EP2558025 - ANCHOR PIN STENT-GRAFT [Right-click to bookmark this link] | |||
Former [2013/08] | ANCHOR PIN STENT-GRAFT DELIVERY SYSTEM | ||
[2020/07] | Status | No opposition filed within time limit Status updated on 26.03.2021 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 17.04.2020 | ||
Former | Grant of patent is intended Status updated on 05.02.2020 | ||
Former | Examination is in progress Status updated on 28.12.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Medtronic Vascular Inc. IP Legal Department 3576 Unocal Place Santa Rosa, CA 95403 / US | [2013/08] | Inventor(s) | 01 /
ARGENTINE, Jeffery c/o IP Legal Department Medtronic Vascular Inc. 3576 Unocal Place Santa Rosa, CA 95403 / US | [2013/08] | Representative(s) | Zimmermann & Partner Patentanwälte mbB Postfach 330 920 80069 München / DE | [2020/21] |
Former [2013/08] | Zimmermann & Partner Josephspitalstr. 15 80331 München / DE | Application number, filing date | 11710651.8 | 21.03.2011 | [2020/21] | WO2011US29151 | Priority number, date | US20100759433 | 13.04.2010 Original published format: US 759433 | [2013/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011129949 | Date: | 20.10.2011 | Language: | EN | [2011/42] | Type: | A1 Application with search report | No.: | EP2558025 | Date: | 20.02.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.10.2011 takes the place of the publication of the European patent application. | [2013/08] | Type: | B1 Patent specification | No.: | EP2558025 | Date: | 20.05.2020 | Language: | EN | [2020/21] | Search report(s) | International search report - published on: | EP | 20.10.2011 | Classification | IPC: | A61F2/07 | [2020/07] | CPC: |
A61F2/07 (EP,US);
A61F2/848 (EP,US);
A61F2/89 (EP,US);
A61F2002/075 (EP,US);
A61F2002/8483 (EP,US);
A61F2002/9505 (EP,US);
|
Former IPC [2013/08] | A61F2/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | STENTPROTHESE MIT VERANKERUNGSSTIFTEN | [2020/07] | English: | ANCHOR PIN STENT-GRAFT | [2020/07] | French: | GREFFE D'ENDOPROTHÈSE À POINTE D'ANCRAGE | [2020/07] |
Former [2013/08] | FREISETZUNGSSYSTEM FÜR EINE STENTPROTHESE MIT VERANKERUNGSSTIFT | ||
Former [2013/08] | ANCHOR PIN STENT-GRAFT DELIVERY SYSTEM | ||
Former [2013/08] | SYSTÈME D'IMPLANTATION DE GREFFE D'ENDOPROTHÈSE À POINTE D'ANCRAGE | Entry into regional phase | 25.10.2012 | National basic fee paid | 25.10.2012 | Designation fee(s) paid | 25.10.2012 | Examination fee paid | Examination procedure | 25.10.2012 | Examination requested [2013/08] | 15.05.2013 | Amendment by applicant (claims and/or description) | 17.03.2016 | Despatch of a communication from the examining division (Time limit: M04) | 15.07.2016 | Reply to a communication from the examining division | 15.12.2017 | Despatch of a communication from the examining division (Time limit: M04) | 22.03.2018 | Reply to a communication from the examining division | 06.02.2020 | Communication of intention to grant the patent | 14.04.2020 | Fee for grant paid | 14.04.2020 | Fee for publishing/printing paid | 14.04.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.03.2016 | Opposition(s) | 23.02.2021 | No opposition filed within time limit [2021/17] | Fees paid | Renewal fee | 27.03.2013 | Renewal fee patent year 03 | 27.03.2014 | Renewal fee patent year 04 | 27.03.2015 | Renewal fee patent year 05 | 31.03.2016 | Renewal fee patent year 06 | 27.03.2017 | Renewal fee patent year 07 | 27.03.2018 | Renewal fee patent year 08 | 22.03.2019 | Renewal fee patent year 09 | 20.03.2020 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.03.2011 | AL | 20.05.2020 | AT | 20.05.2020 | CY | 20.05.2020 | CZ | 20.05.2020 | DK | 20.05.2020 | EE | 20.05.2020 | ES | 20.05.2020 | FI | 20.05.2020 | HR | 20.05.2020 | IT | 20.05.2020 | LT | 20.05.2020 | LV | 20.05.2020 | MC | 20.05.2020 | MK | 20.05.2020 | NL | 20.05.2020 | PL | 20.05.2020 | RO | 20.05.2020 | RS | 20.05.2020 | SE | 20.05.2020 | SI | 20.05.2020 | SK | 20.05.2020 | SM | 20.05.2020 | TR | 20.05.2020 | BG | 20.08.2020 | NO | 20.08.2020 | GR | 21.08.2020 | IS | 20.09.2020 | PT | 21.09.2020 | [2024/29] |
Former [2024/22] | HU | 21.03.2011 | |
AL | 20.05.2020 | ||
AT | 20.05.2020 | ||
CY | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
MK | 20.05.2020 | ||
NL | 20.05.2020 | ||
PL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2023/27] | HU | 21.03.2011 | |
AL | 20.05.2020 | ||
AT | 20.05.2020 | ||
CY | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
PL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2023/24] | AL | 20.05.2020 | |
AT | 20.05.2020 | ||
CY | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
PL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/45] | AL | 20.05.2020 | |
AT | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
MC | 20.05.2020 | ||
NL | 20.05.2020 | ||
PL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/24] | AL | 20.05.2020 | |
AT | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
PL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SI | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/10] | AL | 20.05.2020 | |
AT | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
PL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SK | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/09] | AL | 20.05.2020 | |
AT | 20.05.2020 | ||
CZ | 20.05.2020 | ||
DK | 20.05.2020 | ||
EE | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
IT | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/08] | AL | 20.05.2020 | |
DK | 20.05.2020 | ||
ES | 20.05.2020 | ||
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
RO | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
SM | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/04] | AL | 20.05.2020 | |
FI | 20.05.2020 | ||
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
NL | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2021/01] | FI | 20.05.2020 | |
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
BG | 20.08.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2020/51] | FI | 20.05.2020 | |
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
RS | 20.05.2020 | ||
SE | 20.05.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2020/50] | FI | 20.05.2020 | |
HR | 20.05.2020 | ||
LT | 20.05.2020 | ||
LV | 20.05.2020 | ||
SE | 20.05.2020 | ||
NO | 20.08.2020 | ||
GR | 21.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2020/48] | FI | 20.05.2020 | |
LT | 20.05.2020 | ||
SE | 20.05.2020 | ||
NO | 20.08.2020 | ||
IS | 20.09.2020 | ||
PT | 21.09.2020 | ||
Former [2020/47] | LT | 20.05.2020 | |
NO | 20.08.2020 | ||
IS | 20.09.2020 | ||
Former [2020/46] | IS | 20.09.2020 | Cited in | International search | [X]WO9618361 (ENDOVASCULAR TECH INC [US]) [X] 1 * figure 25 * * page 25, line 20 - page 26, line 14 *; | [XI]US2004153143 (QUIACHON DINAH B [US], et al) [X] 1-14,17-19 * figure 18 * * paragraph [0129] * [I] 15,16; | [A]US2005165441 (MCGUCKIN JAMES F JR [US], et al) [A] 1-19* figure 11f *; | [X]US2008027529 (HARTLEY DAVID E [AU], et al) [X] 1 * figures 4a-4c *; | [X]US2009082846 (CHOBOTOV MICHAEL V [US]) [X] 1 * figure 3 * |