EP2547768 - MODIFIED U7 SNRNAS FOR TREATMENT OF NEUROMUSCULAR DISEASES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.11.2016 Database last updated on 14.11.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states Association Institut de Myologie Bâtiment Babinski 47-83, Boulevard de l'Hôpital 75013 Paris / FR | [2013/04] | Inventor(s) | 01 /
GARCIA, Luis 1 rue François Boulin F-78870 Bailly / FR | 02 /
FURLING, Denis 4 rue Primatice F-75013 Paris / FR | 03 /
BELEY, Cyriaque 13 square Beethoven F-78330 Fontenay le Fleury / FR | 04 /
VOIT, Thomas 18 rue du Tartelet F-91470 Boulay-les-Troux / FR | [2013/04] | Representative(s) | Regimbeau 20, rue de Chazelles 75847 Paris Cedex 17 / FR | [2013/04] | Application number, filing date | 11710168.3 | 17.03.2011 | [2016/01] | WO2011EP54026 | Priority number, date | US20100314830P | 17.03.2010 Original published format: US 314830 P | [2013/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011113889 | Date: | 22.09.2011 | Language: | EN | [2011/38] | Type: | A1 Application with search report | No.: | EP2547768 | Date: | 23.01.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.09.2011 takes the place of the publication of the European patent application. | [2013/04] | Type: | B1 Patent specification | No.: | EP2547768 | Date: | 30.12.2015 | Language: | EN | [2015/53] | Search report(s) | International search report - published on: | EP | 22.09.2011 | Classification | IPC: | C12N15/11, A61K31/7088, A61K48/00 | [2013/04] | CPC: |
C12N15/111 (EP,US);
A61P21/00 (EP);
A61P25/00 (EP);
C12N2310/11 (EP,US);
C12N2310/531 (EP,US);
C12N2320/33 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | MODIFIZIERTE U7-SNRNAS ZUR BEHANDLUNG VON NEUROMUSKULÄRER KRANKHEITEN | [2013/04] | English: | MODIFIED U7 SNRNAS FOR TREATMENT OF NEUROMUSCULAR DISEASES | [2013/04] | French: | SNARN U7 MODIFIÉS POUR TRAITER LES MALADIES NEUROMUSCULAIRES | [2013/04] | Entry into regional phase | 16.10.2012 | National basic fee paid | 16.10.2012 | Designation fee(s) paid | 16.10.2012 | Examination fee paid | Examination procedure | 16.10.2012 | Examination requested [2013/04] | 09.07.2013 | Despatch of a communication from the examining division (Time limit: M06) | 20.01.2014 | Reply to a communication from the examining division | 25.06.2014 | Despatch of a communication from the examining division (Time limit: M06) | 03.02.2015 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 13.02.2015 | Reply to a communication from the examining division | 06.07.2015 | Communication of intention to grant the patent | 28.10.2015 | Fee for grant paid | 28.10.2015 | Fee for publishing/printing paid | 28.10.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.07.2013 | Opposition(s) | 03.10.2016 | No opposition filed within time limit [2016/49] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 13.02.2015 | Request for further processing filed | 13.02.2015 | Full payment received (date of receipt of payment) Request granted | 02.03.2015 | Decision despatched | Fees paid | Renewal fee | 26.03.2013 | Renewal fee patent year 03 | 26.03.2014 | Renewal fee patent year 04 | 10.03.2015 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.03.2011 | AL | 30.12.2015 | AT | 30.12.2015 | BG | 30.12.2015 | CY | 30.12.2015 | CZ | 30.12.2015 | DK | 30.12.2015 | EE | 30.12.2015 | FI | 30.12.2015 | HR | 30.12.2015 | LT | 30.12.2015 | LV | 30.12.2015 | MC | 30.12.2015 | MK | 30.12.2015 | PL | 30.12.2015 | RO | 30.12.2015 | RS | 30.12.2015 | SE | 30.12.2015 | SI | 30.12.2015 | SK | 30.12.2015 | SM | 30.12.2015 | TR | 30.12.2015 | IE | 17.03.2016 | LU | 17.03.2016 | NO | 30.03.2016 | GR | 31.03.2016 | MT | 31.03.2016 | IS | 30.04.2016 | PT | 02.05.2016 | [2018/46] |
Former [2018/38] | HU | 17.03.2011 | |
AT | 30.12.2015 | ||
BG | 30.12.2015 | ||
CY | 30.12.2015 | ||
CZ | 30.12.2015 | ||
DK | 30.12.2015 | ||
EE | 30.12.2015 | ||
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
MC | 30.12.2015 | ||
MK | 30.12.2015 | ||
PL | 30.12.2015 | ||
RO | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
SI | 30.12.2015 | ||
SK | 30.12.2015 | ||
SM | 30.12.2015 | ||
TR | 30.12.2015 | ||
IE | 17.03.2016 | ||
LU | 17.03.2016 | ||
NO | 30.03.2016 | ||
GR | 31.03.2016 | ||
MT | 31.03.2016 | ||
IS | 30.04.2016 | ||
PT | 02.05.2016 | ||
Former [2018/31] | HU | 17.03.2011 | |
AT | 30.12.2015 | ||
CY | 30.12.2015 | ||
CZ | 30.12.2015 | ||
DK | 30.12.2015 | ||
EE | 30.12.2015 | ||
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
MC | 30.12.2015 | ||
MK | 30.12.2015 | ||
PL | 30.12.2015 | ||
RO | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
SI | 30.12.2015 | ||
SK | 30.12.2015 | ||
SM | 30.12.2015 | ||
TR | 30.12.2015 | ||
IE | 17.03.2016 | ||
LU | 17.03.2016 | ||
NO | 30.03.2016 | ||
GR | 31.03.2016 | ||
MT | 31.03.2016 | ||
IS | 30.04.2016 | ||
PT | 02.05.2016 | ||
Former [2018/29] | HU | 17.03.2011 | |
AT | 30.12.2015 | ||
CY | 30.12.2015 | ||
CZ | 30.12.2015 | ||
DK | 30.12.2015 | ||
EE | 30.12.2015 | ||
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
MC | 30.12.2015 | ||
MK | 30.12.2015 | ||
MT | 30.12.2015 | ||
PL | 30.12.2015 | ||
RO | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
SI | 30.12.2015 | ||
SK | 30.12.2015 | ||
SM | 30.12.2015 | ||
TR | 30.12.2015 | ||
IE | 17.03.2016 | ||
LU | 17.03.2016 | ||
NO | 30.03.2016 | ||
GR | 31.03.2016 | ||
IS | 30.04.2016 | ||
PT | 02.05.2016 | ||
Former [2018/28] | HU | 17.03.2011 | |
AT | 30.12.2015 | ||
CY | 30.12.2015 | ||
CZ | 30.12.2015 | ||
DK | 30.12.2015 | ||
EE | 30.12.2015 | ||
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
MC | 30.12.2015 | ||
MK | 30.12.2015 | ||
MT | 30.12.2015 | ||
PL | 30.12.2015 | ||
RO | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
SI | 30.12.2015 | ||
SK | 30.12.2015 | ||
SM | 30.12.2015 | ||
IE | 17.03.2016 | ||
LU | 17.03.2016 | ||
NO | 30.03.2016 | ||
GR | 31.03.2016 | ||
IS | 30.04.2016 | ||
PT | 02.05.2016 | ||
Former [2017/41] | AT | 30.12.2015 | |
CZ | 30.12.2015 | ||
DK | 30.12.2015 | ||
EE | 30.12.2015 | ||
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
MC | 30.12.2015 | ||
MT | 30.12.2015 | ||
PL | 30.12.2015 | ||
RO | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
SI | 30.12.2015 | ||
SK | 30.12.2015 | ||
SM | 30.12.2015 | ||
IE | 17.03.2016 | ||
LU | 17.03.2016 | ||
NO | 30.03.2016 | ||
GR | 31.03.2016 | ||
IS | 30.04.2016 | ||
PT | 02.05.2016 | ||
Former [2017/16] | AT | 30.12.2015 | |
CZ | 30.12.2015 | ||
DK | 30.12.2015 | ||
EE | 30.12.2015 | ||
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
MC | 30.12.2015 | ||
PL | 30.12.2015 | ||
RO | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
SI | 30.12.2015 | ||
SK | 30.12.2015 | ||
SM | 30.12.2015 | ||
IE | 17.03.2016 | ||
LU | 17.03.2016 | ||
NO | 30.03.2016 | ||
BE | 31.03.2016 | ||
GR | 31.03.2016 | ||
IS | 30.04.2016 | ||
PT | 02.05.2016 | ||
Former [2017/07] | AT | 30.12.2015 | |
CZ | 30.12.2015 | ||
DK | 30.12.2015 | ||
EE | 30.12.2015 | ||
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
MC | 30.12.2015 | ||
PL | 30.12.2015 | ||
RO | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
SK | 30.12.2015 | ||
SM | 30.12.2015 | ||
IE | 17.03.2016 | ||
LU | 17.03.2016 | ||
NO | 30.03.2016 | ||
BE | 31.03.2016 | ||
GR | 31.03.2016 | ||
IS | 30.04.2016 | ||
PT | 02.05.2016 | ||
Former [2016/49] | AT | 30.12.2015 | |
CZ | 30.12.2015 | ||
DK | 30.12.2015 | ||
EE | 30.12.2015 | ||
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
MC | 30.12.2015 | ||
PL | 30.12.2015 | ||
RO | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
SK | 30.12.2015 | ||
SM | 30.12.2015 | ||
LU | 17.03.2016 | ||
NO | 30.03.2016 | ||
BE | 31.03.2016 | ||
GR | 31.03.2016 | ||
IS | 30.04.2016 | ||
PT | 02.05.2016 | ||
Former [2016/47] | AT | 30.12.2015 | |
CZ | 30.12.2015 | ||
DK | 30.12.2015 | ||
EE | 30.12.2015 | ||
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
PL | 30.12.2015 | ||
RO | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
SK | 30.12.2015 | ||
SM | 30.12.2015 | ||
LU | 17.03.2016 | ||
NO | 30.03.2016 | ||
BE | 31.03.2016 | ||
GR | 31.03.2016 | ||
IS | 30.04.2016 | ||
PT | 02.05.2016 | ||
Former [2016/46] | AT | 30.12.2015 | |
CZ | 30.12.2015 | ||
DK | 30.12.2015 | ||
EE | 30.12.2015 | ||
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
PL | 30.12.2015 | ||
RO | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
SK | 30.12.2015 | ||
SM | 30.12.2015 | ||
NO | 30.03.2016 | ||
BE | 31.03.2016 | ||
GR | 31.03.2016 | ||
IS | 30.04.2016 | ||
PT | 02.05.2016 | ||
Former [2016/38] | AT | 30.12.2015 | |
CZ | 30.12.2015 | ||
EE | 30.12.2015 | ||
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
PL | 30.12.2015 | ||
RO | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
SK | 30.12.2015 | ||
SM | 30.12.2015 | ||
NO | 30.03.2016 | ||
BE | 31.03.2016 | ||
GR | 31.03.2016 | ||
IS | 30.04.2016 | ||
PT | 02.05.2016 | ||
Former [2016/36] | AT | 30.12.2015 | |
CZ | 30.12.2015 | ||
EE | 30.12.2015 | ||
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
PL | 30.12.2015 | ||
RO | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
SK | 30.12.2015 | ||
NO | 30.03.2016 | ||
BE | 31.03.2016 | ||
GR | 31.03.2016 | ||
Former [2016/34] | CZ | 30.12.2015 | |
FI | 30.12.2015 | ||
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
NO | 30.03.2016 | ||
GR | 31.03.2016 | ||
Former [2016/25] | FI | 30.12.2015 | |
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
LV | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
NO | 30.03.2016 | ||
GR | 31.03.2016 | ||
Former [2016/24] | FI | 30.12.2015 | |
HR | 30.12.2015 | ||
LT | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
NO | 30.03.2016 | ||
GR | 31.03.2016 | ||
Former [2016/23] | HR | 30.12.2015 | |
LT | 30.12.2015 | ||
RS | 30.12.2015 | ||
SE | 30.12.2015 | ||
NO | 30.03.2016 | ||
Former [2016/21] | LT | 30.12.2015 | |
NO | 30.03.2016 | ||
Former [2016/20] | LT | 30.12.2015 | Cited in | International search | [A]US2003036519 (KOLE RYSZARD [US], et al); | [A]US2003114411 (KOLE RYSZARD [US], et al); | [AD]WO2006021724 (GENETHON [FR], et al); | by applicant | WO9710343 | WO2006021724 | WO2008118820 | US2008280362 | WO2009027351 | EP2096169 |