EP2536289 - BAKERY PROCESS AND BAKERY SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.04.2020 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 03.05.2019 | ||
Former | Grant of patent is intended Status updated on 12.12.2018 | ||
Former | Examination is in progress Status updated on 01.10.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Loiselet, Michel Le Causse 12490 Montjaux / FR | [2019/23] |
Former [2012/52] | For all designated states Loiselet, Michel Le Causse 12490 Montjaux / FR | Inventor(s) | 01 /
see applicant ... | [2012/52] | Representative(s) | Henck, Lilian Cabinet Germain & Maureau 12, rue Boileau 69006 Lyon / FR | [2019/23] | Application number, filing date | 11709986.1 | 15.02.2011 | [2019/23] | WO2011FR00089 | Priority number, date | FR20100000631 | 16.02.2010 Original published format: FR 1000631 | [2012/52] | Filing language | FR | Procedural language | FR | Publication | Type: | A2 Application without search report | No.: | WO2011101556 | Date: | 25.08.2011 | Language: | FR | [2011/34] | Type: | A2 Application without search report | No.: | EP2536289 | Date: | 26.12.2012 | Language: | FR | The application published by WIPO in one of the EPO official languages on 25.08.2011 takes the place of the publication of the European patent application. | [2012/52] | Type: | B1 Patent specification | No.: | EP2536289 | Date: | 05.06.2019 | Language: | FR | [2019/23] | Search report(s) | International search report - published on: | EP | 10.11.2011 | Classification | IPC: | A21D8/02, A21B7/00, A21C1/00, A21C11/14 | [2012/52] | CPC: |
A21D8/02 (EP);
A21B7/00 (EP);
A21C11/02 (EP);
A21C11/10 (EP);
A21C13/00 (EP);
A21C1/003 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | BACKVERFAHREN UND BACKANLAGE | [2019/01] | English: | BAKERY PROCESS AND BAKERY SYSTEM | [2012/52] | French: | PROCEDE ET INSTALLATIONS DE BOULANGERIE | [2012/52] |
Former [2012/52] | BACKPROZESS UND BACKSYSTEM | Entry into regional phase | 12.09.2012 | National basic fee paid | 12.09.2012 | Designation fee(s) paid | 12.09.2012 | Examination fee paid | Examination procedure | 11.09.2012 | Amendment by applicant (claims and/or description) | 12.09.2012 | Examination requested [2012/52] | 12.05.2014 | Despatch of a communication from the examining division (Time limit: M06) | 22.12.2014 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 02.03.2015 | Reply to a communication from the examining division | 20.09.2018 | Despatch of a communication from the examining division (Time limit: M02) | 05.11.2018 | Reply to a communication from the examining division | 13.12.2018 | Communication of intention to grant the patent | 23.04.2019 | Fee for grant paid | 23.04.2019 | Fee for publishing/printing paid | 23.04.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.05.2014 | Opposition(s) | 06.03.2020 | No opposition filed within time limit [2020/20] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 02.03.2015 | Request for further processing filed | 02.03.2015 | Full payment received (date of receipt of payment) Request granted | 16.03.2015 | Decision despatched | Fees paid | Renewal fee | 12.08.2013 | Renewal fee patent year 03 | 26.08.2014 | Renewal fee patent year 04 | 27.02.2015 | Renewal fee patent year 05 | 31.08.2016 | Renewal fee patent year 06 | 28.02.2017 | Renewal fee patent year 07 | 29.08.2018 | Renewal fee patent year 08 | 28.02.2019 | Renewal fee patent year 09 | Penalty fee | Additional fee for renewal fee | 28.02.2013 | 03   M06   Fee paid on   12.08.2013 | 28.02.2014 | 04   M06   Fee paid on   26.08.2014 | 29.02.2016 | 06   M06   Fee paid on   31.08.2016 | 28.02.2018 | 08   M06   Fee paid on   29.08.2018 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.02.2011 | AL | 05.06.2019 | AT | 05.06.2019 | CY | 05.06.2019 | CZ | 05.06.2019 | DK | 05.06.2019 | EE | 05.06.2019 | ES | 05.06.2019 | FI | 05.06.2019 | HR | 05.06.2019 | IT | 05.06.2019 | LT | 05.06.2019 | LV | 05.06.2019 | MC | 05.06.2019 | MK | 05.06.2019 | MT | 05.06.2019 | NL | 05.06.2019 | PL | 05.06.2019 | RO | 05.06.2019 | RS | 05.06.2019 | SE | 05.06.2019 | SI | 05.06.2019 | SK | 05.06.2019 | SM | 05.06.2019 | TR | 05.06.2019 | BG | 05.09.2019 | NO | 05.09.2019 | GR | 06.09.2019 | IS | 05.10.2019 | PT | 07.10.2019 | IE | 15.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | [2022/32] |
Former [2022/27] | HU | 15.02.2011 | |
AL | 05.06.2019 | ||
AT | 05.06.2019 | ||
CY | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
MT | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
IE | 15.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/08] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
IE | 15.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/52] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/49] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/25] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/22] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/17] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/13] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/12] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/11] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
PT | 07.10.2019 | ||
Former [2020/10] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
PT | 07.10.2019 | ||
Former [2020/09] | AL | 05.06.2019 | |
CZ | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2020/07] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/51] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/50] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/49] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
Former [2019/48] | ES | 05.06.2019 | |
FI | 05.06.2019 | ||
LT | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
Former [2019/47] | ES | 05.06.2019 | |
FI | 05.06.2019 | ||
LT | 05.06.2019 | ||
NO | 05.09.2019 | Cited in | International search | [A]US2869484 (PATTERSON CURTIS J) [A] 1-4 * examples I,II * * claims 1,2,3,4 *; | [A]US2215957 (JACOB FREILICH, et al) [A] 1-4 * page 2, column l, line 31 - page 3, column r, line 55 * * claims 1-10 *; | [A]EP0358455 (NABISCO BRANDS INC [US]) [A] 1-4 * column 3, lines 12-19 * * column 4, line 57 - column 5, line 55 * * example 1 *; | [A]US4207346 (COCHRAN STUART A [US], et al) [A] 1-4 * column 3, line 35 - column 4, line 31 * * claims 1,23 *; | [A]WO2004047926 (DSM IP ASSETS BV [NL], et al) [A] 1-4 * example 5 *; | [I]US2008274231 (JONNIAUX JEAN-LUC [BE], et al) [I] 1-4 * example 6 *; | [A]US2004191362 (INDRANI DASAPPA [IN], et al) [A] 1-3 * example 13 *; | [A]WO2005063026 (COUNCIL SCIENT IND RES [IN], et al) [A] 1,4 * example 4 * * claim 5 *; | [A]FR2640470 (LEVEQUE MAURICE [FR]) [A] 1,4 * the whole document *; | [A]FR2709045 (TOUPET JOSEPH [FR]) [A] 1,4 * the whole document *; | [A]US2006233935 (VAN HAESENDONCK INGRID P H [BE], et al) [A] 1,3 * examples 2,3,6,9,10 * | Examination | GB2468114 | by applicant | FR2867658 | FR2870676 |