EP2524178 - THERMAL CONTROL OF THERMAL CHAMBER IN HIGH-PERFORMANCE LIQUID CHROMATOGRAPHY SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.04.2022 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 23.04.2021 | ||
Former | Grant of patent is intended Status updated on 21.12.2020 | ||
Former | Examination is in progress Status updated on 20.05.2019 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Waters Technologies Corporation 34 Maple Street Milford, MA 01757 / US | [2012/47] | Inventor(s) | 01 /
SHREVE, Joshua, A. 8 Dogwood Circle Franklin MA 02038 / US | 02 /
CIAVARINI, Steven, J. 56 Fairway Circle Natick MA 01760 / US | [2012/47] | Representative(s) | Forresters IP LLP Skygarden Erika-Mann-Straße 11 80636 München / DE | [2021/21] |
Former [2012/47] | Harding, Andrew Philip Forresters Skygarden Erika-Mann-Strasse 11 80636 München / DE | Application number, filing date | 11732291.7 | 11.01.2011 | [2021/21] | WO2011US20725 | Priority number, date | US20100293827P | 11.01.2010 Original published format: US 293827 P | [2012/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011085337 | Date: | 14.07.2011 | Language: | EN | [2011/28] | Type: | A1 Application with search report | No.: | EP2524178 | Date: | 21.11.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.07.2011 takes the place of the publication of the European patent application. | [2012/47] | Type: | B1 Patent specification | No.: | EP2524178 | Date: | 26.05.2021 | Language: | EN | [2021/21] | Search report(s) | International search report - published on: | US | 14.07.2011 | (Supplementary) European search report - dispatched on: | EP | 23.02.2018 | Classification | IPC: | F25B21/02 | [2012/47] | CPC: |
F25B21/02 (EP,US);
G01N30/24 (EP,US);
G01N30/30 (EP,US);
F25B2321/0212 (EP,US);
F25B2321/0251 (EP,US);
F25B2700/2103 (EP,US);
F25D2700/02 (EP,US);
F25D2700/12 (EP,US);
F25D2700/123 (EP,US);
G01N2030/303 (EP,US)
(-)
| C-Set: |
G01N2030/303, G01N30/24 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | WÄRMESTEUERUNG EINER WÄRMEKAMMER IN HOCHLEISTUNGS-FLÜSSIGCHROMATOGRAPHIESYSTEMEN | [2012/47] | English: | THERMAL CONTROL OF THERMAL CHAMBER IN HIGH-PERFORMANCE LIQUID CHROMATOGRAPHY SYSTEMS | [2012/47] | French: | COMMANDE THERMIQUE D'UNE CHAMBRE THERMIQUE DANS DES SYSTÈMES DE CHROMATOGRAPHIE LIQUIDE HAUTE PERFORMANCE | [2012/47] | Entry into regional phase | 19.06.2012 | National basic fee paid | 19.06.2012 | Search fee paid | 19.06.2012 | Designation fee(s) paid | 19.06.2012 | Examination fee paid | Examination procedure | 19.06.2012 | Examination requested [2012/47] | 24.09.2018 | Amendment by applicant (claims and/or description) | 23.05.2019 | Despatch of a communication from the examining division (Time limit: M06) | 28.11.2019 | Reply to a communication from the examining division | 18.09.2020 | Cancellation of oral proceeding that was planned for 19.10.2020 | 19.10.2020 | Date of oral proceedings (cancelled) | 22.12.2020 | Communication of intention to grant the patent | 19.04.2021 | Fee for grant paid | 19.04.2021 | Fee for publishing/printing paid | 19.04.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.05.2019 | Opposition(s) | 01.03.2022 | No opposition filed within time limit [2022/18] | Fees paid | Renewal fee | 25.01.2013 | Renewal fee patent year 03 | 27.01.2014 | Renewal fee patent year 04 | 27.01.2015 | Renewal fee patent year 05 | 27.01.2016 | Renewal fee patent year 06 | 27.01.2017 | Renewal fee patent year 07 | 29.01.2018 | Renewal fee patent year 08 | 24.01.2019 | Renewal fee patent year 09 | 21.01.2020 | Renewal fee patent year 10 | 20.01.2021 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.01.2011 | AL | 26.05.2021 | AT | 26.05.2021 | CY | 26.05.2021 | CZ | 26.05.2021 | DK | 26.05.2021 | EE | 26.05.2021 | ES | 26.05.2021 | FI | 26.05.2021 | HR | 26.05.2021 | IT | 26.05.2021 | LT | 26.05.2021 | LV | 26.05.2021 | MC | 26.05.2021 | MK | 26.05.2021 | MT | 26.05.2021 | NL | 26.05.2021 | PL | 26.05.2021 | RO | 26.05.2021 | RS | 26.05.2021 | SE | 26.05.2021 | SI | 26.05.2021 | SK | 26.05.2021 | SM | 26.05.2021 | TR | 26.05.2021 | BG | 26.08.2021 | NO | 26.08.2021 | GR | 27.08.2021 | IS | 26.09.2021 | PT | 27.09.2021 | IE | 11.01.2022 | LU | 11.01.2022 | BE | 31.01.2022 | CH | 31.01.2022 | FR | 31.01.2022 | LI | 31.01.2022 | [2024/41] |
Former [2024/29] | HU | 11.01.2011 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
MK | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
TR | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 11.01.2022 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2024/22] | HU | 11.01.2011 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
MK | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 11.01.2022 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2024/20] | HU | 11.01.2011 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 11.01.2022 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2024/18] | HU | 11.01.2011 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 11.01.2022 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/09] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 11.01.2022 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/03] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
FR | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/01] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
LU | 11.01.2022 | ||
BE | 31.01.2022 | ||
FR | 31.01.2022 | ||
Former [2022/50] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
LU | 11.01.2022 | ||
FR | 31.01.2022 | ||
Former [2022/46] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
LU | 11.01.2022 | ||
Former [2022/39] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/36] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/29] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/26] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/23] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/10] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/08] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/07] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/04] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/52] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/51] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/50] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
Former [2021/49] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
Former [2021/47] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
LT | 26.05.2021 | ||
BG | 26.08.2021 | ||
Former [2021/46] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
LT | 26.05.2021 | Documents cited: | Search | [XI]US2008022696 (WELLE RICHARD P [US], et al) [X] 1,2,8 * paragraph [0030] - paragraph [0067]; figures 1-9 * [I] 3-7,9-15; | [XI]WO2009150725 (NAGAO YASUMASA [JP], et al) [X] 1,2,8 * paragraph [0082] - paragraph [0187]; figures 1-12 *[I] 3-7,9-15 | International search | [Y]US4328676 (REED MICHAEL A); | [Y]US5290340 (GATTEN RONALD A [US], et al); | [Y]US6052998 (DAGE GERHARD ALLAN [US], et al); | [Y]US6632015 (NAGASAWA JUN [JP]); | [Y]US2005039465 (WELCH JOHN T [US]); | [Y]US2005174737 (MEIR RONEN [IL]); | [Y]US2009062965 (ALHILO ESAN A [US]) | by applicant | US2008022696 |