Extract from the Register of European Patents

EP About this file: EP2569102

EP2569102 - SYSTEM FOR TREATMENT OF MUNICIPAL SOLID WASTE [Right-click to bookmark this link]
Former [2013/12]COLD METHOD AND TREATMENT SYSTEM OF MUNICIPAL SOLID WASTE
[2020/49]
StatusNo opposition filed within time limit
Status updated on  17.06.2022
Database last updated on 14.03.2026
FormerThe patent has been granted
Status updated on  09.07.2021
FormerGrant of patent is intended
Status updated on  23.11.2020
FormerExamination is in progress
Status updated on  29.09.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
SR Technologies (SRT) Ltd.
67A Postoyanstvo Str.
Geo Milev Residential Complex
Slatina District
1111 Sofia / BG
[2018/35]
Former [2014/09]For all designated states
SR Technologies (SRT) Ltd.
66 Ekhzarh Joseph Str.
1000 Sofia / BG
Former [2013/12]For all designated states
Soukou, Eleftheria
18 A Kantonia Str.
41 222 Larisa / GR
Inventor(s)01 / Soukou, Eleftheria
18A Kantonia Str. 41
222 Larisa / GR
 [2014/09]
Former [2013/12]01 / see applicant
...
Representative(s)(deleted)
[2021/32]
Former [2013/12]Panagiotidou, Effimia
3 Aristotelous str.
546 24 Thessaloniki / GR
Application number, filing date11727752.510.05.2011
[2021/32]
WO2011GR00019
Priority number, dateGR2010010026710.05.2010         Original published format: GR 20100100267
[2013/12]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2011141757
Date:17.11.2011
Language:EN
[2011/46]
Type: A2 Application without search report 
No.:EP2569102
Date:20.03.2013
Language:EN
The application published by WIPO in one of the EPO official languages on 17.11.2011 takes the place of the publication of the European patent application.
[2013/12]
Type: B1 Patent specification 
No.:EP2569102
Date:11.08.2021
Language:EN
[2021/32]
Search report(s)International search report - published on:EP07.03.2013
ClassificationIPC:B09B3/00, B07B1/20, B07B1/22, B03B9/06, A61L11/00, B01F7/00
[2020/49]
CPC:
B09B3/50 (EP,GR,US); A61L11/00 (EP); B01F27/1145 (EP);
B01F27/2123 (EP); B03B9/06 (EP,GR); B07B1/20 (EP,GR);
B07B1/22 (EP,GR); B09B3/32 (EP,GR,US); B09B3/35 (EP,GR,US);
C05F17/30 (GR); Y02W30/40 (EP); Y02W30/52 (EP);
Y02W30/62 (EP) (-)
Former IPC [2013/12]B09B3/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/12]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SYSTEM ZUR AUFBEREITUNG VON HAUSMÜLL[2020/49]
English:SYSTEM FOR TREATMENT OF MUNICIPAL SOLID WASTE[2021/18]
French:SYSTÈME DE TRAITEMENT DE DÉCHETS SOLIDES MUNICIPAUX[2020/49]
Former [2013/12]KALTVERFAHREN UND SYSTEM ZUR AUFBEREITUNG VON HAUSMÜLL
Former [2013/12]COLD METHOD AND TREATMENT SYSTEM OF MUNICIPAL SOLID WASTE
Former [2013/12]PROCÉDÉ ET SYSTÈME DE TRAITEMENT À FROID DE DÉCHETS SOLIDES MUNICIPAUX
Entry into regional phase04.12.2012National basic fee paid 
04.12.2012Designation fee(s) paid 
04.12.2012Examination fee paid 
Examination procedure06.12.2012Examination requested  [2013/12]
10.09.2013Amendment by applicant (claims and/or description)
07.11.2013Despatch of communication of loss of particular rights: Claims {1}
27.09.2017Despatch of a communication from the examining division (Time limit: M04)
02.02.2018Reply to a communication from the examining division
30.07.2018Invitation to indicate the basis for amendments (Time limit: M01)
10.08.2018Reply to an invitation to indicate the basis for amendments
09.12.2019Despatch of a communication from the examining division (Time limit: M06)
28.04.2020Reply to a communication from the examining division
24.11.2020Communication of intention to grant the patent
19.03.2021Fee for grant paid
19.03.2021Fee for publishing/printing paid
24.03.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  27.09.2017
Opposition(s)12.05.2022No opposition filed within time limit [2022/29]
Request for further processing for:Loss of rights: Claims
17.01.2014Request for further processing filed
17.01.2014Full payment received (date of receipt of payment)
Request granted
14.05.2014Decision despatched
27.01.2014Request for further processing filed
27.01.2014Full payment received (date of receipt of payment)
Request granted
14.05.2014Decision despatched
Fees paidRenewal fee
23.05.2013Renewal fee patent year 03
30.04.2014Renewal fee patent year 04
30.04.2015Renewal fee patent year 05
09.05.2016Renewal fee patent year 06
03.05.2017Renewal fee patent year 07
24.04.2018Renewal fee patent year 08
14.06.2019Renewal fee patent year 09
12.05.2020Renewal fee patent year 10
17.05.2021Renewal fee patent year 11
Penalty fee
Additional fee for renewal fee
31.05.201909   M06   Fee paid on   14.06.2019
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.05.2011
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
MK11.08.2021
MT11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
TR11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB10.05.2022
IE10.05.2022
LU10.05.2022
[2024/41]
Former [2024/29]HU10.05.2011
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
MK11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
TR11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB10.05.2022
IE10.05.2022
LU10.05.2022
Former [2024/22]HU10.05.2011
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
MK11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB10.05.2022
IE10.05.2022
LU10.05.2022
Former [2024/20]HU10.05.2011
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB10.05.2022
IE10.05.2022
LU10.05.2022
Former [2024/18]HU10.05.2011
AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB10.05.2022
IE10.05.2022
LU10.05.2022
Former [2023/27]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB10.05.2022
IE10.05.2022
LU10.05.2022
Former [2023/20]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
IE10.05.2022
LU10.05.2022
Former [2023/08]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
LU10.05.2022
Former [2023/06]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/36]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/29]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/26]AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/24]AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/21]AT11.08.2021
DK11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/16]AT11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/10]AT11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/09]AT11.08.2021
ES11.08.2021
FI11.08.2021
LT11.08.2021
RS11.08.2021
SE11.08.2021
NO11.11.2021
PT13.12.2021
Former [2022/08]AT11.08.2021
ES11.08.2021
FI11.08.2021
LT11.08.2021
SE11.08.2021
NO11.11.2021
Former [2022/07]AT11.08.2021
LT11.08.2021
NO11.11.2021
Cited inInternational search[YA] WO2004028715  (SAVORET JEAN-LOUIS et al.) [Y] 1,2 * abstract * * page 1, line 4 - page 3, line 11 * * page 4, line 5 - line 33 * * page 7, line 19 - line 33 * * claim - * * figure . *[A] 3
 [YA] CN201094752  (MINGQUAN ZHOU et al.) [Y] 1,2 * abstract *[A] 3
 [A] EP0995502  (TOIA MARIO FERNANDO et al.) [A] 1,3 * abstract * * paragraph [0042] - paragraph [0047] * * claim - * * figure - *
 [A] WO2008065452  (FUTURE FUELS INTERNATIONAL LTD et al.) [A] 1,3 * abstract * * page 2, line 27 - page 3, line 4 * * page 5, line 3 - page 6, line 13 * * page 7, line 18 - page 8, line 14 * * claim - * * figure - *
 [A] US2002096796  (DE LA CONCHA ESTRADA ERNESTO et al.) [A] 1,3 * abstract * * paragraph [0023] - paragraph [0026] * * claim - *
ExaminationWO2004028715
 CN201094752
 EP0995502
 WO2008065452
 US2002096796
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.