NO | 07.04.2015 | ||
| GR | 08.04.2015 | ||
| IS | 07.05.2015 | ||
| Former [2016/12] | AT | 07.01.2015 | |
| CZ | 07.01.2015 | ||
| DK | 07.01.2015 | ||
| EE | 07.01.2015 | ||
| ES | 07.01.2015 | ||
| FI | 07.01.2015 | ||
| HR | 07.01.2015 | ||
| IT | 07.01.2015 | ||
| LT | 07.01.2015 | ||
| LV | 07.01.2015 | ||
| NL | 07.01.2015 | ||
| PL | 07.01.2015 | ||
| RO | 07.01.2015 | ||
| RS | 07.01.2015 | ||
| SE | 07.01.2015 | ||
| SI | 07.01.2015 | ||
| SK | 07.01.2015 | ||
| BG | 07.04.2015 | ||
| NO | 07.04.2015 | ||
| GR | 08.04.2015 | ||
| IS | 07.05.2015 | ||
| Former [2016/03] | AT | 07.01.2015 | |
| CZ | 07.01.2015 | ||
| DK | 07.01.2015 | ||
| EE | 07.01.2015 | ||
| ES | 07.01.2015 | ||
| FI | 07.01.2015 | ||
| HR | 07.01.2015 | ||
| IT | 07.01.2015 | ||
| LT | 07.01.2015 | ||
| LV | 07.01.2015 | ||
| NL | 07.01.2015 | ||
| PL | 07.01.2015 | ||
| RO | 07.01.2015 | ||
| RS | 07.01.2015 | ||
| SE | 07.01.2015 | ||
| SK | 07.01.2015 | ||
| BG | 07.04.2015 | ||
| NO | 07.04.2015 | ||
| GR | 08.04.2015 | ||
| IS | 07.05.2015 | ||
| Former [2015/49] | AT | 07.01.2015 | |
| CZ | 07.01.2015 | ||
| DK | 07.01.2015 | ||
| EE | 07.01.2015 | ||
| ES | 07.01.2015 | ||
| FI | 07.01.2015 | ||
| HR | 07.01.2015 | ||
| LT | 07.01.2015 | ||
| LV | 07.01.2015 | ||
| NL | 07.01.2015 | ||
| PL | 07.01.2015 | ||
| RO | 07.01.2015 | ||
| RS | 07.01.2015 | ||
| SE | 07.01.2015 | ||
| SK | 07.01.2015 | ||
| BG | 07.04.2015 | ||
| NO | 07.04.2015 | ||
| GR | 08.04.2015 | ||
| IS | 07.05.2015 | ||
| Former [2015/39] | AT | 07.01.2015 | |
| ES | 07.01.2015 | ||
| FI | 07.01.2015 | ||
| HR | 07.01.2015 | ||
| LT | 07.01.2015 | ||
| LV | 07.01.2015 | ||
| NL | 07.01.2015 | ||
| PL | 07.01.2015 | ||
| RS | 07.01.2015 | ||
| SE | 07.01.2015 | ||
| BG | 07.04.2015 | ||
| NO | 07.04.2015 | ||
| GR | 08.04.2015 | ||
| IS | 07.05.2015 | ||
| Former [2015/38] | AT | 07.01.2015 | |
| ES | 07.01.2015 | ||
| FI | 07.01.2015 | ||
| HR | 07.01.2015 | ||
| LT | 07.01.2015 | ||
| PL | 07.01.2015 | ||
| SE | 07.01.2015 | ||
| BG | 07.04.2015 | ||
| NO | 07.04.2015 | ||
| GR | 08.04.2015 | ||
| IS | 07.05.2015 | ||
| Former [2015/37] | ES | 07.01.2015 | |
| FI | 07.01.2015 | ||
| HR | 07.01.2015 | ||
| LT | 07.01.2015 | ||
| PL | 07.01.2015 | ||
| SE | 07.01.2015 | ||
| BG | 07.04.2015 | ||
| NO | 07.04.2015 | ||
| GR | 08.04.2015 | ||
| Former [2015/36] | ES | 07.01.2015 | |
| FI | 07.01.2015 | ||
| HR | 07.01.2015 | ||
| LT | 07.01.2015 | ||
| SE | 07.01.2015 | ||
| BG | 07.04.2015 | ||
| NO | 07.04.2015 | ||
| Former [2015/35] | ES | 07.01.2015 | |
| LT | 07.01.2015 | ||
| NO | 07.04.2015 | ||
| Former [2015/33] | ES | 07.01.2015 | Documents cited: | Search | [A] US2011287804 (SEO DONG YOUN et al.) | [A] ROBERT MLLNER ET AL: "Enhancing uplink performance in UTRAN LTE networks by load adaptive power control", EUROPEAN TRANSACTIONS ON TELECOMMUNICATIONS, WILEY & SONS, CHICHESTER, GB, vol. 21, no. 5, 1 August 2010 (2010-08-01), pages 458 - 468, XP001557117, ISSN: 1124-318X, DOI: 10.1002/ETT.1426 DOI: http://dx.doi.org/10.1002/ett.1426 | by applicant | WO2011035807 |