| EP2538718 - MOBILE TERMINAL DEVICE AND UPLINK CONTROL INFORMATION SIGNAL TRANSMISSION METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.05.2018 Database last updated on 18.03.2026 | |
| Former | The patent has been granted Status updated on 26.05.2017 | ||
| Former | Grant of patent is intended Status updated on 20.02.2017 | ||
| Former | Request for examination was made Status updated on 25.01.2017 | ||
| Former | Grant of patent is intended Status updated on 14.11.2016 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states NTT DOCOMO, INC. 11-1, Nagatacho 2-chome Chiyoda-ku Tokyo 100-6150 / JP | [2017/26] |
| Former [2012/52] | For all designated states NTT DOCOMO, INC. 11-1, Nagatacho 2-chome Chiyoda-ku Tokyo 100-6150 / JP | Inventor(s) | 01 /
KISHIYAMA, Yoshihisa c/o Intellectual Property Department NTT DOCOMO INC. SANNO PARK TOWER 11-1, Nagatacho 2-chome, Chiyoda-ku Tokyo 100-6150 / JP | 02 /
KAWAMURA, Teruo c/o Intellectual Property Department NTT DOCOMO INC. SANNO PARK TOWER 11-1, Nagatacho 2-chome, Chiyoda-ku Tokyo 100-6150 / JP | 03 /
NISHIKAWA, Daisuke c/o Intellectual Property Department NTT DOCOMO INC. SANNO PARK TOWER 11-1, Nagatacho 2-chome, Chiyoda-ku Tokyo 100-6150 / JP | [2012/52] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2017/26] |
| Former [2012/52] | HOFFMANN EITLE Patent- und Rechtsanwälte Arabellastraße 4 81925 München / DE | Application number, filing date | 11742354.1 | 15.02.2011 | [2017/26] | WO2011JP53081 | Priority number, date | JP20100181684 | 16.08.2010 Original published format: JP 2010181684 | JP20100030374 | 15.02.2010 Original published format: JP 2010030374 | [2012/52] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011099615 | Date: | 18.08.2011 | Language: | JA | [2011/33] | Type: | A1 Application with search report | No.: | EP2538718 | Date: | 26.12.2012 | Language: | EN | [2012/52] | Type: | B1 Patent specification | No.: | EP2538718 | Date: | 28.06.2017 | Language: | EN | [2017/26] | Search report(s) | International search report - published on: | JP | 18.08.2011 | (Supplementary) European search report - dispatched on: | EP | 19.05.2015 | Classification | IPC: | H04W52/34, H04W52/36, H04W28/06, H04W72/04, H04L5/00, H04W28/04 | [2016/48] | CPC: |
H04L5/001 (EP,CN,KR,US);
H04L5/0053 (EP,CN,KR,US);
H04W72/21 (US);
H04L5/0007 (EP,CN,KR,US);
H04W28/04 (US);
H04W52/34 (US);
|
| Former IPC [2015/25] | H04W28/06, H04W72/04, H04L5/00, H04W52/36, H04W28/04 | ||
| Former IPC [2012/52] | H04W28/06, H04W72/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | MOBILES ENDGERÄT UND VERFAHREN ZUR ÜBERTRAGUNG VON UPLINK-STEUERINFORMATIONSSIGNALEN | [2012/52] | English: | MOBILE TERMINAL DEVICE AND UPLINK CONTROL INFORMATION SIGNAL TRANSMISSION METHOD | [2012/52] | French: | DISPOSITIF DE TERMINAL MOBILE ET PROCÉDÉ DE TRANSMISSION DE SIGNAL D'INFORMATION DE COMMANDE DE LIAISON MONTANTE | [2012/52] | Entry into regional phase | 10.09.2012 | Translation filed | 10.09.2012 | National basic fee paid | 10.09.2012 | Search fee paid | 10.09.2012 | Designation fee(s) paid | 10.09.2012 | Examination fee paid | Examination procedure | 10.09.2012 | Examination requested [2012/52] | 23.09.2015 | Amendment by applicant (claims and/or description) | 15.11.2016 | Communication of intention to grant the patent | 23.01.2017 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 21.02.2017 | Communication of intention to grant the patent | 15.05.2017 | Fee for grant paid | 15.05.2017 | Fee for publishing/printing paid | 15.05.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | EP17151160.3 / EP3174347 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.11.2016 | Opposition(s) | 29.03.2018 | No opposition filed within time limit [2018/23] | Fees paid | Renewal fee | 20.02.2013 | Renewal fee patent year 03 | 18.02.2014 | Renewal fee patent year 04 | 18.02.2015 | Renewal fee patent year 05 | 24.02.2016 | Renewal fee patent year 06 | 17.02.2017 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.02.2011 | AL | 28.06.2017 | AT | 28.06.2017 | CY | 28.06.2017 | CZ | 28.06.2017 | EE | 28.06.2017 | ES | 28.06.2017 | FI | 28.06.2017 | HR | 28.06.2017 | IT | 28.06.2017 | LT | 28.06.2017 | LV | 28.06.2017 | MC | 28.06.2017 | MK | 28.06.2017 | NL | 28.06.2017 | PL | 28.06.2017 | PT | 28.06.2017 | RO | 28.06.2017 | RS | 28.06.2017 | SE | 28.06.2017 | SI | 28.06.2017 | SK | 28.06.2017 | SM | 28.06.2017 | TR | 28.06.2017 | BG | 28.09.2017 | NO | 28.09.2017 | GR | 29.09.2017 | IS | 28.10.2017 | IE | 15.02.2018 | LU | 15.02.2018 | MT | 15.02.2018 | BE | 28.02.2018 | FR | 28.02.2018 | [2020/33] |
| Former [2020/31] | HU | 15.02.2011 | |
| AT | 28.06.2017 | ||
| CY | 28.06.2017 | ||
| CZ | 28.06.2017 | ||
| EE | 28.06.2017 | ||
| ES | 28.06.2017 | ||
| FI | 28.06.2017 | ||
| HR | 28.06.2017 | ||
| IT | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| MC | 28.06.2017 | ||
| MK | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| PL | 28.06.2017 | ||
| PT | 28.06.2017 | ||
| RO | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| SI | 28.06.2017 | ||
| SK | 28.06.2017 | ||
| SM | 28.06.2017 | ||
| TR | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| IS | 28.10.2017 | ||
| IE | 15.02.2018 | ||
| LU | 15.02.2018 | ||
| MT | 15.02.2018 | ||
| BE | 28.02.2018 | ||
| FR | 28.02.2018 | ||
| Former [2020/27] | HU | 15.02.2011 | |
| AT | 28.06.2017 | ||
| CZ | 28.06.2017 | ||
| EE | 28.06.2017 | ||
| ES | 28.06.2017 | ||
| FI | 28.06.2017 | ||
| HR | 28.06.2017 | ||
| IT | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| MC | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| PL | 28.06.2017 | ||
| PT | 28.06.2017 | ||
| RO | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| SI | 28.06.2017 | ||
| SK | 28.06.2017 | ||
| SM | 28.06.2017 | ||
| TR | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| IS | 28.10.2017 | ||
| IE | 15.02.2018 | ||
| LU | 15.02.2018 | ||
| MT | 15.02.2018 | ||
| BE | 28.02.2018 | ||
| FR | 28.02.2018 | ||
| Former [2020/15] | AT | 28.06.2017 | |
| CZ | 28.06.2017 | ||
| EE | 28.06.2017 | ||
| ES | 28.06.2017 | ||
| FI | 28.06.2017 | ||
| HR | 28.06.2017 | ||
| IT | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| MC | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| PL | 28.06.2017 | ||
| RO | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| SI | 28.06.2017 | ||
| SK | 28.06.2017 | ||
| SM | 28.06.2017 | ||
| TR | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| IS | 28.10.2017 | ||
| IE | 15.02.2018 | ||
| LU | 15.02.2018 | ||
| MT | 15.02.2018 | ||
| BE | 28.02.2018 | ||
| FR | 28.02.2018 | ||
| Former [2020/08] | AT | 28.06.2017 | |
| CZ | 28.06.2017 | ||
| EE | 28.06.2017 | ||
| ES | 28.06.2017 | ||
| FI | 28.06.2017 | ||
| HR | 28.06.2017 | ||
| IT | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| MC | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| PL | 28.06.2017 | ||
| RO | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| SI | 28.06.2017 | ||
| SK | 28.06.2017 | ||
| SM | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| IS | 28.10.2017 | ||
| IE | 15.02.2018 | ||
| LU | 15.02.2018 | ||
| MT | 15.02.2018 | ||
| BE | 28.02.2018 | ||
| FR | 28.02.2018 | ||
| Former [2019/12] | AT | 28.06.2017 | |
| CZ | 28.06.2017 | ||
| EE | 28.06.2017 | ||
| ES | 28.06.2017 | ||
| FI | 28.06.2017 | ||
| HR | 28.06.2017 | ||
| IT | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| MC | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| PL | 28.06.2017 | ||
| RO | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| SI | 28.06.2017 | ||
| SK | 28.06.2017 | ||
| SM | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| IS | 28.10.2017 | ||
| IE | 15.02.2018 | ||
| LU | 15.02.2018 | ||
| BE | 28.02.2018 | ||
| FR | 28.02.2018 | ||
| Former [2019/09] | AT | 28.06.2017 | |
| CZ | 28.06.2017 | ||
| EE | 28.06.2017 | ||
| ES | 28.06.2017 | ||
| FI | 28.06.2017 | ||
| HR | 28.06.2017 | ||
| IT | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| MC | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| PL | 28.06.2017 | ||
| RO | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| SI | 28.06.2017 | ||
| SK | 28.06.2017 | ||
| SM | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| IS | 28.10.2017 | ||
| IE | 15.02.2018 | ||
| LU | 15.02.2018 | ||
| Former [2018/52] | AT | 28.06.2017 | |
| CZ | 28.06.2017 | ||
| EE | 28.06.2017 | ||
| ES | 28.06.2017 | ||
| FI | 28.06.2017 | ||
| HR | 28.06.2017 | ||
| IT | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| MC | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| PL | 28.06.2017 | ||
| RO | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| SI | 28.06.2017 | ||
| SK | 28.06.2017 | ||
| SM | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| IS | 28.10.2017 | ||
| LU | 15.02.2018 | ||
| Former [2018/44] | AT | 28.06.2017 | |
| CZ | 28.06.2017 | ||
| EE | 28.06.2017 | ||
| ES | 28.06.2017 | ||
| FI | 28.06.2017 | ||
| HR | 28.06.2017 | ||
| IT | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| MC | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| PL | 28.06.2017 | ||
| RO | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| SI | 28.06.2017 | ||
| SK | 28.06.2017 | ||
| SM | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| IS | 28.10.2017 | ||
| Former [2018/39] | AT | 28.06.2017 | |
| CZ | 28.06.2017 | ||
| EE | 28.06.2017 | ||
| ES | 28.06.2017 | ||
| FI | 28.06.2017 | ||
| HR | 28.06.2017 | ||
| IT | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| PL | 28.06.2017 | ||
| RO | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| SI | 28.06.2017 | ||
| SK | 28.06.2017 | ||
| SM | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| IS | 28.10.2017 | ||
| Former [2018/11] | AT | 28.06.2017 | |
| CZ | 28.06.2017 | ||
| EE | 28.06.2017 | ||
| ES | 28.06.2017 | ||
| FI | 28.06.2017 | ||
| HR | 28.06.2017 | ||
| IT | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| PL | 28.06.2017 | ||
| RO | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| SK | 28.06.2017 | ||
| SM | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| IS | 28.10.2017 | ||
| Former [2018/10] | AT | 28.06.2017 | |
| CZ | 28.06.2017 | ||
| EE | 28.06.2017 | ||
| FI | 28.06.2017 | ||
| HR | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| RO | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| SK | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| Former [2018/09] | EE | 28.06.2017 | |
| FI | 28.06.2017 | ||
| HR | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| Former [2017/52] | FI | 28.06.2017 | |
| HR | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| NL | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| Former [2017/50] | FI | 28.06.2017 | |
| HR | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| LV | 28.06.2017 | ||
| RS | 28.06.2017 | ||
| SE | 28.06.2017 | ||
| BG | 28.09.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | ||
| Former [2017/49] | FI | 28.06.2017 | |
| HR | 28.06.2017 | ||
| LT | 28.06.2017 | ||
| NO | 28.09.2017 | ||
| GR | 29.09.2017 | Documents cited: | Search | [X] EP1892987 (NTT DOCOMO INC et al.) [X] 1-10 * abstract * * paragraphs [0006] , [0 11] - [0016] - [0 45] , [0 61] - [0062] - [0 82] , [ 105] * | [E] EP2334114 (SHARP KK et al.) [E] 1,10 * abstract * * paragraphs [0004] - [0005] * | [X] LG ELECTRONICS: "UCI piggyback onto PUSCH in LTE-Advanced", 3GPP DRAFT; R1-100218 LTEA_UCI PIGGYBACK, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Valencia, Spain; 20100118, 12 January 2010 (2010-01-12), XP050417910 [X] 1-10 * paragraph [002.] * | International search | [X] LG ELECTRONICS: "UCI piggyback onto PUSCH in LTE-Advanced", 3GPP TSG RAN WG1 MEETING #59BIS, R1-100218, 22 January 2010 (2010-01-22), pages 1 - 5, XP050417910 | [X] CMCC: "UL ACK/NAK and CQI feedback in Carrier Aggregation", 3GPP TSG RAN WG1 MEETING #58BIS, R1-094037, 16 October 2009 (2009-10-16), pages 1 - 4, XP050388524 [X] | [A] ETRI: "UCI multiplexing with data on PUSCH", 3GPP TSG RAN WG1 MEETING #59BIS, R1-100465, 22 January 2010 (2010-01-22), pages 1 - 2, XP050597955 [A] | [A] SAMSUNG: "UL TPC in Rel.10", 3GPP TSG RAN WG1 MEETING #59BIS, R1-100100, 23 January 2010 (2010-01-23), pages 1 - 4, XP050417835 [A] | by applicant | "Feasibility Study for Evolved UTRA and UTRAN", 3GPP, TR25.912 (V7.1.0, September 2006 (2006-09-01) |