EP2591389 - METHOD AND DEVICE FOR THREE-DIMENSIONAL IMAGING BY FULL-FIELD INTERFERENTIAL MICROSCOPY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.04.2019 Database last updated on 12.10.2024 | |
Former | The patent has been granted Status updated on 04.05.2018 | ||
Former | Grant of patent is intended Status updated on 27.04.2018 | ||
Former | Examination is in progress Status updated on 19.04.2018 | ||
Former | Grant of patent is intended Status updated on 14.12.2017 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): MK | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states LLtech Management Pépinière Paris Santé Cochin 2ème étage 29 rue du Faubourg Saint Jacques 75014 Paris / FR | [2013/20] | Inventor(s) | 01 /
BOCCARA, Albert Claude 54 rue de la Verrerie F-75004 Paris / FR | 02 /
HARMS, Fabrice 2 bis rue Florian F-91400 Orsay / FR | 03 /
LE CONTE CHRESTIEN DE POLY, Bertrand 29 rue des Favorites F-75015 Paris / FR | [2013/20] | Representative(s) | Osha BWB 2, rue de la Paix 75002 Paris / FR | [N/P] |
Former [2018/23] | Osha Liang 2, rue de la Paix 75002 Paris / FR | ||
Former [2013/20] | Brochard, Pascale, et al Osha Liang 32, avenue de l'Opéra F-75002 Paris / FR | Application number, filing date | 11738662.3 | 08.07.2011 | [2018/23] | WO2011EP61633 | Priority number, date | FR20100057268 | 13.09.2010 Original published format: FR 1057268 | US20100362578P | 08.07.2010 Original published format: US 362578 P | [2013/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012004388 | Date: | 12.01.2012 | Language: | EN | [2012/02] | Type: | A1 Application with search report | No.: | EP2591389 | Date: | 15.05.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.01.2012 takes the place of the publication of the European patent application. | [2013/20] | Type: | B1 Patent specification | No.: | EP2591389 | Date: | 06.06.2018 | Language: | EN | [2018/23] | Search report(s) | International search report - published on: | EP | 12.01.2012 | Classification | IPC: | G01J3/02, G01B9/02, A61B5/00, G01J3/10, G01J3/28, G01J3/45, G01B11/24, G02B21/14 | [2018/02] | CPC: |
G01B9/02091 (EP,US);
A61B5/0066 (EP,US);
G01B11/2441 (EP,US);
G01B9/02048 (EP,US);
G01B9/02057 (EP,US);
G01J3/0208 (EP,US);
G01J3/0237 (EP,US);
G01J3/10 (EP,US);
G01J3/2823 (EP,US);
|
Former IPC [2013/20] | G02B21/00, G02B9/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG FÜR DREIDIMENSIONALE BILDGEBUNG ANHAND VON VOLLFELD-INTERFERENZMIKROSKOPIE | [2013/20] | English: | METHOD AND DEVICE FOR THREE-DIMENSIONAL IMAGING BY FULL-FIELD INTERFERENTIAL MICROSCOPY | [2013/20] | French: | PROCÉDÉ ET DISPOSITIF POUR L'IMAGERIE TRIDIMENSIONNELLE PAR LA MICROSCOPIE INTERFÉRENTIELLE PLEIN CHAMP | [2013/20] | Entry into regional phase | 04.02.2013 | National basic fee paid | 04.02.2013 | Designation fee(s) paid | 04.02.2013 | Examination fee paid | Examination procedure | 04.02.2013 | Examination requested [2013/20] | 13.08.2013 | Amendment by applicant (claims and/or description) | 04.08.2015 | Despatch of a communication from the examining division (Time limit: M04) | 30.11.2015 | Reply to a communication from the examining division | 15.12.2017 | Communication of intention to grant the patent | 17.04.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 17.04.2018 | Fee for grant paid | 17.04.2018 | Fee for publishing/printing paid | 26.04.2018 | Information about intention to grant a patent | 26.04.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 04.08.2015 | Opposition(s) | 07.03.2019 | No opposition filed within time limit [2019/20] | Fees paid | Renewal fee | 17.07.2013 | Renewal fee patent year 03 | 21.07.2014 | Renewal fee patent year 04 | 20.07.2015 | Renewal fee patent year 05 | 08.07.2016 | Renewal fee patent year 06 | 18.07.2017 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.07.2011 | AL | 06.06.2018 | AT | 06.06.2018 | CY | 06.06.2018 | CZ | 06.06.2018 | DK | 06.06.2018 | EE | 06.06.2018 | ES | 06.06.2018 | FI | 06.06.2018 | HR | 06.06.2018 | IT | 06.06.2018 | LT | 06.06.2018 | LV | 06.06.2018 | MC | 06.06.2018 | MK | 06.06.2018 | NL | 06.06.2018 | PL | 06.06.2018 | PT | 06.06.2018 | RO | 06.06.2018 | RS | 06.06.2018 | SE | 06.06.2018 | SI | 06.06.2018 | SK | 06.06.2018 | SM | 06.06.2018 | TR | 06.06.2018 | IE | 08.07.2018 | LU | 08.07.2018 | MT | 08.07.2018 | BG | 06.09.2018 | NO | 06.09.2018 | GR | 07.09.2018 | IS | 06.10.2018 | [2020/31] |
Former [2020/27] | HU | 08.07.2011 | |
AL | 06.06.2018 | ||
AT | 06.06.2018 | ||
CY | 06.06.2018 | ||
CZ | 06.06.2018 | ||
DK | 06.06.2018 | ||
EE | 06.06.2018 | ||
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
IT | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
MC | 06.06.2018 | ||
NL | 06.06.2018 | ||
PL | 06.06.2018 | ||
PT | 06.06.2018 | ||
RO | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
SI | 06.06.2018 | ||
SK | 06.06.2018 | ||
SM | 06.06.2018 | ||
TR | 06.06.2018 | ||
IE | 08.07.2018 | ||
LU | 08.07.2018 | ||
MT | 08.07.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
IS | 06.10.2018 | ||
Former [2020/16] | AL | 06.06.2018 | |
AT | 06.06.2018 | ||
CY | 06.06.2018 | ||
CZ | 06.06.2018 | ||
DK | 06.06.2018 | ||
EE | 06.06.2018 | ||
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
IT | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
MC | 06.06.2018 | ||
NL | 06.06.2018 | ||
PL | 06.06.2018 | ||
RO | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
SI | 06.06.2018 | ||
SK | 06.06.2018 | ||
SM | 06.06.2018 | ||
TR | 06.06.2018 | ||
IE | 08.07.2018 | ||
LU | 08.07.2018 | ||
MT | 08.07.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
IS | 06.10.2018 | ||
Former [2020/08] | AL | 06.06.2018 | |
AT | 06.06.2018 | ||
CY | 06.06.2018 | ||
CZ | 06.06.2018 | ||
DK | 06.06.2018 | ||
EE | 06.06.2018 | ||
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
IT | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
MC | 06.06.2018 | ||
NL | 06.06.2018 | ||
PL | 06.06.2018 | ||
RO | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
SI | 06.06.2018 | ||
SK | 06.06.2018 | ||
SM | 06.06.2018 | ||
IE | 08.07.2018 | ||
LU | 08.07.2018 | ||
MT | 08.07.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
IS | 06.10.2018 | ||
Former [2019/51] | AL | 06.06.2018 | |
AT | 06.06.2018 | ||
CY | 06.06.2018 | ||
CZ | 06.06.2018 | ||
DK | 06.06.2018 | ||
EE | 06.06.2018 | ||
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
IT | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
MC | 06.06.2018 | ||
NL | 06.06.2018 | ||
PL | 06.06.2018 | ||
RO | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
SI | 06.06.2018 | ||
SK | 06.06.2018 | ||
SM | 06.06.2018 | ||
IE | 08.07.2018 | ||
LU | 08.07.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
IS | 06.10.2018 | ||
Former [2019/26] | AT | 06.06.2018 | |
CY | 06.06.2018 | ||
CZ | 06.06.2018 | ||
DK | 06.06.2018 | ||
EE | 06.06.2018 | ||
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
IT | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
MC | 06.06.2018 | ||
NL | 06.06.2018 | ||
PL | 06.06.2018 | ||
RO | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
SI | 06.06.2018 | ||
SK | 06.06.2018 | ||
SM | 06.06.2018 | ||
IE | 08.07.2018 | ||
LU | 08.07.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
IS | 06.10.2018 | ||
Former [2019/19] | AT | 06.06.2018 | |
CY | 06.06.2018 | ||
CZ | 06.06.2018 | ||
EE | 06.06.2018 | ||
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
IT | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
MC | 06.06.2018 | ||
NL | 06.06.2018 | ||
PL | 06.06.2018 | ||
RO | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
SK | 06.06.2018 | ||
SM | 06.06.2018 | ||
IE | 08.07.2018 | ||
LU | 08.07.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
IS | 06.10.2018 | ||
Former [2019/17] | AT | 06.06.2018 | |
CY | 06.06.2018 | ||
CZ | 06.06.2018 | ||
EE | 06.06.2018 | ||
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
IT | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
MC | 06.06.2018 | ||
NL | 06.06.2018 | ||
PL | 06.06.2018 | ||
RO | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
SK | 06.06.2018 | ||
SM | 06.06.2018 | ||
LU | 08.07.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
IS | 06.10.2018 | ||
Former [2019/15] | AT | 06.06.2018 | |
CY | 06.06.2018 | ||
CZ | 06.06.2018 | ||
EE | 06.06.2018 | ||
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
IT | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
MC | 06.06.2018 | ||
NL | 06.06.2018 | ||
PL | 06.06.2018 | ||
RO | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
SK | 06.06.2018 | ||
SM | 06.06.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
IS | 06.10.2018 | ||
Former [2019/11] | AT | 06.06.2018 | |
CY | 06.06.2018 | ||
CZ | 06.06.2018 | ||
EE | 06.06.2018 | ||
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
IT | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
NL | 06.06.2018 | ||
PL | 06.06.2018 | ||
RO | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
SK | 06.06.2018 | ||
SM | 06.06.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
IS | 06.10.2018 | ||
Former [2019/10] | AT | 06.06.2018 | |
CY | 06.06.2018 | ||
CZ | 06.06.2018 | ||
EE | 06.06.2018 | ||
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
NL | 06.06.2018 | ||
PL | 06.06.2018 | ||
RO | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
SK | 06.06.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
IS | 06.10.2018 | ||
Former [2019/09] | CY | 06.06.2018 | |
EE | 06.06.2018 | ||
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
NL | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
IS | 06.10.2018 | ||
Former [2019/08] | CY | 06.06.2018 | |
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
NL | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
IS | 06.10.2018 | ||
Former [2019/03] | CY | 06.06.2018 | |
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
NL | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
Former [2018/52] | CY | 06.06.2018 | |
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
GR | 07.09.2018 | ||
Former [2018/51] | CY | 06.06.2018 | |
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
LT | 06.06.2018 | ||
LV | 06.06.2018 | ||
RS | 06.06.2018 | ||
SE | 06.06.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
Former [2018/50] | CY | 06.06.2018 | |
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
HR | 06.06.2018 | ||
LT | 06.06.2018 | ||
SE | 06.06.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
Former [2018/49] | CY | 06.06.2018 | |
ES | 06.06.2018 | ||
FI | 06.06.2018 | ||
LT | 06.06.2018 | ||
SE | 06.06.2018 | ||
BG | 06.09.2018 | ||
NO | 06.09.2018 | ||
Former [2018/47] | ES | 06.06.2018 | |
FI | 06.06.2018 | ||
LT | 06.06.2018 | ||
NO | 06.09.2018 | Cited in | International search | [XY]US2005225769 (BANKHEAD ANDREW D [GB], et al) [X] 1-3,6 * abstract * * paragraph [0045] - paragraph [0063] * * paragraph [0187] - paragraph [0190] * * figure 6 * [Y] 4,5,7,8; | [X]US5459564 (CHIVERS JAMES T [US]) [X] 1-3,6 * abstract * * column 4, line 35 - column 5, line 8 * * column 7, line 20 - line 49 * * figure 2 *; | [Y]US2004105100 (SHIRLEY LYLE [US]) [Y] 4,5,7,8 * abstract * * paragraph [0218] - paragraph [0223] * * paragraph [0264] * * figure 16 *; | [A]WO2005108915 (CARL MAHR HOLDING GMBH [DE], et al) [A] 4,5,7,8 * abstract * * page 9, paragraph 1 - page 15, paragraph 2 * * figures 1-5 * | Examination | FR2817030 | EP1892501 | EP1961374 | DE19624167 | by applicant | FR2817030 | - J.G. FUJIMOTO ET AL., "Optical biopsy and imaging using optical coherence tomography", NATURE MED., (1995), vol. 1, pages 970 - 972 | - A. DUBOIS ET AL., "High resolution full field optical coherence tomography with a Linnik microscope", APPL. OPT., (2002), vol. 41, doi:doi:10.1364/AO.41.000805, pages 805 - 812, XP002373646 DOI: http://dx.doi.org/10.1364/AO.41.000805 | - KARAMATA ET AL., "Multiple Scattering in optical coherence tomography II Experimental and theoretical investigation of crosstalk in wide-field optical coherence tomography", J. OPT. SOC. AM. A, (2005), vol. 22, no. 7 |