blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2616409

EP2616409 - BUILDING MATERIAL AND BUILDING SYSTEM ELEMENT AND ALSO PROCESSES FOR THE PRODUCTION THEREOF [Right-click to bookmark this link]
StatusThe application has been refused
Status updated on  23.10.2015
Database last updated on 05.10.2024
Most recent event   Tooltip23.10.2015Refusal of applicationpublished on 25.11.2015  [2015/48]
Applicant(s)For all designated states
Vicat
Tour Manhattan 6 place de l'Iris
92095 Paris La Défense / FR
[2013/30]
Inventor(s)01 / STÄHLI, Beat
Oberholz 15
CH-3054 Schüpfen / CH
02 / RYTZ, Gerhard
Schwarzenburgstrasse 6
CH-3007 Bern / CH
03 / RUCHTI, Beat
Dreihubelweg 40
CH-3250 Lyss / CH
 [2013/30]
Representative(s)BOVARD AG
Patent- und Markenanwälte
Optingenstrasse 16
3013 Bern / CH
[N/P]
Former [2013/30]BOVARD AG
Optingenstrasse 16
3000 Bern 25 / CH
Application number, filing date11725766.717.06.2011
WO2011EP60159
Priority number, dateCH2010000149216.09.2010         Original published format: CH 14922010
[2013/30]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2012034724
Date:22.03.2012
Language:DE
[2012/12]
Type: A1 Application with search report 
No.:EP2616409
Date:24.07.2013
Language:DE
The application published by WIPO in one of the EPO official languages on 22.03.2012 takes the place of the publication of the European patent application.
[2013/30]
Search report(s)International search report - published on:EP22.03.2012
ClassificationIPC:C04B28/02, C04B38/02, C04B38/08
[2013/30]
CPC:
C04B28/02 (EP,US); C04B22/04 (US); B29C44/12 (US);
C04B38/02 (EP,US); C04B38/08 (EP,US); E04C1/40 (US);
C04B2111/00612 (EP,US); C04B2111/28 (EP,US); C04B2111/40 (EP,US);
C04B2111/52 (EP,US); Y10T428/249968 (EP,US) (-)
C-Set:
C04B28/02, C04B14/06, C04B14/28, C04B41/4582 (EP,US);
C04B38/02, C04B14/28, C04B22/04, C04B28/04, C04B38/0051, C04B38/0074, C04B41/5079 (US,EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/30]
TitleGerman:BAUSTOFF UND BAUSYSTEM-ELEMENT SOWIE VERFAHREN ZUR HERSTELLUNG DERSELBEN[2013/30]
English:BUILDING MATERIAL AND BUILDING SYSTEM ELEMENT AND ALSO PROCESSES FOR THE PRODUCTION THEREOF[2013/30]
French:MATÉRIAU DE CONSTRUCTION ET ÉLÉMENT D'UN SYSTÈME DE CONSTRUCTION ET PROCÉDÉ POUR LES FABRIQUER[2013/30]
Entry into regional phase01.03.2013National basic fee paid 
01.03.2013Designation fee(s) paid 
01.03.2013Examination fee paid 
Examination procedure16.07.2012Request for preliminary examination filed
International Preliminary Examining Authority: EP
01.03.2013Examination requested  [2013/30]
14.11.2013Amendment by applicant (claims and/or description)
17.02.2014Despatch of a communication from the examining division (Time limit: M04)
18.06.2014Reply to a communication from the examining division
04.07.2014Despatch of a communication from the examining division (Time limit: M04)
03.11.2014Reply to a communication from the examining division
21.05.2015Date of oral proceedings
06.07.2015Despatch of communication that the application is refused, reason: substantive examination [2015/48]
06.07.2015Minutes of oral proceedings despatched
16.07.2015Application refused, date of legal effect [2015/48]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  17.02.2014
Fees paidRenewal fee
19.04.2013Renewal fee patent year 03
11.04.2014Renewal fee patent year 04
27.04.2015Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]GB2324105  (HYDERABAD IND LIMITED [IN]) [X] 1-5,8-11,13-17 * abstract * * page 1, paragraph 4 * * page 2, paragraph 3 *;
 [X]WO2004063124  (COMMW SCIENT IND RES ORG [AU], et al) [X] 1-9 * page 2, paragraphs 3,4 * * page 11, paragraph 4 ** examples 1,2 *;
 [X]CN101619598  (JIANGUO WANG) [X] 1,2,10,12-16 * the whole document *
by applicantEP0049348
 US5110084
 EP0647603
 GB2324105
 WO2004063124
 EP1988228
 CN101619598
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.